Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Regulatory News (POW)

Share Price Information for Power Metal (POW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 12.50
Bid: 12.00
Ask: 13.00
Change: -0.75 (-5.66%)
Spread: 1.00 (8.333%)
Open: 13.25
High: 13.25
Low: 12.50
Prev. Close: 13.25
POW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Botswana Molopo Farms Complex - Drilling Update

22 Feb 2021 14:30

RNS Number : 9280P
Power Metal Resources PLC
22 February 2021
 

22 February 2021

Power Metal Resources PLC

 ("POW" or the "Company")

Botswana Molopo Farms Complex - Drilling Update

 

 

Power Metal Resources plc (LON:POW) the AIM listed metals exploration and development company is pleased to provide a further update from the Kalahari Key Mineral Exploration Pty Ltd ("Kalahari Key") Molopo Farms Complex Project (the "Project" or "MFC Project"), which is targeting prospective massive nickel sulphide and platinum-group metal ("PGM") mineralisation in Botswana.

 

Paul Johnson Chief Executive Officer of Power Metal Resources commented:

"Identification of additional visible sulphides deeper in hole KKME 1-6 gives further encouraging signals to the prospect of discovering significant mineralisation within the Molopo Farms Complex.

So far we are encouraged by the indications from core logging, and await assay results and mineralogical studies to confirm the sulphide minerals present. To be absolutely clear we make no assumption as to which sulphide minerals are present and await the assay results, and those results will likely guide the next exploration steps.

The identification of up to 14 new targets for ground exploration in the feeder zone from the Aster Mapping also adds to the evidence of district scale prospectivity.

Substantial new data continues to be generated on a relatively untested environment, advancing a journey of discovery in a geological setting where there is the clear potential for large scale metal deposits."

Highlights:

 

· The second diamond drill hole at the MFC Project, KKME 1-6, has been continued from 547m to a final depth of 598 metres in ultramafic rocks. The extra hole depth will provide further core from the geophysical target depth and will assist in further geophysical interpretation.

 

· Core from KKME 1-6 and from the first drill hole at KKME 1-14 has been transported to Lobatse where it is being cut by the Botswana Geoscience Institute. Selected half core samples will be sent to a South African assay laboratory for base and precious metal analysis, this week.

 

· Logging KKME 1-6 cut core has identified disseminated sulphide mineralisation below 500m drill hole depth, notably in the section marked as a target by the geophysics. This is further to disseminated sulphide mineralisation identified around 308-313m drill hole depth from the initial KKME 1-6 core inspection (announced 11 January 2021).

 

· An agreement has been signed with the University of Witwatersrand in Johannesburg and selected quarter core samples will be sent to the University's Geology Department this week for mineralogical and thin section analysis.

 

· A report received from Aster Funds Ltd ("Aster") based in Toronto entitled 'Satellite-Based Long Wave Infrared (LWIR), Short Wave Infrared (SWIR) and Synthetic Aperture Radar (SAR) Mapping, Molopo Farms Exploration Licences has identified about 14 new targets in the feeder zone, with priority targets recommended to be ranked for follow-up ground exploration.

 

· Down-hole geophysics data is expected to be acquired in the next phase of the current programme, this should help identify any massive sulphide mineralisation proximal to the disseminated sulphides encountered at around 308-313m drill hole depth and below 500m drill hole depth, in angled hole KKME 1-6.

 

 

OWNERSHIP STRUCTURE - MOLOPO FARMS COMPLEX PROJECT

Power Metal currently has an 18.26% shareholding in Kalahari Key and has elected to earn in ("Earn-In") to a 40% direct interest in the MFC Project by funding US$500,000 of exploration expenditure by 30 April 2021, notably the diamond drilling of selected targets (the "Drill Programme"). To date Power Metal have paid US$392,641 leaving a balance remaining of US$107,359 (approximately £76,801) which is fully covered by Power Metal cash resources.

THE DRILL PROGRAMME

The Drill Programme was for an initial planned 2,505m across four diamond core drill holes with planned target hole depths varying from 525m to 710m. Ultimate meterage to be drilled will be determined in due course.

The Drill Programme is designed to intersect four high priority targets prospective for massive nickel sulphide mineralisation, delineated by both Time Domain Electromagnetic ("EM") and Natural Field Audio Magneto Telluric ("NF-AMT") geophysics surveys.

DRILL HOLE KKME 1-14

The first drill hole KKME 1-14 at the MFC Project attained a target depth of 515.8m. The hole was completed safely and securely and achieved near 100% core recovery.

 

KKME 1-14 was sited in the Jwaneng-Makopong Shear/Feeder zone to the east of the main Molopo Farms Complex intrusion.

 

KKME 1-14 supports the geological proposition that the geology at Molopo Farm is that of a feeder zone. 

 

DRILL HOLE KKME 1-6

Hole KKME 1-6, the second hole, attained a target depth of 597.8m. The hole was designed to intercept the upper side of a conductive body modelled from geophysical survey data to commence around 500m down-hole depth.

KKME 1-6 is located in the project's Tshepo (Hope) Central Target Area, approximately 20km west-southwest of the programme's first drill hole KKME 1-14 and along strike on the shear zone interpreted as the Molopo Farms Complex Feeder Zone.

The Tshepo (Hope) Central Target Area lies within the centre of the interpreted feeder zone inside the near-surface sub-crop of the Molopo Farms Complex in Licence PL311/2016.

FURTHER INFORMATION

Kalahari Key have signed agreements with Aster Funds Ltd ("AFL") and Bell Geospace Ltd ("Bell") to integrate innovative exploration survey and processing techniques with the existing Kalahari Key airborne, AMT ground and downhole geophysical datasets with a view to accelerating and refining the exploration targeting process for future drill testing.

AFL employ satellite-based Aster Thermal Imagery to provide target mapping through longwave infra-red ("LWIR") and shortwave infra-red ("SWIR") Spectral Analysis and electromagnetic ("EM") conductivity analysis based on Synthetic Aperture Radar. These systems complement Kalahari Key's geophysical datasets and will help in the rapid determination of both the near-surface geology and alteration minerals which could be linked to underlying mineralised systems.

The collaboration with Bell will facilitate the integration and analysis of the KKME airborne and ground geophysical data with Bell's high-resolution Zeppelin airship-supported gravity data collected over the three Kalahari Key Molopo Farms Complex licence areas (PL202/2018, PL310/2016, PL 311/2016). 

COMPETENT PERSON STATEMENT

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MIMMM, MAusIMM, FGS), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Power Metal Resources PLC to provide technical support.

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

 

For further information please visit https://www.powermetalresources.com/ or contact:

Power Metal Resources plc

Paul Johnson (Chief Executive Officer)

+44 (0) 7766 465 617

SP Angel Corporate Finance (Nomad and Joint Broker)

Ewan Leggat/Charlie Bouverat

+44 (0) 20 3470 0470

SI Capital Limited (Joint Broker)

Nick Emerson

+44 (0) 1483 413 500

First Equity Limited (Joint Broker)

David Cockbill/Jason Robertson

+44 (0) 20 7330 1883

 

 

Notes to Editors:

Power Metal Resources plc (LON:POW) is an AIM listed metals exploration and development company seeking a large scale metal discovery.

The Company has a global portfolio of project interests including precious metal exploration in North America and Australia together with base and strategic metal exploration in Africa. Project interests range from early stage greenfield exploration to later stage prospects currently subject to drill programmes.

The Board and its team of advisors have expertise in project generation, exploration and development and have identified an opportunity to utilise the Company's position to become a leader in the London market for investors wishing to gain exposure to proactive global metals exploration.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLPPUMAPUPGGWP
Date   Source Headline
6th Mar 20237:00 amRNSResults for the Year Ended 30 September 2022
21st Feb 20234:30 pmRNSInsider Non-executive Director Options Extension
20th Feb 20237:00 amRNSAthabasca Basin - Uranium Portfolio Update
16th Feb 202310:00 amRNSVictoria Goldfields Australia – Update
7th Feb 20239:52 amRNSMolopo Farms, Botswana – Drill Programme Complete
2nd Feb 20237:00 amRNSStrategic Uranium Properties Staked - Athabasca
31st Jan 20234:30 pmRNSTotal Voting Rights
26th Jan 20233:16 pmRNSTati Project, Botswana – 2023 Exploration Underway
16th Jan 20237:15 amRNS£900,000 Equity Financing
9th Jan 202311:00 amRNSVictoria Goldfields Australia - Update
4th Jan 20233:23 pmRNSAcquisition - Canadian Graphite Project
3rd Jan 20233:58 pmRNSInsider Warrants & Options - Final Extension
23rd Dec 202211:00 amRNSHolding(s) in Company
22nd Dec 20227:00 amRNSCommercial Update
20th Dec 20221:21 pmRNSMolopo Farms Complex, Botswana - Drilling Update
15th Dec 20223:33 pmRNSTati Gold Project, Botswana - Exploration Plans
15th Dec 202210:43 amRNSMerger Agreement - Wilan Project, South Australia
13th Dec 20227:00 amRNSDrilling Begins at Historic Berringa Gold Mine
7th Dec 20227:00 amRNSMolopo Farms Complex, Botswana – Drilling Update
5th Dec 202210:41 amRNSFDR Selta Lithium Exploration & Company Update
2nd Dec 202210:26 amRNSAthabasca Uranium – Exploration Update
30th Nov 20224:30 pmRNSTotal Voting Rights
29th Nov 20223:23 pmRNSHolding(s) in Company
25th Nov 202212:17 pmRNSNew Lithium Project – Ontario, Canada
18th Nov 20224:27 pmRNSUpdate – Kavango Resources PLC
18th Nov 20222:06 pmRNSSecond Price Monitoring Extn
18th Nov 20222:00 pmRNSPrice Monitoring Extension
18th Nov 20222:00 pmRNSKalahari Key Acquisition Complete
7th Nov 20227:00 amRNSTati Project Botswana Final Drill Assay Results
4th Nov 20222:19 pmRNSDisposal of E-12 Uranium Property - Canada
3rd Nov 20224:13 pmRNSKalahari Key – Acquisition & Drilling Update
3rd Nov 20227:00 amRNSTati Project Botswana Initial Drill Assay Results
28th Oct 202210:17 amRNSKalahari Key Botswana - Acquisition Update
27th Oct 20222:45 pmRNSGolden Metal Resources – Golconda Gold Anomalies
27th Oct 20227:00 amRNSFDR Australia – Wallal Drill Clearance & Update
25th Oct 20227:00 amRNSMolopo Farms Complex - Geophysics Update T1-14
24th Oct 202212:52 pmRNSWarrant Update
20th Oct 20222:08 pmRNSMolopo Farms Complex – Botswana Drilling Update
18th Oct 20222:50 pmRNSQuarterly Business Update
14th Oct 20222:40 pmRNSHolding(s) in Company
12th Oct 20223:01 pmRNSCompany Adviser Warrant Pool
10th Oct 202212:11 pmRNSAppointment of Non-Executive Director
5th Oct 202210:25 amRNSInvestee Update – First Class Metals PLC
5th Oct 20229:39 amRNSUranium Portfolio Update – Athabasca Basin, Canada
30th Sep 20224:30 pmRNSTotal Voting Rights
30th Sep 20227:00 amRNSMolopo Farms Complex Project Update
28th Sep 20227:00 amRNSMolopo Farms Complex Project Update
22nd Sep 20222:30 pmRNSAcquisition Complete - Berringa Gold Mine
21st Sep 20221:50 pmRNSMolopo Farms Complex, Botswana – Drilling Underway
15th Sep 202210:22 amRNSMolopo Farms Complex – Geophysics & Drill Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.