Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPTR.L Regulatory News (PTR)

  • There is currently no data for PTR

Drilling Update

8 Nov 2018 07:00

RNS Number : 7035G
Petroneft Resources PLC
08 November 2018
 

PetroNeft Resources plc

8 November 2018

 

PetroNeft Resources plc ('PetroNeft' or 'the Company')

 

Drilling Update - Results of C-4 Well Upgraded

 

PetroNeft (AIM: PTR) an oil and gas exploration and production company operating in the Tomsk Oblast, Russian Federation, and 50% owner and operator of Licences 61 and 67 is pleased to announce that cased-hole testing of the J1-1 and J1-3 intervals of the Cheremshanskoye No.4 (C-4) well in Licence 67 has confirmed the excellent results from the open-hole testing reported on 28 August.

 

Highlights

· Excellent results of open-hole testing confirmed and upgraded by extensive cased-hole test of the J1-1 and J1-3 intervals. The well productivity from the cased-hole test indicates that the combined intervals should achieve in excess of 450 bopd when produced on an electric submersible pump.

· The C-4 well proves up the northern half of the Cheremshanskoye field with oil tested from two horizons.

· The well is the first one drilled with the help of 3D seismic data acquired by PetroNeft in 2014 and is approximately 5km from two previous oil wells which were drilled along the southern boundary of the field (C-1 & C-3 wells).

· Result has the potential to increase gross reserves by 40 mmbbls (20 mmbbls net to PetroNeft)

 

Licence 67

The C-4 well is located on the northern half of the Cheremshanskoye field in Licence 67. The aim of the well was to prove up the northern extent of the field based on the 3D seismic data. The well was being drilled under the joint venture agreement with our partner for Licence 67, Arawak Energy on a 50:50 basis. The well spudded on 2 August and results of the open-hole testing were reported on 28 September. An extensive cased-hole testing programme has since been conducted for the J1-1 and J1-3 intervals.

Cased-hole test no. 1 of the J1-3 interval was conducted on the perforated interval from 2,644 - 2,655 m MD. The interval was step tested on different choke sizes and pressure regimes. The final natural oil flow rate on a 3 mm choke was 11.1 m3/day (70 bopd). The productivity index is calculated at 0.22 m3/day/atm which translates to about 277 bopd at 200 atm drawdown (typical drawdown expected for an electrical submersible pump).

We then isolated the J1-3 interval from the J1-1 interval and conducted cased-hole test no. 2. The J1-1 interval was perforated from 2,631 to 2,634 m MD. The interval was step tested at different choke sizes and pressure regimes. The final test on a 5 mm choke had a natural oil flow rate of 17.4 m3/day (109 bopd). The productivity index is calculated at 0.15 m3/day/atm which translates to about 189 bopd at 200 atm drawdown.

Assuming the well is completed with just an electrical submersible pump we would expect the combined flow rate of the two intervals to be in excess of 450 bopd. This compares to the combined open-hole prorated test result of 399 bfpd.

The two cased-hole tests combined with the log and core data in the Upper Jurassic are very encouraging. There are currently no reserves booked for the Upper Jurassic at Cheremshanskoye and is the Company estimate that there could be about 40 million bbls of proven and probable reserves in the Upper Jurassic at Cheremshanskoye based on these results (20 mmbbls net to PetroNeft).

The Company is in the process of getting the reserves approved by the State Reserve Committee (GKZ) and reviewing the options for producing the C-4 well on long term test production this winter when the oil can be trucked on winter roads.

Dennis Francis, Chief Executive Officer of PetroNeft Resources plc, commented:

"We are very pleased to report that extensive cased-hole testing of the C-4 well has confirmed and upgraded the encouraging initial short-term open-hole test results. The test data confirms Cheremshanskoye as a significant oil discovery within Licence 67 with good reservoir properties and excellent flow rates.

As outlined in the H1-2018 results, in order to enhance shareholder value the Company has engaged financial advisers in Russia to test the market and gauge appetite for a potential sale of Licence 61. While we are only in the early stages of this process for L-61, we have seen a high level of interest from a range of well-financed industry players.

Given the good result of the C-4 well, we would now expect a similar high level of interest in Licence 67. The good result of the C-4 well clearly expands the Company's options for returning value to shareholders."

 

For further information, contact:

Dennis Francis, CEO, PetroNeft Resources plc

+1 713 988 2500

Paul Dowling, CFO, PetroNeft Resources plc

+353 1 647 0280

John Frain/Brian Garrahy, Davy (NOMAD and Joint Broker)

+353 1 679 6363

Henry Fitzgerald-O'Connor, Canaccord Genuity Limited (Joint Broker)

+44 207 523 8000

Joe Heron / Douglas Keatinge, Murray Consultants

+353 1 498 0300

 

 

 

The information contained in this announcement has been reviewed and verified by Mr. Dennis Francis, Director and Chief Executive Officer of PetroNeft, for the purposes of the Guidance Note for Mining and Oil & Gas Companies issued by the London Stock Exchange in June 2009. Mr. Francis holds a B.S. Degree in Geophysical Engineering and a M.S. Degree in Geology from the Colorado School of Mines. He has also graduated from the Harvard University Program for Management Development. He is a member of the American Association of Petroleum Geologists and the Society of Exploration Geophysicists. He has over 40 years' experience in oil and gas exploration and development.

 

Glossary

API

The American Petroleum Institute gravity, or API gravity, is a measure of how heavy or light a petroleum liquid is compared to water: if its API gravity is greater than 10°, it is lighter and floats on water; if less than 10°, it is heavier and sinks.

bbls

Barrels

Bfpd

Barrels of fluid per day

bopd

Barrels of oil per day

m

metres

MD

Measured depth from the rig floor

mmbbls

Million barrels

Net oil pay

A reservoir or portion of a reservoir that contains producible hydrocarbons.

Spud

To commence drilling a well

 

 

End

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLFDLLBVFFFFBZ
Date   Source Headline
21st Jul 20155:51 pmRNSHolding(s) in Company
30th Jun 20153:30 pmRNSAnnual Report & Annual General Meeting
30th Jun 201512:17 pmRNSHolding(s) in Company
23rd Jun 20157:00 amRNS2014 Final Results
22nd May 20157:00 amRNSOperations Update
20th Mar 20157:00 amRNSOperations Update
5th Mar 201511:55 amRNSHolding(s) in Company
4th Mar 20154:40 pmRNSSecond Price Monitoring Extn
4th Mar 20154:35 pmRNSPrice Monitoring Extension
27th Feb 20155:20 pmRNSHolding(s) in Company
3rd Feb 20157:00 amRNSOperations Update
18th Dec 20147:00 amRNSOperations Update
14th Oct 20147:00 amRNSTungolskoye No. 5 update
26th Sep 20147:00 amRNSHalf Yearly Report
8th Sep 20144:47 pmRNSHolding(s) in Company
29th Aug 20145:06 pmRNSAnnual General Meeting
19th Aug 20147:00 amRNSDrilling Operations Re-commencing
22nd Jul 20145:06 pmRNSHolding(s) in Company
4th Jul 20147:00 amRNSCompletion of Farmout
30th Jun 20144:45 pmRNSAnnual Report & Notice of AGM
30th Jun 20143:45 pmRNSFarmout Update
27th Jun 20148:35 amRNSFinal Results
28th May 201411:25 amRNSHolding(s) in Company
9th May 20143:54 pmRNSShareholder Meetings Update
24th Apr 201410:30 amRNSDocument Availability
17th Apr 20144:40 pmRNSSecond Price Monitoring Extn
17th Apr 20144:35 pmRNSPrice Monitoring Extension
17th Apr 20144:05 pmRNSLicence 61 Farmout Agreement
15th Apr 20147:00 amRNSFarmout Update
4th Apr 20143:16 pmRNSHolding(s) in Company
20th Mar 20147:00 amRNSEnterprise Securities Market Notice
18th Mar 20147:00 amRNSEGM Proposal
17th Mar 20147:00 amRNSFunding & Operations Update
23rd Jan 201412:01 pmRNSHolding(s) in Company
17th Jan 20146:24 pmRNSHolding(s) in Company
16th Jan 20147:00 amRNSOperations Update
5th Dec 20139:24 amRNSHolding(s) in Company
5th Dec 20139:22 amRNSHolding(s) in Company
3rd Dec 20137:00 amRNSOperations Update
28th Nov 201311:05 amRNSHolding(s) in Company
5th Nov 201312:16 pmRNSHolding(s) in Company
4th Oct 20134:13 pmRNSHolding(s) in Company
30th Sep 20137:00 amRNSHalf Yearly Report
20th Sep 20132:59 pmRNSHolding(s) in Company
11th Sep 20133:28 pmRNSResult of AGM
11th Sep 20137:00 amRNSOperations Update
28th Jun 20137:00 amRNSFinal Results
21st Mar 20137:00 amRNSOperations Update
18th Feb 201310:35 amRNSHolding(s) in Company
13th Feb 20132:28 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.