The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPTR.L Regulatory News (PTR)

  • There is currently no data for PTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on 2018 Work Programme

22 Mar 2018 07:00

RNS Number : 5232I
Petroneft Resources PLC
22 March 2018
 

PetroNeft Resources plc

22 March 2018

PetroNeft Resources plc ('PetroNeft' or 'the Company')

 

Update on 2018 Work Programme

 

PetroNeft (AIM: PTR) an oil and gas exploration and production company operating in the Tomsk Oblast, Russian Federation, and 50% owner and operator of Licences 61 and 67 is pleased to announce the details of its 2018 work program.

 

Highlights

 

· Drilling of the Cheremshanskoye No. 4 (C-4) Appraisal Well in Licence 67.

· Continued testing at Sibkrayevskoye in Licence 61.

· Studies for West Lineynoye L-8 Lobe Development in Licence 61.

 

Licence 67

A delineation well will be drilled at the Cheremshanskoye oil field in Licence 67. The C-4 well is designed to further delineate and de-risk the Cheremshanskoye field in advance of field development. Three prior wells have been drilled on the field, most recently in 2011 by PetroNeft and oil has been identified and tested in 4 different intervals in the field: the Lower Jurassic J-14 and J-13 intervals and the Upper Jurassic J1-1 and J1-3 intervals. These initial wells were drilled without the benefit of modern 3D seismic data which was acquired in 2014. The C-4 well is designed to test a large portion of the field which is structurally higher than the previous wells based on this recently acquired 3D seismic data.

 

The primary reservoir target is the J1-3 interval which is approximately 10 m in thickness throughout the region and is the primary reservoir at the adjacent producing Lomovoye field operated by TomskNeft. The J1-3 interval tested 240 bopd of light oil (40°API) on natural flow in the adjacent Lomovoye No. 208 well.

 

The secondary reservoir target is the J14 interval which had a natural flow of 33 bopd of light oil (49°API) from 6.5 m of net pay in the 2011 Cheremshanskoye No. 3 well. The current Russian State (GKZ) registered reserves for this interval are about 16 million bbls gross recoverable C1+C2 reserves.

 

Tomsk Geophysical Company estimates the Russian C3 gross reserves for all 4 intervals at about 75 million bbls recoverable for the field, based on the 3D seismic and log evaluation of the existing wells.

 

Based on the results of a competitive tender the drilling contract was awarded to SSK Drilling, a large drilling contractor with operations throughout Russia. The drilling rig and necessary supplies will be mobilised to the location this winter while winter roads are in place and the well will be drilled this summer. The well is being drilled under the joint venture agreement with our partner for Licence 67, Arawak Energy on a 50:50 basis. PetroNeft's proportion of the well costs will be funded from existing resources.

 

Licence 61

We will continue to test the S-373 and S-375s wells for the remainder of the 2018 winter season. This data will then be used to plan for future development at Sibkrayevskoye which requires a 26 km pipeline back to the Lineynoye Central Processing Unit.

 

We are also re-evaluating the development of the West Lineynoye L-8 Lobe. This is based on the good results from the 2 horizontal wells at South Arbuzovskoye in 2016 where we have similar thin pays with good reservoir properties in the continuous J1-1 interval. We also have existing infrastructure which ties the L-8 Lobe to the Central Processing Unit at Lineynoye. This development would monetize about 10 million bbls of 2P reserves.

 

Dennis Francis, Chief Executive Officer of PetroNeft Resources plc, commented:

"We look forward to drilling the C-4 well which we feel has great potential as it will test multiple targets up-dip from nearby wells that have already tested oil in the same intervals. This is the first well to be drilled by the Company based on the modern 3D seismic data acquired in 2014."

 

 

For further information, contact:

Dennis Francis, CEO, PetroNeft Resources plc

+1 713 988 2500

Paul Dowling, CFO, PetroNeft Resources plc

+353 1 647 0280

John Frain/Brian Garrahy, Davy (NOMAD and Joint Broker)

+353 1 679 6363

Henry Fitzgerald-O'Connor, Canaccord Genuity Limited (Joint Broker)

+44 207 523 8000

Joe Heron / Douglas Keatinge, Murray Consultants

+353 1 498 0300

 

The information contained in this announcement has been reviewed and verified by Mr. Dennis Francis, Director and Chief Executive Officer of PetroNeft, for the purposes of the Guidance Note for Mining and Oil & Gas Companies issued by the London Stock Exchange in June 2009. Mr. Francis holds a B.S. Degree in Geophysical Engineering and a M.S. Degree in Geology from the Colorado School of Mines. He has also graduated from the Harvard University Program for Management Development. He is a member of the American Association of Petroleum Geologists and the Society of Exploration Geophysicists. He has over 40 years' experience in oil and gas exploration and development.

End

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUGWWUPRGRG
Date   Source Headline
1st Feb 20107:00 amRNSLedovy Licence Update
27th Jan 20107:00 amRNSOperational Update
13th Jan 201011:51 amRNSHolding(s) in Company
7th Jan 201012:02 pmRNSHolding(s) in Company
5th Jan 201010:45 amRNSHolding(s) in Company
18th Dec 20097:00 amRNSNew Licence Acquisition
15th Dec 200912:29 pmRNSChange of Registered Office
15th Dec 20097:00 amRNSIEX Notice
11th Dec 200912:25 pmRNSIssue of Equity
9th Dec 20092:47 pmRNSIssue of options
9th Dec 20097:00 amRNSOperational update
18th Nov 20099:18 amRNSHolding(s) in Company
13th Nov 20093:54 pmRNSHolding(s) in Company
10th Nov 20092:51 pmRNSHolding(s) in Company
6th Nov 20099:33 amRNSHolding(s) in Company
23rd Oct 20093:37 pmRNSHolding(s) in Company
23rd Oct 20093:32 pmRNSHolding(s) in Company
20th Oct 200910:55 amRNSHolding(s) in Company
20th Oct 20099:30 amRNSHolding(s) in Company
20th Oct 20099:26 amRNSHolding(s) in Company
19th Oct 20093:03 pmRNSHolding(s) in Company
16th Oct 20097:00 amRNSIEX Notice
15th Oct 200911:51 amRNSResult of EGM
15th Oct 20097:00 amRNSOperational Update
30th Sep 20097:00 amRNSInterim Results
21st Sep 20097:00 amRNSUS$27.5 million Placing
14th Sep 20093:33 pmRNSResult of AGM
27th Aug 20097:16 amRNSOperations Update
26th Jun 200911:52 amRNSDocument Availability
4th Jun 20097:00 amRNSFinal Results
3rd Jun 200911:07 amRNSHolding(s) in Company
11th May 20097:00 amRNSAppointment of Joint Broker
27th Apr 20097:58 amRNSTransfer of Directors Shares
1st Apr 20097:00 amRNSDirectorate Change
24th Feb 20097:00 amRNSReserve Update
13th Feb 20099:17 amRNSDirector Share Dealing
10th Feb 20097:00 amRNSProduction Update
12th Jan 20097:00 amRNSReserves Update
4th Nov 20087:00 amRNSSuccessful well test
22nd Oct 20087:00 amRNSOperations Update
30th Sep 20087:00 amRNSInterim Results
16th Sep 20087:00 amRNSOperational Update
18th Aug 200810:44 amRNSHolding in Company
15th Aug 20087:00 amRNSIEX Notice
14th Aug 20083:08 pmRNSResult of AGM and EGM
14th Aug 20087:00 amRNSAMI Agreement
29th Jul 20087:00 amRNSPipe Procurement Contract
23rd Jul 20087:00 amRNSNotice of AGM and EGM
21st Jul 20087:49 amRNSDirector/PDMR Shareholding
18th Jul 20087:00 amRNS$17.3 million Placing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.