Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Resources PLC Regulatory News (POW)

Share Price Information for Power Metal Resources PLC (POW)

Share Price is delayed by 15 minutes
Get Live Data
13.875    -0.10 (-0.71%)
Bid:
13.75
Ask:
14.00
Spread: 0.25 (1.818%)
Market Cap: £15.70m
POW Live PriceLast checked at - London Stock Exchange

Intraday Power Metal Resources PLC Share Chart

Kalahari Key Botswana Update

30 Jul 2019 11:00

RNS Number : 1647H
Power Metal Resources PLC
30 July 2019
Β 

30 July 2019

Power Metal Resources plc ("POW" or the "Company")

Kalahari Key Botswana Update

Power Metal Resources plc (LON:POW) the AIM listed African focused metals exploration and development company is pleased to provide an update on ground operations being undertaken by Kalahari Key Mineral Exploration Pty Ltd ("Kalahari Key") at the Molopo Farms Complex project ("MFC" or the "Project") a Botswana Nickel-Copper-PGMs exploration project 100% owned by Kalahari Key.

Power Metal Resources has an 18.26% shareholding in Kalahari Key and also has a right by 31 December 2019 to elect to earn into a 40% direct project interest in the Molopo Farms Complex project, through an investment of US$500,000 in the Project by 31 December 2020.

Should the Company elect to earn in, Power Metal Resources will hold an effective economic interest of 50.96% in the Project.

The Company's Kalahari Key acquisition agreement was announced on 13 May 2019 and readers can review this announcement through the following link:

https://www.powermetalresources.com/n/n104/acquisition-and-earn-in-agreement-botswana-project

Β 

Paul Johnson, Executive Director of Power Metal Resources plc commented: "The pace at which the Kalahari Key team are progressing is impressive, with the ground geophysics programme expected to be completed by early August.

This important groundwork is designed to initially follow up 11 areas within the 17 conductor targets identified from the helicopter Electromagnetic ("EM") Survey and narrow down to a number of high-profile drill targets. In this region mineral deposits are under sand cover with no surface expression so the application of high-resolution geophysics is vital in identifying the most attractive drill locations.

I am hugely excited by the opportunity the MFC project presents for our shareholders, both through the POW 18.26% shareholding in Kalahari Key and the potential for the Company to earn in to a 40% direct project interest.

Consequently, we await with some excitement the outcome of the ground geophysics programme and the important results interpretation."

Β 

Highlights:

Β·; In May 2019 Kalahari Key engaged consultants Spectral Geophysics based in Gaborone, Botswana to immediately commence ground geophysics over targets for Ni-PGM mineralization identified by a recently completed helicopter-supported, High-resolution EM and magnetic survey (the "EM Survey");

Β 

Β·; The EM Survey had identified 17 conductor targets within the feeder/shear zone and were found by interpretation of the multiple parameter data obtained from the combined helicopter borne XCITETM electromagnetic-magnetic survey carried out by New Resolution Geophysics ("NRGTM");

Β 

Β·; The survey was carried out over the ENE-WSW Jwaneng-Makopong Feeder/Shear Zone through the centre of the Molopo Farms Complex;

Β 

Β·; Following a detailed review of EM survey and the 17 conductor targets identified a ground geophysics programme over the most promising targets commenced in May 2019 as planned;

Β 

Β·; The ground geophysics work is largely completed and is expected to conclude in early August 2019, with results interpretation shortly thereafter by the Kalahari Key team, alongside their consultant geophysicist, Cas Lotter;

Β 

Β·; The strategic objective of the ground geophysics programme is to produce in-depth information with regard to sub-surface conductors, including 3D imagery which will enable the technical team to identify priority drill targets for the next stage of the exploration programme;

Β 

Β·; A full update will be provided to the market detailing the outcome of the ground geophysics work and outlining the priority drill targets expected to be identified from that work.

Β 

GROUND GEOPHYSICS FURTHER INFORMATION

The system being employed is the High-Power Electro-Magnetic ("HPEM") transmitter capable of transmitting up to 200A together with the ultra-sensitive Supracon Jesse-Deep SQUID ("superconducting quantum interference device ") sensor hooked up to the industry standard EMIT Smartem24 receiver.

Transmitter loops of approximately 1km by 1km are being laid out using 35mm2 aluminium wire and lines (100 or 200m spacing) are being surveyed at either 50m or 100m reading interval, depending on depth to target.

In total eleven loops were planned around individual targets from the original helicopter EM Survey.

BACKGROUND TO KALAHARI KEY AND THE MFC PROJECT

Kalahari Key, registered in Botswana, is a mineral exploration and geological consultancy company that was established by Roger Key, Andy Moore, Simon Bate and Rick Bonner in November 2014.

In November 2016 the company acquired two mineral exploration licences (PL310/2016 and PL311/2016) from the Botswana Government. The licences cover the eastern and central parts of a shear/feeder zone through the centre of the Bushveld-related Molopo Farms Complex in southern Botswana. A third licence (PL202/2018) was acquired in early 2018 immediately to the south of PL311/2016.

The target mineralization is Ni-PGM in the shear/ feeder zone. Re-processing and re-interpretation of existing high-resolution airborne magnetic data and regional gravity data was initially used to identify target areas. Selected core from previous exploration programmes has also been examined to better understand the geology of the Complex.

Towards the end of 2018, NRGTM was contracted to complete a high-resolution airborne magnetic and Electro Magnetic survey over the feeder/shear zone using their Xcite TM methodology. The preliminary analysis of the new geophysical data has to date identified 17 conductor targets within the feeder/shear zone.

PROJECT LEVEL 40% EARN-IN TO THE MFC PROJECT

Not later than 31 December 2019 POW may elect, at its sole discretion, to earn-in to 40% of the MFC Project by entering into and then fulfilling a commitment to spend US$500,000 ("Committed Spend") during the period to 31 December 2020.

Upon POW entering into the Earn-in (or earlier with the agreement of all parties) an MFC Project operational committee (the "Committee") will be established comprising members Roger Key (Kalahari Key Director), Andrew Bell (POW Director) and Andrew Moore (Kalahari Key Director). The Committee will determine the allocation of the Committed Spend and management of operational activities. Upon completion of the Earn-in expenditure requirement POW will hold 40% of the MFC Project

The Committed Spend will be applied primarily to the completion of drilling of four targets at the MFC Project.

Also, upon POW entering into the Earn-in (or earlier if agreed by all parties) Paul Johnson (POW Director) will join the Board of Kalahari Key.

Neither the Committee members nor the existing or new directors of Kalahari Key will be remunerated for their services.

Also, upon the Company entering into the Earn-in, a Joint Venture Agreement will be established between the parties which will determine strategy, operational management and corporate structuring. This will include the usual fund or dilute provisions unless an alternate structure is agreed by the parties.

Β 

The information contained within this announcement is considered to be inside information prior to its release, as defined in Article 7 of the Market Abuse Regulation No.596/2014 and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

Β 

For further information please visit https://www.powermetalresources.com/ or contact:

Β 

Power Metal Resources plc

Paul Johnson (Executive Director)

+44 (0) 7766 465 617

SP Angel Corporate Finance (Nomad and Joint Broker)

Ewan Leggat

+44 (0) 20 3470 0470

SI Capital Limited (Joint Broker)

Nick Emerson +44 (0) 1483 413 500

Β 

Notes to Editors:

Power Metal Resources plc (LON:POW) is an AIM listed African focused metals exploration and development company exploring for the key metals used in power generation, transmission, storage and utilisation. The Board and team of advisors, who have proven expertise in exploration, mining and project generation, have identified an opportunity to utilise the Company's position to become a leader in the London market for investors to gain exposure to the power metal commodity suite, particularly cobalt, lithium, copper and nickel.Β 

Β 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
Β 
END
Β 
Β 
DRLRMMRTMBMJMRL
Date   Source Headline
2nd Jun 20267:00 amRNSResults for the Year Ended 31 December 2025
1st May 20267:00 amRNSUranium Joint Venture: Perch River Update
28th Apr 20267:00 amRNSCompletion of East Hawkrock Drill Programme
27th Apr 20267:00 amRNSTati Gold Project, Botswana - Development Update
20th Apr 20267:00 amRNSUranium JV: Badger Lake Drill Programme
27th Mar 20267:00 amRNSFermi Exploration Update; East Hawkrock Drilling
26th Mar 20267:00 amRNSTransaction in Own Shares
25th Mar 20267:00 amRNSTransaction in Own Shares
24th Mar 20267:00 amRNSTransaction in Own Shares
20th Mar 20267:00 amRNSStrategic investment in Chilean copper developer
19th Mar 202612:47 pmRNSTR-1: Notification of major holdings
10th Mar 20261:00 pmRNSHistoric transaction in own shares & TVR
2nd Mar 20267:00 amRNSStrategic investment and MoU signed with Greyridge
9th Feb 20267:00 amRNSUranium Joint Venture: Badger Lake Update
4th Feb 20267:19 amRNSBalthaga Project Update
3rd Feb 20267:00 amRNSSignificant U Targets Delineated on Reitenbach
27th Jan 20267:00 amRNSTati Project Development Update
26th Jan 20267:00 amRNSTransaction in Own Shares
23rd Jan 20267:00 amRNSTransaction in Own Shares
21st Jan 20267:00 amRNSTransaction in Own Shares
20th Jan 20267:00 amRNSTransaction in Own Shares
16th Jan 20267:00 amRNSTransaction in Own Shares
15th Jan 20267:00 amRNSTransaction in Own Shares
14th Jan 20267:00 amRNSTransaction in Own Shares
13th Jan 20267:00 amRNSTransaction in Own Shares
12th Jan 20267:00 amRNSTransaction in own shares
8th Jan 20262:26 pmRNSShare Capital Reduction Effective
6th Jan 20267:10 amRNSHolding(s) in Company
6th Jan 20267:08 amRNSHolding(s) in Company
5th Jan 20267:00 amRNSBalthaga Project Saudi Arabia: Exploration Update
5th Jan 20267:00 amRNSForm 8.3 - First Class Metals PLC
15th Dec 20257:00 amRNSBlock 8 Oman: Drilling Programme Results
9th Dec 20256:25 pmRNSHigh Court Approval of Share Capital Reduction
21st Nov 20256:25 pmRNSDirections Hearing for Share Capital Reduction
20th Nov 20257:00 amRNSPerch River Uranium Property Drill Assay Results
18th Nov 20257:00 amRNSDrake Lake-Silas Initial Assay Results
10th Nov 20251:33 pmRNSResult of General Meeting
6th Nov 202510:58 amRNSHolding(s) in Company
24th Oct 20257:00 amRNSFermi: Exploration Agreement Signed with YNLR
23rd Oct 20257:00 amRNSAcquisition of Strategic Stake in Apex Royalties
20th Oct 20257:00 amRNSNotice of General Meeting
16th Oct 20254:18 pmRNSCompletion of Initial Minestarters Investment
13th Oct 20257:00 amRNSGSAe update
29th Sep 20258:47 amRNSInterim Results
19th Sep 20257:00 amRNSProposed Capital Reduction
12th Sep 20257:00 amRNSChange of Registered Office
9th Sep 20257:00 amRNSBlock 8: Drilling Programme and Geophysics Results
8th Sep 20257:00 amRNSFermi Exploration: Summer 2025 Exploration Update
4th Sep 202512:35 pmRNS-RInterview with Power Metal and Minestarters
4th Sep 20257:00 amRNSProposed Investment in Minestarters

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.