First Quarter 2015 Production Results

27 Nov 2014 07:00

RNS Number : 1311Y
Rambler Metals & Mining PLC
27 November 2014
 



27 November 2014

 

First Quarter 2015 Production Results

 

London, England & Baie Verte, Newfoundland and Labrador, Canada -Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ('Rambler' or the 'Company'), a copper and gold producer operating in Newfoundland and Labrador, Canada, today provides an operational update for its first quarter, ending 31 October 2014 ('Q1 2015').

Highlights in the quarter:

· Q1 2015 results were within the guidance for the fiscal year and the Company remains on target to meet its annual production forecast.

· Dry tonnes milled of 58,546 tonnes, representing a 5 per cent increase on Q1 2014 results and a 2 per cent decrease on Q4 2014. This resulted in the production of:

o 1,447 tonnes of copper; 1,464 ounces of gold; 10,781 ounces of silver

 

· Production of 5,072 tonnes of copper concentrate representing a 15 per cent decrease over Q4 2014.

· Head grades, for the quarter of copper averaged 2.79 per cent; gold at 1.26 grammes per tonne; silver at 9.12 grammes per tonne.

· Recoveries to concentrate for copper 97.1 per cent, gold 69.2 per cent and silver 73.0 per cent for the quarter. All meeting or exceeding the communicated guidance.

· Concentrate grade of 28.52 per cent, 8.98 grammes per tonne and 66.11 grammes per tonne for copper, gold and silver respectively.

 

Norman Williams, CA, President and CEO, commented:

"With increases in milling throughput, and higher than planned copper recoveries, the Group produced just over 1,400 tonnes of copper metal and 1,400 ounces of gold.

"Although grades came in slightly below the planned run of mine head grade of 3.00 per cent, the Company managed to meet its forecasted metal production on the lower end of the guidance range for the three month period .

"During the quarter, the operations team made significant advancements in the Lower Footwall Zone ('DMS') demonstration plant project and also initiated an external resource estimation audit by an independent third party.

 

"The updated resource estimate will be the basis of the Company's economic plan and evaluation for a staged, lower capital expansion program into the Lower Footwall. The evaluation itself will then look at optimizing the underutilized copper floatation circuit at Nugget Pond, including the possibility of using dense media separation to pre-concentrate the material."

 

 

OPERATIONAL SUMMARY

For fiscal Q1 2015 the Company milled 58,546 dry metric tonnes of ore and produced 5,072 tonnes of copper concentrate containing 1,447 tonnes of copper metal, 1,464 ounces of gold and 10,781 ounces of silver. The average feed grade during this period was 2.79 per cent copper, 1.26 grammes per tonne gold and 9.12 grammes per tonne silver followed by a mill recovery of 97.1 per cent, 69.2 per cent and 73.0 per cent for copper, gold and silver respectively.

The Company first declared commercial production in November 2012 and has since milled 411,439 dry metric tonnes producing 44,521 tonnes of copper concentrate containing 12,872 tonnes of copper metal, 11,523 ounces of gold and 87,278 ounces of silver.

For the quarter the operation remained within the communicated 2015 production guidance, see Table 1 below. Details of the Company's financial performance, including capital expenditure and operating costs, will be included in its Q1 2015 financial results to be released on or before Tuesday 9 December 2014.

Table 1 - F2015 Production Guidance with Ore and Concentrate Production

Summary for Fiscal Q1 2015 (see Note 1 below)

 

PRODUCTION

Q1

2015

F2015

Guidance

Dry Tonnes Milled

58,546

215,000 - 230,000

Copper Recovery

97.1%

94 - 96 %

Gold Recovery

69.2%

65 - 70 %

Silver Recovery

73.0%

60 - 75 %

Copper Head Grade (%)

2.79

2.5 - 3.5

Gold Head Grade (g/t)

1.26

1.0 - 2.0

Silver Head Grade (g/t)

9.12

6.0 - 8.0

 

 

CONCENTRATE

(Delivered to Warehouse)

Copper (%)

28.52

27 - 30

Gold (g/t)

8.98

6 - 8

Silver (g/t)

66.11

45 - 55

Dry Tonnes Produced

5,072

20,000 - 24,000

Copper Metal (tonnes)

1,447

5,400 - 6,700

Gold (ounces)

1,464

5,600 - 6,600

Silver (ounces)

10,781

39,000 - 46,000

 

 

Quarter over Quarter (Q1 2014 vs Q1 2015 and Q4 2014 vs Q1 2015)

Table 2 below indicates the comparative results from Q1 2014 versus Q1 2015 and Q4 2014 versus Q1 2015. Metal recovery and dry tonnes milled in particular demonstrates the operational stability over the last twelve and six months.

Table 2 - Quarter over Quarter Results Comparison (see Note 1 below)

PRODUCTION

Q1 2014

(Aug, Sep, Oct)

Q1 2015

(Aug, Sep, Oct)

Q4 2014

(May, Jun, Jul)

Q1 2015

(Aug, Sep, Oct)

Dry Tonnes Milled

55,659

58,546

5%

59,526

58,546

-2%

Copper Recovery

95.9%

97.1%

1%

96.7 %

97.1%

0.4%

Gold Recovery

61.7%

69.2%

12%

71.0 %

69.2%

-3%

Silver Recovery

76.1%

73.0%

-4%

75.9 %

73.0%

-4%

Copper Head Grade (%)

3.71

2.79

-25%

3.24

2.79

-14%

Gold Head Grade (g/t)

1.64

1.26

-23%

1.65

1.26

-24%

Silver Head Grade (g/t)

9.22

9.12

-1%

12.60

9.12

-28%

 

 

CONCENTRATE

(Produced and Stored in Warehouse)

Copper (%)

29.68

28.52

-4%

28.47

28.52

0.2%

Gold (g/t)

7.81

8.98

15%

10.93

8.98

-18%

Silver (g/t)

56.01

66.11

18%

86.62

66.11

-24%

Dry Tonnes Produced

6,591

5,072

-23%

6,000

5,072

-15%

Copper Metal (tonnes)

1,956

1,447

-26%

1,708

1,447

-15%

Gold (ounces)

1,655

1,464

-12%

2,107

1,464

-31%

Silver (ounces)

11,870

10,781

-9%

16,708

10,781

-35%

 

Quarter over Quarter (Q4 2014 vs Q1 2015 and Q1 2014 vs Q1 2015)

· Production of 5,072 tonnes of copper concentrate representing a 23 per cent decrease over Q1 2014 and a 15 per cent decrease over Q4 2014.

· Dry tonnes milled of 58,546 tonnes representing a 5 per cent increase over Q1 2014 and a 2 per cent decrease over Q4 2014. This resulted in the production of:

o 1,447 tonnes of copper (15 per cent decrease over the previous quarter)

o 1,464 ounces of gold (31 per cent decrease over the previous quarter)

o 10,781 ounces of silver (35 per cent decrease over the previous quarter)

 

· Head grades of copper 2.79 per cent, gold 1.26 grammes per tonne and silver 9.12 grammes per tonne with recoveries to concentrate for copper 97.1 per cent, gold 69.2 per cent and silver 73.0 per cent. The key recovery indicators are mainly consistent while grades were within the communicated guidance ranges for fiscal 2015.

· Concentrate grade for copper 28.52 per cent, gold 8.98 grammes per tonne and silver 66.11 grammes per tonne for the quarter representing a 0.2 per cent increase and 4 per cent decrease in copper concentrate grade over Q4 2014 and Q1 2014 respectively. Gold and silver in concentrate both showed increases over Q1 2014 and decreases when compared to Q4 2014.

 

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development Company that in November 2012 brought its first mine into commercial production. The group has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

The Company's Vision is to be Atlantic Canada's leading mine operator and resource developer through growth and expansion of its existing assets; discovering new deposits; strategic partnerships; mergers and acquisitions. In addition to the Ming Mine, Rambler has strategic investments in the former producing Hammerdown gold mine, the Little Deer/ Whales Back copper mines and the advanced Valentine Lake Gold Project.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RMM.

 

 

For further information, please contact:

 

Norman Williams, CA

President and CEO

Rambler Metals & Mining Plc

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Corporate Secretary

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

Stewart Dickson / Jeremy Stephenson

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Tim Blythe/ Halimah Hussain

Blytheweigh

Tel No: +44 (0) 20 7138 3204

 

Website: www.ramblermines.com

 

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

Note 1: Results reported are accurate and reflective as of the date of release. The Company performs regular auditing and reconciliation reviews on its mining and milling processes as well as stockpile inventories, following which past results may be adjusted to reflect any changes.

 

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCZMMZMMNZGDZG
Date   Source Headline
25th Jan 20177:00 amRNSProduction Results and 2017 Guidance
19th Jan 20177:00 amRNSCompletion of DMS Trial Testing
19th Dec 20167:44 amRNSFinancial Results for Period Ending 31 Oct 2016
1st Dec 20163:18 pmRNSResult of AGM
1st Dec 20167:00 amRNSQ1/2017 Stub - Production Results
8th Nov 20169:07 amRNSHolding(s) in Company
7th Nov 20167:43 amRNSNotice of AGM
7th Nov 20167:00 amRNSReceives a Repayable Contribution From the ACOA
24th Oct 20167:00 amRNSFinal Results
17th Oct 20164:47 pmRNSHolding(s) in Company
21st Sep 20167:00 amRNSFiscal 2016 Q4 and Yearend Production Results
22nd Aug 20167:00 amRNSDirector/PDMR Shareholding
18th Aug 201611:17 amRNSNew Stock Option Plan
17th Aug 20167:00 amRNSHolding(s) in Company
27th Jul 20167:00 amRNSDirector/PDMR Shareholding - Correction
26th Jul 20166:28 pmRNSDirector/PDMR Shareholding
20th Jul 20167:00 amRNSChange of Accounting Reference Date
19th Jul 201612:57 pmRNSDirector/PDMR Shareholding
29th Jun 20167:00 amRNSUNAUDITED CONSOLIDATED FINANCIAL INFORMATION
10th Jun 20162:45 pmRNSNotification: Major Interest in Shares- Correction
9th Jun 201611:36 amRNSNotification of Major Interest in Shares
7th Jun 201611:15 amRNSNotification of Major Interests in Shares
3rd Jun 20165:36 pmRNSHoldings in Company
3rd Jun 20168:00 amRNSTransaction Close
27th May 20163:47 pmRNSResult of General Meeting
25th May 20167:00 amRNSThird Quarter FY2016 Production Results
20th May 20163:58 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
16th May 201612:00 pmRNSRambler and Maritime Engage WSP Canada
10th May 20167:00 amRNS13th Shipment of Copper Concentrate Completed
9th May 201612:00 pmRNSRambler & Maritime Sign Engineering Agreement
4th May 20167:00 amRNSMing Mine Project Receives Safety Award
21st Apr 20167:09 amRNSProposed Subscription by CEII Roma
30th Mar 20167:00 amRNSSecond Quarter Unaudited Financial Results
15th Mar 20161:00 pmRNSRambler Signs Non-Binding Letter of Intent
29th Feb 20167:00 amRNSSecond Quarter FY2016 Production Results
2nd Feb 201612:29 pmRNSIssuance of Share
2nd Feb 20167:00 amRNS12th Shipment of High Grade Copper Concentrate
13th Jan 20165:19 pmRNSAcquisition of Thundermin Resources Inc.
22nd Dec 20153:54 pmRNSThundermin Resources Shareholders Approve Merger
14th Dec 20157:00 amRNSFinancial Results For the Quarter Ended October 31
3rd Dec 20152:57 pmRNSResults of Annual General Meeting
2nd Dec 20157:00 amRNSFirst Quarter 2016 Production Results
30th Nov 20154:37 pmRNSNotification of Major Interest in Shares
12th Nov 20152:10 pmRNSRambler & Thundermin Sign Amalgamation Agreement
26th Oct 20157:00 amRNSFinancial Results for year ended July 31, 2015
9th Sep 20152:08 pmRNSFiling of Prefeasibility Technical Report on SEDAR
8th Sep 20157:00 amRNSFiscal 2015 Q4 and Yearend Production Results
3rd Sep 20157:00 amRNSRambler and Thundermin Enter Into a LOI
2nd Sep 20152:15 pmRNSPurchase Agreement with Off-take Partner
19th Aug 20157:00 amRNS11th Shipment of High Grade Copper Concentrate

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.