The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPremier African Minerals Regulatory News (PREM)

Share Price Information for Premier African Minerals (PREM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.205
Bid: 0.20
Ask: 0.21
Change: 0.02 (10.81%)
Spread: 0.01 (5.00%)
Open: 0.185
High: 0.215
Low: 0.185
Prev. Close: 0.185
PREM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zulu Update

23 Aug 2023 07:30

RNS Number : 1951K
Premier African Minerals Limited
23 August 2023
 

For immediate release

23 August 2023

Premier African Minerals Limited 

Zulu Update

 

Premier African Minerals Limited ("Premier" or the "Company"), is pleased to provide a further update on the Zulu Lithium and Tantalum Project ("Zulu") with particular reference to installation of the interim milling solution and concentrate grades.

Spodumene Concentrate Grade

The Board of Premier continues to expect that the Zulu plant will produce spodumene to the specification required by the Company's offtake partner.

 

Test work on Zulu was previously completed by Dorfner Anzaplan GmbH ("Dorfner"), a leading authority in the field of lithium and speciality minerals processing and treatment, and the results were notified on 16 June 2017. Dorfner reported that the rougher (spodumene) concentrate was upgraded in one cleaner stage to a concentrate with 6.5 wt.-% Li2O at 81.8wt.-% recovery.

 

Geolabs Global Pty Ltd ("Geolabs") have undertaken further floatation test work on material from Zulu this Summer. The spodumene rougher concentrate obtained from mica tailings at a grind size of p80 150 pm was subjected to a four-stage cleaner test. As a result, Geolabs have reported that a spodumene concentrate with a chemical grade of 6.56% Li2O, 0.26% K2O, 0.47% Na2O, and 2.31% Fe2O3 was achieved, along with an overall spodumene recovery of approximately 81%.

 

Geolabs further reported that based on the results, it may be worth testing magnetic separation on the final spodumene concentrate to reduce the Fe2O3 and meet the desired specifications. The plant at Zulu includes magnetic separation.

 

RHA Mill Installation

The planned relocation of the RHA mill to Zulu is an interim mitigation step. To date, the mill has been decommissioned at RHA and transported to the Zulu site and is under installation at present. Completion of civils and final assembly is underway, with installation of other feed and discharge components, pumps, control circuitry and grinding media charge all expected to be complete in the coming month when commissioning is planned to commence.

 

Stark have estimated that this interim step should result in sufficient correctly sized material feeding to the floatation circuit to achieve close to 50% of design capacity. On this basis the Company expects that new target production levels should be attainable by November 2023.

 

Market Abuse Regulation

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018.

 

The person who arranged the release of this announcement on behalf of the Company was George Roach.

 

A copy of this announcement is available at the Company's website, www.premierafricanminerals.com.

 

About Geolabs

Geolabs Global is a leading provider of mineral processing solutions for the mining and minerals industry, see https://www.geolabsglobal.com/.

 

Enquiries:

 

George Roach

Premier African Minerals Limited

Tel: +27 (0) 100 201 281

Michael Cornish / Roland Cornish

Beaumont Cornish Limited

(Nominated Adviser)

Tel: +44 (0) 20 7628 3396

Douglas Crippen

CMC Markets UK Plc

Tel: +44 (0) 20 3003 8632

Toby Gibbs/Rachel Goldstein

Shore Capital Stockbrokers Limited

Tel: +44 (0) 20 7408 4090

 

Forward Looking Statements:

Certain statements in this announcement are or may be deemed to be forward looking statements. Forward looking statements are identied by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. Nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward looking statements reect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward looking statements.

 

Glossary

"Fe2O3"

Is the chemical formula of iron oxide.

"Floatation circuits"

Flotation circuits are a common technology for the concentration of a broad range of minerals. Froth flotation is based on differences in the ability of air bubbles to adhere to specific mineral surfaces in a solid/liquid slurry.

"Li2O"

chemical formula of lithium oxide.

"Micas"

Micas are a group of silicate minerals whose outstanding physical characteristic is that individual mica crystals can easily be split into extremely thin elastic plates.

"SC6"

An important economic concentrate of spodumene, known as spodumene concentrate 6 or SC6, is a high-purity lithium ore with approximately 6 percent lithium content being produced as a raw material for the subsequent production of lithium-ion batteries.

"Spodumene"

A white to pink coloured lithium bearing mineral (LiAlSi2O6).

"Stark"

The Zulu design, procurement, installation, and commissioning contractor, Stark International Projects Limited.

"wt.-%"

is weight percent.

 

Notes to Editors:

Premier African Minerals Limited (AIM: PREM) is a multi-commodity mining and natural resource development company focused on Southern Africa with its RHA Tungsten and Zulu Lithium projects in Zimbabwe.

 

The Company has a diverse portfolio of projects, which include tungsten, rare earth elements, lithium and tantalum in Zimbabwe and lithium and gold in Mozambique, encompassing brownfield projects with near-term production potential to grass-roots exploration. The Company has accepted a share offer by Vortex Limited ("Vortex") for the exchange of Premier's entire 4.8% interest in Circum Minerals Limited ("Circum"), the owners of the Danakil Potash Project in Ethiopia, for a 13.1% interest in the enlarged share capital of Vortex. Vortex has an interest of 36.7% in Circum.

 

In addition, the Company holds a 19% interest in MN Holdings Limited, the operator of the Otjozondu Manganese Mining Project in Namibia.

  Ends

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDUOUNROSUWURR
Date   Source Headline
27th Apr 20231:00 pmRNSZulu Lithium Update
12th Apr 202312:30 pmRNSZulu Lithium Update
3rd Apr 202310:00 amRNSZulu Lithium Update
29th Mar 20232:00 pmRNSZulu Lithium Update
27th Feb 20237:00 amRNSZulu Assay Results
21st Feb 20231:00 pmRNSZulu Pilot Plant Update
30th Jan 20237:00 amRNSZulu Assay Results and Pilot Plant Update
9th Jan 20232:00 pmRNSResult of AGM
23rd Dec 20227:00 amRNSNotice of AGM
20th Dec 20228:00 amRNSZulu Assay Results and Pilot Plant Update
20th Oct 20227:00 amRNSZulu Assay Results and Pilot Plant Update
30th Sep 20227:00 amRNSHalf-year Report
7th Sep 20227:00 amRNSZulu Assay Results and Pilot Plant Update
26th Aug 20229:00 amRNSZulu Assay Results and Pilot Plant Update
15th Aug 20224:41 pmRNSSecond Price Monitoring Extn
15th Aug 20224:35 pmRNSPrice Monitoring Extension
3rd Aug 20227:00 amRNSZulu Lithium Project Pilot Plant Update
26th Jul 20227:00 amRNSZulu Assay Results and Pilot Plant Update
14th Jul 20227:00 amRNSZulu Assay Results Update
1st Jul 20227:00 amRNSZulu Assay Results Update
30th Jun 20222:00 pmRNSFinal Results
24th Jun 20227:00 amRNSZulu Lithium Project Pilot Plant
13th Jun 20222:05 pmRNSSecond Price Monitoring Extn
13th Jun 20222:00 pmRNSPrice Monitoring Extension
13th Jun 20227:00 amRNSInterim update Zulu Lithium Project
31st May 20227:00 amRNSGrant of Options
4th May 20229:06 amRNSSecond Price Monitoring Extn
4th May 20229:00 amRNSPrice Monitoring Extension
27th Apr 20228:00 amRNSResignation of Director
25th Apr 20227:00 amRNSJoint Venture Agreement
14th Apr 20227:00 amRNSAppointment of Director
1st Apr 20224:05 pmRNSHolding(s) in Company
29th Mar 20221:00 pmRNSCompletion of Zulu Lithium DFS Funding
25th Mar 20222:06 pmRNSSecond Price Monitoring Extn
25th Mar 20222:00 pmRNSPrice Monitoring Extension
11th Mar 20229:00 amRNSZulu Lithium DFS Funding Deposit
9th Mar 20229:05 amRNSSecond Price Monitoring Extn
9th Mar 20229:00 amRNSPrice Monitoring Extension
8th Mar 20225:01 pmRNSZulu Lithium DFS Funding
22nd Feb 20229:00 amRNSPrice Monitoring Extension
21st Feb 20227:00 amRNSZulu Update
16th Feb 202211:05 amRNSSecond Price Monitoring Extn
16th Feb 202211:00 amRNSPrice Monitoring Extension
16th Feb 20229:05 amRNSSecond Price Monitoring Extn
16th Feb 20229:00 amRNSPrice Monitoring Extension
15th Feb 20224:41 pmRNSSecond Price Monitoring Extn
15th Feb 20224:36 pmRNSPrice Monitoring Extension
15th Feb 20229:06 amRNSSecond Price Monitoring Extn
15th Feb 20229:00 amRNSPrice Monitoring Extension
14th Feb 202211:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.