Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Drilling Update

26 Nov 2020 07:00

RNS Number : 5335G
President Energy PLC
26 November 2020
 

 

 

26 November 2020

 

PRESIDENT ENERGY PLC

("President" or the "Company")

 

Testing success at well LB-1, Las Bases Field

Proven production from the previously undrained Centenario formation

President Energy (AIM: PPC), the energy company with a diverse portfolio of production and exploration assets, announces testing success at the old shut-in well, LB-1, Las Bases field, Rio Negro, Argentina.

 

Key points

Workover and testing of the shallow Centenario interval in the old shut-in well, LB-1 was a follow-on from the successful newly drilled well LB-1001

Gas freely and continuously flowed to surface in commercial quantities during test at choke sizes ranging from 4mm to 16mm

Potential to materially increase production by performing artificial stimulation

This represents the first time any hydrocarbons have been tested and flowed by President from this previously undrained Centenario interval within its concession areas

The commercial production of the shallow Centenario opens up the potential to cost effectively drill this prevalent shallow interval elsewhere in the Company's licences

Centenario formation will make a positive addition to President's end of year reserves (no reserves of any category currently booked for the formation)

The well will be placed on production before the year end

 

Las Bases LB-1

 

On 26 October the Company announced that, as a result of the success of the newly drilled LB-1001 at the Las Bases field, Rio Negro Province, there was potential for a workover, perforation and testing of the shut-in well LB-1 to initiate, in the words of the announcement "new previously untapped gas production".

 

LB-1 was drilled originally by Chevron and was a prolific producer of gas from deeper sections which subsequently watered out. It has been shut-in for several years, however, the results of LB-1001 highlighted the potential of gas production from a shallower, younger Cretaceous sand interval known as the Centenario at a depth of approximately 950 metres.

 

No commercial production by President or its predecessors in title has ever been seriously attempted from this interval which had in effect been bypassed and ignored. Accordingly, no reserves have ever been booked by President in respect of this interval despite the fact the Centenario Formation is prevalent at these shallow depths in the Las Bases, Puesto Prado and Estancia Vieja fields.

 

It is this sand body of approximately 7 metres (23 feet) which has now been tested. After perforation and an acid treatment to the interval the well flowed freely and continuously to surface through choke sizes varying from 4mm to 16mm with little or no water. On termination of the testing, pressure built up to original pressure within one hour suggesting inter alia good reservoir production qualities.

 

It is considered that, on production, this interval without further stimulation will initially flow, steady state, at approximately 21,000 M3/d (120 boepd). It is expected that this would increase materially with a hydraulic or further acid artificial stimulation due to what could be a tighter form of reservoir rock in this interval. In this regard, the rock properties and dynamic reservoir data will now be analysed and reviewed during the initial stages of production. A positive and important feature is the fact that on the logs there does not seem to be an identifiable oil / water contact nearby.

 

Work has now commenced on subsurface mapping of this interval across President's licence acreage. Whilst it is premature to say more, it is already clear that this result is a potential play opener at least in the Las Bases field and in any event it will make a positive addition to President's end of year reserves.

 

The cost of the workover is estimated on budget at a modest US$350,000 and the well will be placed on production before year end.

 

Peter Levine, Chairman, commented

 

"This is an encouraging result.

 

"Whilst in the context of our growing Group production, the expected pre-year end initial production can be said to be more incremental than material, the testing success has a potential impact of somewhat greater significance.

 

"Taking into account the now proven produceability of the reservoir, the shallow depth thereby meaning modest costs for drilling new wells, the potential to materially upscale production levels by artificial stimulation and in particular the prevalence of this Centenario interval over areas in our Concessions, it is a potentially new play opener in at least Las Bases and perhaps others of our Rio Negro fields.

 

"Accordingly, this result following on from the two successful drilled wells in the last two months, demonstrates the continued potential for organic growth in our onshore short cycle, high return conventional oil and gas assets as well as the maturing capability of our teams in handling multiple work streams simultaneously.

 

"Step by step may seem a trite expression but it underlines the clear and obvious positive rate of climb that President is achieving in its business."

 

 

Dr Martin Gee, PhD in Geophysics (Oxon), BSc (First Class hons) in Earth Sciences (Cardiff) who meets the criteria for qualified persons under the AIM guidance note for mining and gas companies, has reviewed and approved the technical information contained in this announcement.

 

 

Glossary:

Boepd means barrels of oil equivalent (oil and gas) per day

LB means a well in Las Bases field, Rio Negro Province, Argentina

M3/d means cubic metres of production of gas or oil as the case may be

 

 

 

 Contact:

President Energy PLC

Rob Shepherd, Group FD

Nikita Levine, Investor Relations

 

 

 

+44 (0) 207 016 7950

 info@presidentpc.com

finnCap (Nominated Advisor)

Christopher Raggett, Charlie Beeson

 

+44 (0) 207 220 0500

 

Shore Capital (Corporate Broker)

Jerry Keen, Antonio Bossi

 

 

+44 (0) 207 408 4090

 

 

 

 

 

 

 

 

Notes to Editors

 

President Energy is an oil and gas company listed on the AIM market of the London Stock Exchange (PPC.L) primarily focused in Argentina, with a diverse portfolio of operated onshore producing and exploration assets.

 

The Company has operated interests in the Puesto Flores, Estancia Vieja, Puesto Prado and Las Bases Concessions, and Angostura exploration contract, all of which are situated in the Rio Negro Province in the Neuquén Basin of Argentina and in the Puesto Guardian Concession, in the Noroeste Basin in NW Argentina. Alongside this, President Energy has cash generative production assets in Louisiana, USA and further significant exploration and development opportunities through its acreage in Paraguay and Argentina.

 

The Group is also actively pursuing value accretive acquisitions of high-quality production and development assets capable of delivering positive cash flows and shareholder returns. With a strong strategic and institutional base of support, including the international commodity trader and logistics company Trafigura, an in-country management team as well as the Chairman whose interests as the largest shareholder are aligned to those of its shareholders, President Energy gives UK investors access to an energy growth story combined with world class standards of corporate governance, environmental and social responsibility.

This announcement contains inside information for the purposes of article 7 of Regulation 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDQELFLBFLZFBQ
Date   Source Headline
18th Oct 20077:01 amRNSChanges to Board Structure
17th Oct 20071:28 pmRNSOrion 36 Update
25th Sep 200710:06 amRNSUpdate on Orion
17th Sep 20074:11 pmRNSDirectors Dealings
12th Sep 20077:01 amRNSGrant of Options
11th Sep 20078:00 amRNSOrion Well Resumes Production
6th Sep 20077:01 amRNSInterim Results
3rd Sep 200711:28 amRNSOrion Production Update
24th Aug 20077:03 amRNSProduction
17th Aug 200712:47 pmRNSAIM Rule 26 Compliance
16th Aug 20077:00 amRNSProduction commences at Orion
2nd Aug 200711:55 amRNSAGM Statement and Update
26th Jul 20073:20 pmRNSProduction at Calvin 36-1
19th Jul 20072:15 pmRNSExercise of options
18th Jul 20073:59 pmRNSDirectorate Change
5th Jul 20078:30 amRNSExercise of Options
29th Jun 20073:43 pmRNSAnnual Report and Accounts
28th Jun 20073:38 pmRNSDirector/PDMR Shareholding
28th Jun 20071:03 pmRNSGrant of Options
27th Jun 20071:56 pmRNSDirector/PDMR Shareholding
26th Jun 20077:10 amRNSPreliminary results
26th Jun 20077:02 amRNSRestatement for IFRS
21st Jun 20074:17 pmRNSHolding(s) in Company
8th Jun 20077:01 amRNSPlacing of New Shares
5th Jun 20074:07 pmRNSChange of Address
14th May 20077:01 amRNSCalvin Field update
30th Apr 20077:03 amRNSOperations Update
18th Apr 20074:44 pmRNSAus Native Title Agreed
4th Apr 20077:01 amRNSDirectorate Change
16th Mar 20077:01 amRNSOperations Update
27th Feb 20077:02 amRNSOrion Well Update
23rd Feb 20076:05 pmRNSExercise of Options
23rd Feb 20075:36 pmRNSExercise of Options
22nd Feb 20077:01 amRNSUS Operational Update
6th Feb 200711:54 amRNSDrilling Results
1st Feb 20074:55 pmRNSChange of Address
24th Jan 20075:23 pmRNSExercise of Options
22nd Jan 20074:53 pmRNSOperations Update-REPLACEMENT
22nd Jan 20077:02 amRNSOperations update
20th Dec 200610:49 amRNSTotal Voting Rights
19th Dec 20062:48 pmRNSPlacing of new shares
8th Dec 20065:35 pmRNSStatement re price movement
15th Nov 20067:02 amRNSCalvin Field Update
9th Nov 20067:01 amRNSJV signed with Ensight
7th Nov 200610:37 amRNSNative Title Agreement
27th Oct 20067:01 amRNSDirector appointment
18th Oct 20069:00 amRNSCFO Appointment
11th Oct 20064:51 pmRNSStatement re price movement
8th Sep 20067:01 amRNSInterim Results
1st Aug 20063:12 pmRNSActivity Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.