Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksROSE.L Regulatory News (ROSE)

  • There is currently no data for ROSE

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Arizona Breccia Pipe Update

3 May 2007 07:00

Vane Minerals PLC03 May 2007 3rd May 2007 VANE Minerals Plc (AIM:VML) Arizona Breccia Pipe Uranium Exploration Update VANE Minerals Plc ("VANE" or "the Company") is pleased to provide an update onits breccia pipe uranium exploration activities in northern Arizona, operatingas VANE Minerals (US) LLC, its wholly-owned uranium subsidiary. The schedule of the drilling programme for the Miller, Big Red, and Red DikePipes has been modified in order to complete the work obligations required bythe State of Arizona within the stated time constraints of the explorationpermits. Exploration programmes are required to be completed within one year ofapproval. Due to limited rig availability,and adverse weather one of the threedrill holes planned for the Miller Pipe was completed and the rig was then movedon to Big Red, followed by Red Dike, in order to satisfy those work commitments. DRILLING PROJECTS Miller Pipe Project Hole 691-1 was completed to a depth of 1445 feet (441m). The hole was designedto offset, 60 feet (18m) to the northeast, the mineralised zones encountered inholes 1640-3 and 1640-5 drilled by Energy Fuels Nuclear, Inc in the 1980's. Hole691-1 deviated 44 feet (13m) northeast from the collar and out of the pipe andwas barren of uranium mineralisation. The geological results indicate thehigh-grade mineralisation encountered in the old holes is contained in theannular ring fractures of the pipe and that hole 691-1 is outside the annularrings. Further exploration drilling will focus on the annular rings as well asthe pipe interior and the next hole is planned for the inferred western portionof the pipe, which has not yet been tested. Annular ring mineralisationaccounted for substantial uranium tonnage in other pipes in the district,particularly the Orphan Mine, which historically produced 5 million pounds ofuranium oxide ("U3O8"), in addition to mineralisation in the pipe cores.Drilling will resume at Miller when the rig is released from the other VANEprojects.. Big Red Pipe Project Hole 696-1 was completed to a depth of 1144 feet (349m). The hole was located inthe inferred centre of the pipe based on historic drilling data. The holeintersected the pipe from the collar to some point above the Coconino Sandstoneformation (above 600 feet (183m)) and from there remained outside the pipe toits completed depth. The log showed weak anomalous gamma radioactivity.Favourable alteration was observed in core and drill cuttings in the formationat and below the expected level of uranium deposition. Both the gamma log andalteration are highly encouraging indications that the pipe has undergone amineralising event and could contain a uranium deposit. Based on results, thepipe centre is estimated to be located north of hole 696-1. The rig was moved to the Red Dike project to satisfy the permit agreement workrequirements, as stated above, and a second campaign of drilling on the Big RedPipe is now planned. Red Dike Pipe Project Drilling on hole 698-1 is in progress. Drilling production on this hole hasbeen slow due to difficult drilling conditions encountered in the upper part ofthe hole. This zone is at present being cased and drilling will resume oncompletion. Matthew Idiens, Director of Corporate Development commented "The potentialmineralised ore zone of a pipe is, as a result of the high grades found,relatively small and therefore it can take a few drill holes to intersect thezone properly. As an example, 3m lbs U3O8 at a grade of 0.7% could be containedin approximately 255,000 tonnes. Therefore we are encouraged by the resultsobtained so far, none of which diminish our view of the favourability orpotential of any of the targets drilled. Since the 1980's, VANE is only thesecond company to drill on the south rim for breccia pipes and the third companyto initiate drilling in the breccia pipe district. With this in mind we aim touse the experience and expertise gained in this region to continue to expeditethe programme further and we are excited about the prospects of additionaldrilling on these targets." Kristopher K. Hefton, Chief Operating Officer VANE Minerals (US) LLC, BScGeology, who meets the criteria of a qualified person under the AIM Rules -Guidance for Mining, Oil and Gas Companies, has reviewed and approved thetechnical information contained within this announcement. Enquiries: VANE Minerals PlcMatthew Idiens+44 (0) 20 7667 6322 Ambrian Partners LimitedRichard Brown+44 (0) 20 7776 6417 Parkgreen CommunicationsCathy Malins/Annabel Leather+44 (0) 20 7851 7480 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Aug 202012:51 pmRNSChange of Name to Zephyr Energy plc & website
29th Jul 20203:17 pmRNSResult of AGM
30th Jun 20207:00 amRNSFinal Results and notice of AGM
8th Jun 20204:30 pmRNSHolding(s) in Company
29th May 20207:00 amRNSGrant of options
5th May 20204:20 pmRNSHolding(s) in Company
1st May 20207:00 amRNSOperations and Strategy Update
10th Feb 20207:00 amRNSUpdate on restructuring of the Paradox project
10th Feb 20207:00 amRNSUpdate on McCoy Lease Working Interest Acquisition
31st Dec 20191:00 pmRNSTotal Voting Rights
3rd Dec 201912:27 pmRNSIssue of Equity and change to TVR
29th Nov 20195:00 pmRNSTotal Voting Rights
22nd Nov 20194:52 pmRNSHolding(s) in Company
21st Nov 201912:43 pmRNSResult of General Meeting and change to TVR
14th Nov 20192:10 pmRNSHolding(s) in Company
8th Nov 20194:12 pmRNSHolding(s) in Company
4th Nov 20192:16 pmRNSDirector/PDMR shareholding
4th Nov 20197:05 amRNSIssue of equity and notice of general meeting
4th Nov 20197:00 amRNSProposed Acquisition-McCoy Interest & Fundraising
14th Oct 20197:00 amRNSRestructuring of the Paradox project
30th Sep 20197:00 amRNSHalf-year Report
3rd Sep 20197:00 amRNSDirectorate Changes and Board Restructuring
2nd Sep 201910:59 amRNSHolding(s) in Company
30th Aug 20195:00 pmRNSTotal Voting Rights
22nd Aug 20197:00 amRNSIssue of equity and change to total voting rights
30th Jul 201912:46 pmRNSResult of AGM and update on Board composition
10th Jul 20193:01 pmRNSHolding(s) in Company
28th Jun 20197:00 amRNSBoard appointment and update
28th Jun 20197:00 amRNSFinal Results
27th Jun 20197:00 amRNSNotice of Annual Results
3rd Jun 20197:00 amRNSTotal Voting Rights
24th May 20197:00 amRNSSubscription completion, board appointment & TVR
20th May 20197:00 amRNSIssue of equity and Board Changes
30th Apr 20197:00 amRNSUpdated Corporate Presentation
23rd Apr 20197:00 amRNSDirectorate Change
12th Apr 20193:40 pmRNSHolding(s) in Company
12th Apr 20197:00 amRNSDirector/PDMR Shareholding
11th Apr 20197:00 amRNSIssue of equity and Board Changes
28th Mar 20197:00 amRNSUpdate & Proposed Board Changes
26th Mar 20199:41 amRNSHolding in Company - Correction
12th Mar 20194:17 pmRNSHolding(s) in Company
5th Mar 20196:09 pmRNSHolding(s) in Company
5th Mar 20199:12 amRNSHolding(s) in Company
11th Jan 20197:00 amRNSAcquisition of additional acreage in Paradox Basin
7th Jan 20197:00 amRNSSchlumberger Study Results
6th Dec 20187:00 amRNSOperations Update
27th Nov 20187:00 amRNSDatabase Agreement & North Wash Vanadium update
1st Nov 20187:00 amRNSBLM Approval for Permit to Drill GV 22-1 well
3rd Oct 20187:00 amRNSHolding(s) in Company
25th Sep 20187:00 amRNSHalf-year Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.