Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Drilling and Workover Update

22 Sep 2021 07:00

RNS Number : 3493M
President Energy PLC
22 September 2021
 

 

 

22 September 2021

 

PRESIDENT ENERGY PLC

("President" or the "Company")

 

Drilling and Workover Update

 

President Energy (AIM: PPC), the energy company with a diverse portfolio of production and exploration assets, announces a drilling and workover update on various of its assets.

Puesto Guardian Concession, Salta Province, Argentina

The Company has signed a drilling services contract for three firm wells to be drilled at the Puesto Guardian Concession before the end of this year. The contract also includes an option to retain the rig into the New Year for a further two wells after drilling of the third firm well.

This will enable continued drilling in the Concession, should the results from the ongoing seismic reprocessing confirm two additional prospects that have been previously identified.

The first three wells will be drilled in the Dos Puntitas field and the two contingent wells for 2022 in the Pozo Escondido field.

Each well is estimated to cost US$3.5 million and have a drilling time of 45 days with a mean success case initial projected oil production of 40 m3/d (250 bopd).

Site clearance for the first well has begun with the rig due to be mobilised during the first days of October. Drilling of the first well is now expected to commence by the end of the third week in October with drilling of all three wells expected to be completed by the end of the year with the final well in that sequence expected to be on stream in the first part of January 2022.

Triche and Simmons 2 wells, Louisiana

Both these wells remain offline as they have for the last three months awaiting workover of the Triche well to reinstate production. The operation of the Triche well is required for the Simmons 2 well to operate, as the Simmons 2 well used the gas produced from the Triche for gas lift.

The Triche well has not performed optimally all year due to the progressive breakdown of the downhole gravel pack in the well used to constrain sand production. The frustrating delay in fixing the problem has been materially exacerbated by the effects of Hurricane Ida which devastated the locality.

A rig is now available, but the Company is awaiting barge availability. It is hoped that the workover will be completed by the end of October and the wells will work at the levels enjoyed last year namely at 300 boepd net to President half being oil. Realisation prices are robust with oil currently at approximately $70 per barrel. Reserves levels are unaffected with lower than expected depletion due to the constrained production.

Peter Levine, Chairman, commented

 

"We look forward to the drilling campaign in Salta. With current prices there comparable to Rio Negro and fixed opex already covered by existing production, the incremental production will make a good contribution to Group.

 

"Louisiana, for various reasons out of our control, has been frustrating for much of this year. However we are close to being back on track. Nevertheless, the events have given management cause to assess the future of our Louisana assets within the Group and we will do so at or around the end of the year once the wells are back online and have been producing for a period".

 

Glossary

Bopd means barrels of oil per day

Boepd means barrels of oil equivalent per day

 

Contact:

President Energy PLC

Nikita Levine, Investor Relations

 

 

+44 (0) 207 016 7950

 

 info@presidentpc.com

finnCap (Nominated Advisor and broker)

Christopher Raggett, Tim Harper

 

+44 (0) 207 220 0500

 

 

 

 

 

 

 

Notes to Editors

President Energy is an oil and gas company listed on the AIM market of the London Stock Exchange (PPC.L) primarily focused in Argentina, with a diverse portfolio of operated onshore producing and exploration assets.

 

The Company has operated interests in the Puesto Flores, Estancia Vieja, Puesto Prado and Las Bases Concessions, and Angostura exploration contract, all of which are situated in the Rio Negro Province in the Neuquén Basin of Argentina and in the Puesto Guardian Concession, in the Noroeste Basin in NW Argentina. Alongside this, President Energy has cash generative production assets in Louisiana, USA and further significant exploration and development opportunities through its acreage in Paraguay and Argentina.

 

The Group is also actively pursuing value accretive acquisitions of high-quality production and development assets capable of delivering positive cash flows and shareholder returns. With a strong strategic and institutional base of support, including the international commodity trader and logistics company Trafigura, an in-country management team as well as the Chairman whose interests as the largest shareholder are aligned to those of its shareholders, President Energy gives UK investors access to an energy growth story combined with world class standards of corporate governance, environmental and social responsibility.

This announcement contains inside information for the purposes of article 7 of Regulation 596/2014

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEADNEADNFEFA
Date   Source Headline
6th Oct 20217:00 amRNSLoan Conversion
30th Sep 20217:00 amRNSUnaudited Interim Results and Current trading
23rd Sep 202112:00 pmRNSResults of AGM
22nd Sep 20217:00 amRNSDrilling and Workover Update
3rd Sep 20217:00 amRNSParaguay Farm-Out Update
31st Aug 20217:00 amRNSPosting of Annual Report and Notice of AGM
24th Aug 20217:00 amRNSAudited Results for year ended 31 December 2020
4th Aug 20217:00 amRNSOperations Update
28th Jul 20217:00 amRNSCGC Share Subscription
13th Jul 20217:00 amRNSOperations Update
9th Jul 20217:08 amRNSAtome - Company Acquisition
1st Jul 20217:00 amRNSAtome - Corporate Update
10th Jun 20217:00 amRNSExtension to Publication of Accounts
8th Jun 20217:00 amRNSParaguay Farm-Out Agreement Signed
26th May 20217:00 amRNSOperations and Corporate Update
12th May 20217:00 amRNSSecondary Recovery Project
10th May 20217:00 amRNSOperations and Prices Update
7th May 20214:41 pmRNSSecond Price Monitoring Extn
7th May 20214:35 pmRNSPrice Monitoring Extension
30th Apr 20217:45 amRNSOperations Update
28th Apr 20217:00 amRNSOperations Update
27th Apr 20217:00 amRNSCGC Share Subscription
21st Apr 20217:00 amRNSOperations Update
16th Apr 20214:41 pmRNSSecond Price Monitoring Extn
16th Apr 20214:35 pmRNSPrice Monitoring Extension
16th Apr 20217:00 amRNSDrilling Update
14th Apr 202111:05 amRNSSecond Price Monitoring Extn
14th Apr 202111:00 amRNSPrice Monitoring Extension
12th Apr 20217:00 amRNSDrilling Update
7th Apr 20217:00 amRNSTermination of Joint Corporate Broker
31st Mar 20217:00 amRNSDrilling Update
9th Mar 20217:00 amRNSDrilling Update
22nd Feb 202111:06 amRNSSecond Price Monitoring Extn
22nd Feb 202111:00 amRNSPrice Monitoring Extension
22nd Feb 20217:00 amRNSTrading Update and Investor Presentation
19th Feb 20214:41 pmRNSSecond Price Monitoring Extn
19th Feb 20214:36 pmRNSPrice Monitoring Extension
15th Feb 20214:41 pmRNSSecond Price Monitoring Extn
15th Feb 20214:36 pmRNSPrice Monitoring Extension
8th Feb 20217:00 amRNSNotice of Trading Update
8th Feb 20217:00 amRNSGroup Reserves Update
3rd Feb 20217:00 amRNSOperational Update
26th Jan 20217:00 amRNSCGC Share Subscription
20th Jan 20217:00 amRNSH1 2021 Drilling Update
15th Jan 202111:00 amRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSOperational Update
7th Dec 20207:00 amRNSOperation and Production Update
26th Nov 20207:00 amRNSDrilling Update
20th Nov 20207:00 amRNSGrant of Share Options
16th Nov 20207:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.