Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPTR.L Regulatory News (PTR)

  • There is currently no data for PTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on 2018 Work Programme

22 Mar 2018 07:00

RNS Number : 5232I
Petroneft Resources PLC
22 March 2018
 

PetroNeft Resources plc

22 March 2018

PetroNeft Resources plc ('PetroNeft' or 'the Company')

 

Update on 2018 Work Programme

 

PetroNeft (AIM: PTR) an oil and gas exploration and production company operating in the Tomsk Oblast, Russian Federation, and 50% owner and operator of Licences 61 and 67 is pleased to announce the details of its 2018 work program.

 

Highlights

 

· Drilling of the Cheremshanskoye No. 4 (C-4) Appraisal Well in Licence 67.

· Continued testing at Sibkrayevskoye in Licence 61.

· Studies for West Lineynoye L-8 Lobe Development in Licence 61.

 

Licence 67

A delineation well will be drilled at the Cheremshanskoye oil field in Licence 67. The C-4 well is designed to further delineate and de-risk the Cheremshanskoye field in advance of field development. Three prior wells have been drilled on the field, most recently in 2011 by PetroNeft and oil has been identified and tested in 4 different intervals in the field: the Lower Jurassic J-14 and J-13 intervals and the Upper Jurassic J1-1 and J1-3 intervals. These initial wells were drilled without the benefit of modern 3D seismic data which was acquired in 2014. The C-4 well is designed to test a large portion of the field which is structurally higher than the previous wells based on this recently acquired 3D seismic data.

 

The primary reservoir target is the J1-3 interval which is approximately 10 m in thickness throughout the region and is the primary reservoir at the adjacent producing Lomovoye field operated by TomskNeft. The J1-3 interval tested 240 bopd of light oil (40°API) on natural flow in the adjacent Lomovoye No. 208 well.

 

The secondary reservoir target is the J14 interval which had a natural flow of 33 bopd of light oil (49°API) from 6.5 m of net pay in the 2011 Cheremshanskoye No. 3 well. The current Russian State (GKZ) registered reserves for this interval are about 16 million bbls gross recoverable C1+C2 reserves.

 

Tomsk Geophysical Company estimates the Russian C3 gross reserves for all 4 intervals at about 75 million bbls recoverable for the field, based on the 3D seismic and log evaluation of the existing wells.

 

Based on the results of a competitive tender the drilling contract was awarded to SSK Drilling, a large drilling contractor with operations throughout Russia. The drilling rig and necessary supplies will be mobilised to the location this winter while winter roads are in place and the well will be drilled this summer. The well is being drilled under the joint venture agreement with our partner for Licence 67, Arawak Energy on a 50:50 basis. PetroNeft's proportion of the well costs will be funded from existing resources.

 

Licence 61

We will continue to test the S-373 and S-375s wells for the remainder of the 2018 winter season. This data will then be used to plan for future development at Sibkrayevskoye which requires a 26 km pipeline back to the Lineynoye Central Processing Unit.

 

We are also re-evaluating the development of the West Lineynoye L-8 Lobe. This is based on the good results from the 2 horizontal wells at South Arbuzovskoye in 2016 where we have similar thin pays with good reservoir properties in the continuous J1-1 interval. We also have existing infrastructure which ties the L-8 Lobe to the Central Processing Unit at Lineynoye. This development would monetize about 10 million bbls of 2P reserves.

 

Dennis Francis, Chief Executive Officer of PetroNeft Resources plc, commented:

"We look forward to drilling the C-4 well which we feel has great potential as it will test multiple targets up-dip from nearby wells that have already tested oil in the same intervals. This is the first well to be drilled by the Company based on the modern 3D seismic data acquired in 2014."

 

 

For further information, contact:

Dennis Francis, CEO, PetroNeft Resources plc

+1 713 988 2500

Paul Dowling, CFO, PetroNeft Resources plc

+353 1 647 0280

John Frain/Brian Garrahy, Davy (NOMAD and Joint Broker)

+353 1 679 6363

Henry Fitzgerald-O'Connor, Canaccord Genuity Limited (Joint Broker)

+44 207 523 8000

Joe Heron / Douglas Keatinge, Murray Consultants

+353 1 498 0300

 

The information contained in this announcement has been reviewed and verified by Mr. Dennis Francis, Director and Chief Executive Officer of PetroNeft, for the purposes of the Guidance Note for Mining and Oil & Gas Companies issued by the London Stock Exchange in June 2009. Mr. Francis holds a B.S. Degree in Geophysical Engineering and a M.S. Degree in Geology from the Colorado School of Mines. He has also graduated from the Harvard University Program for Management Development. He is a member of the American Association of Petroleum Geologists and the Society of Exploration Geophysicists. He has over 40 years' experience in oil and gas exploration and development.

End

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUGWWUPRGRG
Date   Source Headline
21st Jul 20155:51 pmRNSHolding(s) in Company
30th Jun 20153:30 pmRNSAnnual Report & Annual General Meeting
30th Jun 201512:17 pmRNSHolding(s) in Company
23rd Jun 20157:00 amRNS2014 Final Results
22nd May 20157:00 amRNSOperations Update
20th Mar 20157:00 amRNSOperations Update
5th Mar 201511:55 amRNSHolding(s) in Company
4th Mar 20154:40 pmRNSSecond Price Monitoring Extn
4th Mar 20154:35 pmRNSPrice Monitoring Extension
27th Feb 20155:20 pmRNSHolding(s) in Company
3rd Feb 20157:00 amRNSOperations Update
18th Dec 20147:00 amRNSOperations Update
14th Oct 20147:00 amRNSTungolskoye No. 5 update
26th Sep 20147:00 amRNSHalf Yearly Report
8th Sep 20144:47 pmRNSHolding(s) in Company
29th Aug 20145:06 pmRNSAnnual General Meeting
19th Aug 20147:00 amRNSDrilling Operations Re-commencing
22nd Jul 20145:06 pmRNSHolding(s) in Company
4th Jul 20147:00 amRNSCompletion of Farmout
30th Jun 20144:45 pmRNSAnnual Report & Notice of AGM
30th Jun 20143:45 pmRNSFarmout Update
27th Jun 20148:35 amRNSFinal Results
28th May 201411:25 amRNSHolding(s) in Company
9th May 20143:54 pmRNSShareholder Meetings Update
24th Apr 201410:30 amRNSDocument Availability
17th Apr 20144:40 pmRNSSecond Price Monitoring Extn
17th Apr 20144:35 pmRNSPrice Monitoring Extension
17th Apr 20144:05 pmRNSLicence 61 Farmout Agreement
15th Apr 20147:00 amRNSFarmout Update
4th Apr 20143:16 pmRNSHolding(s) in Company
20th Mar 20147:00 amRNSEnterprise Securities Market Notice
18th Mar 20147:00 amRNSEGM Proposal
17th Mar 20147:00 amRNSFunding & Operations Update
23rd Jan 201412:01 pmRNSHolding(s) in Company
17th Jan 20146:24 pmRNSHolding(s) in Company
16th Jan 20147:00 amRNSOperations Update
5th Dec 20139:24 amRNSHolding(s) in Company
5th Dec 20139:22 amRNSHolding(s) in Company
3rd Dec 20137:00 amRNSOperations Update
28th Nov 201311:05 amRNSHolding(s) in Company
5th Nov 201312:16 pmRNSHolding(s) in Company
4th Oct 20134:13 pmRNSHolding(s) in Company
30th Sep 20137:00 amRNSHalf Yearly Report
20th Sep 20132:59 pmRNSHolding(s) in Company
11th Sep 20133:28 pmRNSResult of AGM
11th Sep 20137:00 amRNSOperations Update
28th Jun 20137:00 amRNSFinal Results
21st Mar 20137:00 amRNSOperations Update
18th Feb 201310:35 amRNSHolding(s) in Company
13th Feb 20132:28 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.