focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPhoenix Copper. Regulatory News (PXC)

Share Price Information for Phoenix Copper. (PXC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 19.25
Bid: 19.00
Ask: 19.50
Change: 0.00 (0.00%)
Spread: 0.50 (2.632%)
Open: 19.50
High: 19.75
Low: 18.50
Prev. Close: 19.25
PXC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Empire Mine Open Pit updated economic model

16 Feb 2021 07:00

RNS Number : 1807P
Phoenix Copper Limited
16 February 2021
 

Phoenix Copper Limited / Ticker: PXC / Sector: Mining 

16 February 2021

 

Phoenix Copper Limited

("Phoenix" or the "Company")

 

Empire Mine Open Pit updated economic model delivers $105* million pre-tax 7.5% NPV

 

Phoenix Copper Ltd (AIM: PXC, OTCQX: PXCLF), the AIM quoted North American focused base and precious metals emerging producer and exploration company, is pleased to announce that it has completed a new economic model for the Empire Mine open pit project in Idaho, USA to recover copper, zinc, gold and silver.

 

Highlights

- Copper led US mining operation with production targeted for 2022

- The updated Economic Model ("EM") for the Empire Mine open pit project indicates strong cashflow and rapid payback in less than two years

- 10-year Life of Mine ("LOM") processing a total of 14.3 million tonnes Measured & Indicated ("M&I") ore at a 0.5% copper cut-off grade

- Considerable opportunity to extend the LOM through exploration and development funded from project cashflows

- Two phased processing to recover copper, zinc, gold and silver

o Phase 1 heap leach project, a seven-year operation processing 2.1 million tonnes per year, producing copper and zinc from years one to seven of the LOM

o Phase 2 agitation leach project, a seven-year operation processing ore from Phase 1, producing gold and silver from years four to 10 of the LOM, using environmentally friendly ammonium thiosulphate ("ATS") processing reagent

- LOM revenue of $784 million, producing average annual production of 8,550 tonnes of copper, 1,970 tonnes of zinc, 17,235 ounces of gold and 680,050 ounces of silver

- Initial head grade of 0.70% copper

- Pre-production capital cost of $52.6 million

- LOM copper equivalent cash operating cost of $1.83 / lb

- LOM gold equivalent cash operating cost of $1,190 / oz

- LOM EBITDA of $310 million and post-tax cash flow of $155 million

- 7.5% base case NPV of $105 million pre-tax (57% IRR) and $88 million post-tax (47% IRR)

- 7.5% NPV of $157 million pre-tax (77% IRR) and $140 million post-tax (68% IRR) with 10% increase in metal prices

- Encouraging project economics to support debt finance to minimise dilution

- Ongoing optimisation of the project to improve the economics and extend the mine life

 

* Assumes metal prices of $3.60/lb copper, $1.20/lb zinc, $1,825/oz gold and $27/oz silver.

 

Ryan McDermott, Chief Executive Officer, commented: "The updated EM shows an impressive "starter" operation that delivers revenue of $784 million with a pre-tax 7.5% NPV of $105 million and an IRR of 57%. This significant increase in the NPV from the previous EM (August 2019) is a product of increased M&I resources, a higher head grade for copper, the use of ATS to recover gold and silver, and an increase in ore processing capacity from 1.6 to 2.1 million tonnes per year. The NPV is also well in excess of pre-production capital costs.

"In conjunction with Hard Rock Consulting LLC ("HRC") of Lakewood, Colorado, the Phoenix team has developed this model using the drilling, metallurgical, and engineering data completed since the last reported EM. The work that has been completed since that time has resulted in a base case model with a 10-year operating life that produces the full suite of Empire metals; copper, zinc, gold, and silver.

"The addition of gold and silver production from the Empire open pit, made possible by last year's drilling and metallurgical test work, has contributed significantly to our project's positive economics. The new model uses a 0.5% copper cut-off grade and assumes mining and processing of 14.3 million tonnes of M&I ore in two phases, leading off with copper and zinc production in the first three years of operations, and adding gold and silver production from the fourth year of operations.

"This two phase plan allows for the initial production of copper and zinc by heap leaching over a seven year open pit mine life, followed by the rehandling of the heaps into a gold and silver recovery circuit beginning in Year 4 and continuing through to year 10. For the purposes of this EM, open-pit operations currently end in Year 7, although we are confident that we will extend this mine life. The initial capital requirement for this two-phase approach is estimated at $52 million, and the model indicates that, at current metal prices, the mine can pay back this initial capex in less than two years.  

"This new Empire EM is timely, coinciding with elevated copper and silver markets, a stable zinc market, and a respectable gold price. The new administration in Washington D.C. is actively encouraging the clean energy revolution which would include the development of metals essential for electrification projects. Our Empire copper resources fit neatly into that category, as will our use of environmentally friendly ATS for the processing of our precious metals. I expect to see these positive trends continue as we move further away from the uncertainties of 2020.

"We continue to be focused on optimising and refining the project in order to submit our Plan of Operations for Phase 1 of the project in order to commence the final stages of the production permitting process, with production still targeted for 2022. Metallurgical test work and mine optimisation and engineering is ongoing, with a view to improving the project economics and extending the mine life. This will be achieved by processing additional existing M&I resources, and by adding Inferred resources to the production schedule once they have been upgraded to M&I.

"We are also looking forward to a rewarding exploration season, particularly at our recently discovered Red Star high grade silver-lead zone at Empire, and the Navarre Creek gold property. The planning and scheduling of geophysical surveys and drill targeting at both these properties is underway, and we hope to be drilling on both properties this summer. This is an exciting time for our Company and I look forward to providing shareholders with further updates as they become available."

 

 

Empire Mine Economic Model Summary - Base Case

 

 

 

 

 

HEAP LEACH

ATS

 

 

 

SX -EW

AGITATION LEACH

 

 

 

Cu/Zn OPERATION

Au/Ag OPERATION

 

 

 

YEARS 1 TO 7

YEARS 4 TO 10

PRODUCTION

 

 

 

 

Total ore (at a 0.5% copper cut-off)

tonnes

14,317,207

14,317,207

 

Total tonnes ore & waste

tonnes

55,018,098

 

 

Contained copper

tonnes

76,556

 

 

Contained zinc

tonnes

26,782

 

 

Contained gold

ounces

 

141,205

 

Contained silver

ounces

 

6,005,694

 

Copper recovery

%

76

 

 

Zinc recovery

%

50

 

 

Gold recovery

%

 

83

 

Silver recovery

%

 

77

 

Scheduled Ore Production

per day

5,625

5,625

 

Scheduled Ore Production

per year

2,100,000

2,100,000

 

Mine life

years

6.8

6.8

 

Copper recovered (LOM)

tonnes

58,183

 

 

Zinc recovered (LOM)

tonnes

13,391

 

 

Copper equivalent recovered (LOM)

tonnes

62,647

 

 

Average annual copper equivalent production years 1 to 7

tonnes

9,213

 

 

Saleable gold recovered (LOM)

ounces

 

117,200

 

Saleable silver recovered (LOM)

ounces

 

4,624,384

 

Gold equivalent recovered (LOM)

ounces

 

185,616

 

Average annual gold equivalent production years 4 to 10

ounces

 

27,296

REVENUE (LIFE OF MINE)

 

 

 

 

Copper price

$/pound

3.60

 

 

Copper revenue

$

461,776,280

 

 

Zinc price

$/pound

1.20

 

 

Zinc revenue

$

35,426,448

 

 

Net Cu/Zn revenue after royalties, freight, insurance & TC

$

467,212,591

 

 

Gold price

$/oz

 

1,825

 

Gold revenue

$

 

213,889,626

 

Silver price

$/oz

 

27.00

 

Silver revenue

$

 

124,858,374

 

Net Au/Ag revenue after royalties, freight, insurance & TC

$

 

316,405,194

OPERATING COSTS (LIFE OF MINE)

 

 

 

 

Mining

$

102,575,000

10,725,000

 

Processing

$

128,533,000

203,339,060

 

G&A and property tax

$

21,690,000

6,809,524

 

Total operating costs

$

252,798,000

220,873,584

 

Cash operating cost

$/tonne ore

17.66

 

 

Cash operating cost

$/lb copper equ

1.83

 

 

Cash operating cost

$/tonne ore

 

15.45

 

Cash operating cost

$/oz gold equ

 

1,190

EBITDA (LIFE OF MINE)

$

214,414,591

95,531,610

CAPITAL COSTS

 

 

 

 

 

Pre-production capital costs

$

52,673,000

36,837,000

 

Sustaining capital

$

24,175,000

7,000,000

 

Equipment finance costs

$

10,635,000

 

PRE-TAX CASH FLOW (LIFE OF MINE)

 

$

126,931,591

51,694,610

 

Federal & State tax

$

17,069,000

7,605,028

POST-TAX CASH FLOW (LIFE OF MINE)

 

$

109,862,591

44,089,582

 

Ave annual Cu/Zn post-tax cash flow in years 1 to 7

$

16,156,263

 

 

Ave annual Au/Ag post-tax cash flow in years 4 to 10

$

 

6,483,762

 

LOM NPV

Pre Tax

Post Tax

5.0%

124,951,217

105,707,169

7.5%

105,171,561

87,995,963

10.0%

88,211,433

73,394,787

 

 

 

 

 

Metal Price

LOM NPV (7.5%)

 IRR %

Sensitivity

Pre Tax

Post Tax

Pre Tax

Post Tax

+10%

157,429,610

139,842,247

77

68

0

105,171,561

87,995,963

57

47

-10%

52,913,511

36,382,354

34

25

 

 

Background on the Empire Mine Open Pit Project

 

This updated EM has been prepared in conjunction with HRC, has been derived following the publication in October 2020 (reported on 9 December 2020) of an updated NI 43-101 compliant resource, which incorporated the 32 hole, 1,700-metre Empire 2020 reverse-circulation and core drilling programme results. The new economic model uses current market data and will form the basis of the operating plan for permitting purposes, and future feasibility studies.

 

Further mine planning and optimisation has resulted in an economic model utilising two separate processing circuits, with approximately 14.3 million tonnes of ore production, at 2.1 million tonnes per annum at a 0.5% copper cut-off grade, over the initial seven years. The ore will be processed sequentially, first for copper-zinc utilising standard heap leach SX/EW, followed by gold-silver recovery in an ATS circuit. In Year 4 of operations, the ore previously leached for copper-zinc will be moved from the Phase 1 leach pad and introduced to the gold-silver circuit. The heaps will be staged such that copper-zinc leaching can continue with ore stacked to the pad in Years 4 through 7, and then moved to the precious metals circuit after the copper-zinc recovery reaches its optimal level. Open-pit operations currently end in Year 7 with residual copper-zinc leaching continuing through maximum recovery, and the gold-silver circuit operating through to Year 10.

 

The Company has used the pit production schedule prepared by HRC, and production, capital and operating cost estimates prepared by Phoenix staff in conjunction with HRC.

 

The model is summarised above and can also be found on the Company's website at www.phoenixcopperlimited.com

 

 

Qualified Person

 

The information in this announcement has been reviewed by Roger Turner A.C.S.M., M.Sc., M.I.M.M.M., C.Eng., Chief Technical Officer and Director of the Company. Mr Turner is a graduate mining engineer from the Camborne School of Mines with an MSc in Economic Geology from Leicester University with more than 40 years' experience in mine development, construction and operation and is a qualified person under the AIM Rules. Mr Turner consents to the inclusion of the information in the form and context in which they appear.

 

Environmental, Social, and Corporate Governance

Phoenix is committed to meeting and exceeding the environmental standards required by law as a core value of the Company. The baseline environmental data collected to date will be used for furthering the permitting process, but as importantly, will be used as the building blocks for the Company's future Environmental, Social, and Corporate Governance ("ESG") platform.

 Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

Contacts

For further information please visit www.phoenixcopperlimited.com or contact:

Phoenix Copper Limited

Ryan McDermott

Dennis Thomas

Richard Wilkins

Tel: +1 208 954 7039

Tel: +44 7827 290 849

Tel: +44 7590 216 657 

SP Angel (Nominated Adviser)

David Hignell / Caroline Rowe

Tel: +44 20 3470 0470

Brandon Hill Capital (Joint Broker)

Jonathan Evans / Oliver Stansfield

 

Tel: +44 20 3463 5000

WH Ireland (Joint Broker)

Harry Ansell / Adam Pollock / Katy Mitchell

Tel: +44 207 2201666

EAS Advisors (US Corporate Adviser)

Matt Bonner / Rogier de la Rambelje

Tel: +1 (646) 495-2225

Blytheweigh(Financial PR)

Tim Blythe / Megan Ray

Tel: +44 20 7138 3204

 

 

Notes

 

Phoenix Copper Limited is a North American focused, base and precious metal emerging producer and exploration company, which has carried out a drilling programme and generated a copper, gold, silver and zinc resource on which it is carrying out a feasibility study to bring the historically producing Empire Mine in Idaho, USA, back into production. It is also evaluating the silver and gold resources around three other past producing mines within the 23 kmEmpire claims block as well as cobalt in two claims blocks north of Empire in Idaho.

Phoenix's primary operations are focused near Mackay, Idaho in the Alder Creek mining district. This district includes the historical Empire, Horseshoe, White Knob and Blue Bird Mines, past producers of copper, gold, silver, zinc, lead and tungsten from underground mines in the first half of the twentieth century. Additionally, the district includes Navarre Creek a Carlin-trend gold discovery which hosts a 6.1 km gold strike length within a 9.8 km² area.

Phoenix acquired an 80% interest in the historical Empire Mine property in 2017 and, based on a total of 320 drill holes, an oxide resource was completed in late 2017. A NI 43-101 compliant PEA (preliminary economic assessment) for an open pit heap leach solvent extraction and electrowinning ("SX-EW") mine was completed in April 2018. In 2018 a further 8,600 metres in 93 holes was completed to upgrade the oxide resources, provide samples for ongoing metallurgical test work, geotechnical and hydrological studies and condemnation drilling for the heap leach pad site, waste dump and plant site. An updated NI 43-101 compliant resource was completed in early May 2020 and October 2020 for all metals. Present contained metal in all NI 43-101 compliant categories of resources, measured, indicated and inferred, stand at 355,523 ounces of gold, 129,641 tonnes of copper, 10,133,772 ounces of silver and 58,440 tonnes of zinc. Following the latest NI 43-101 compliant resource, Phoenix updated its economic model in February 2021 to include the processing of all contained metals through a two phased approach.

Since acquiring the Empire project, Phoenix has increased the claim area from 818 acres to 5,717 acres, mainly to the northwest and west, and in so doing has increased the potential for additional oxide and sulphide copper resources, as well as the potential for stand-alone gold and silver resources, along a strike length of approximately 5.4 km towards the other brownfield mines of the Horseshoe, White Knob and Blue Bird Mines now within the property boundary. In particular, a new discovery at Red Star, 330 metres north west of the Empire Mine proposed open pit, has revealed sulphide ore and from three shallow exploration drill holes a NI 43-101 compliant maiden resource of 1.6 million silver equivalent ounces was reported.

At Empire, it is estimated that less than 1% of the potential ore system has been explored to date and, accordingly, there is significant opportunity to increase the resource through phased exploration.

More details on the Company, its assets and its objectives can be found on PXC's website at www.phoenixcopperlimited.com.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUVRARAUUUAUR
Date   Source Headline
15th May 20244:51 pmRNSFinal results for the year ended 31 December 2023
15th May 20244:34 pmRNSConditional Subscription for $80m of Copper Bonds
7th May 20247:00 amRNSEmpire Open-Pit Mine Mineral Reserve Statement
8th Apr 202412:25 pmRNSBlock Listing Six Monthly Return
27th Mar 20247:00 amRNSExtension of Warrants
19th Mar 20247:00 amRNSPurchase of Empire Processing Equipment Finalised
4th Mar 20247:00 amRNSRefinancing of Short-Term Loan Facility
19th Feb 20247:00 amRNSUpdate: Purchase of Equipment and Debt Refinancing
31st Jan 20246:15 pmRNSResult of Retail Offer and Additional Subscription
26th Jan 202412:10 pmRNSResult of Placing and Subscription
26th Jan 20249:25 amRNSClose of Accelerated Bookbuild
26th Jan 20247:01 amRNSRetail Offer
26th Jan 20247:00 amRNSProposed Placing, Subscription and Retail Offer
18th Jan 20247:00 amRNSOperational Update
5th Jan 20247:00 amRNSCorporate copper bonds and loan facility update
11th Dec 20237:00 amRNSExtension of Loan Facility
20th Nov 20237:00 amRNSExtension of Loan Facility
24th Oct 20237:00 amRNSUpdate for Navarre Creek Exploratory Drilling
10th Oct 20235:02 pmRNSBlock Listing Six Monthly Return
28th Sep 20237:00 amRNSInterim Results
4th Sep 20237:00 amRNSResults of Metallurgical Testing at Empire Mine
17th Jul 20237:00 amRNSCommencement of Navarre Creek Drilling Programme
23rd Jun 20237:00 amRNSExtension of Loan Facility
8th Jun 202312:33 pmRNSResult of Annual General Meeting
6th Jun 20237:00 amRNSPreliminary Results of Metallurgical Testing
25th May 20237:00 amRNSFinal results for the year ended 31 December 2022
12th Apr 20237:00 amRNSExploration Drilling Results at the Empire Mine
6th Apr 20237:00 amRNSBlock Listing Six Monthly Return
29th Mar 20239:05 amRNSSecond Price Monitoring Extn
29th Mar 20239:00 amRNSPrice Monitoring Extension
24th Mar 20239:05 amRNSSecond Price Monitoring Extn
24th Mar 20239:00 amRNSPrice Monitoring Extension
24th Mar 20237:00 amRNSCorporate Update
16th Mar 20237:00 amRNSFurther Results of Metallurgical Core Drilling
12th Jan 20237:00 amRNSFurther Results of Metallurgical Core Drilling
5th Jan 20237:00 amRNSPhoenix Subsidiary Welcomes New General Manager
4th Jan 20237:00 amRNSAdditional Results of Metallurgical Core Drilling
9th Dec 202211:00 amRNSPrice Monitoring Extension
10th Nov 20227:00 amRNSInitial Results of Metallurgical Core Drilling
6th Oct 20227:00 amRNSBlock Listing Six Monthly Return
29th Sep 202211:05 amRNSSecond Price Monitoring Extn
29th Sep 202211:00 amRNSPrice Monitoring Extension
29th Sep 20227:00 amRNSInterim Results
23rd Sep 20229:06 amRNSSecond Price Monitoring Extn
23rd Sep 20229:00 amRNSPrice Monitoring Extension
20th Sep 20221:47 pmRNSTR-1: Notification of major holdings
15th Sep 20222:05 pmRNSSecond Price Monitoring Extn
15th Sep 20222:00 pmRNSPrice Monitoring Extension
13th Sep 20222:05 pmRNSSecond Price Monitoring Extn
13th Sep 20222:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.