Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Drilling Update

4 Jun 2007 07:00

Patagonia Gold PLC04 June 2007 PATAGONIA GOLD PLC Trading Symbol PGD.L 4 June 2007 PROGRESS REPORT ON DRILLING AT LA PALOMA AND EXPLORATION AT EL TRANQUILO Highlights •Resource drilling on the Lomada de Leiva Project, located on the La Paloma property, continues to report very encouraging results including an intersection of 28 metres at 5.71g/t gold from drill-hole LLR-04. •Sawn channel sampling on the Cap Oeste Prospect, located on the El Tranquilo property, reports significant breccia mineralization, including an interval of 37.5 metres at 1.90g/t gold from Trench TR 14. La Paloma Property The La Paloma property block, covering over 44 square kilometres, is locatedapproximately 40km to the south of the town of Perito Moreno in the Santa Cruzprovince of Argentina and contains the Lomada de Leiva Project and the adjacentBreccia Sofia Prospect. Lomada de Leiva Project-A drilling campaign, consisting of 62 drill holes for8,862 metres, commenced in February of this year, has been completed on the 100%owned Lomada de Leiva Project. The drilling was designed to validate historicaldrill data and to infill and extend the existing resource for definition toCanadian National Instrument 43-101 standards. Drilling results not previously reported include: +---------+----------+----------+---------+ | Drill | From | Interval | Gold | |Hole No. | Metres | metres | g/t | +---------+----------+----------+---------+ | LPD-11 | 38.0| 8.0| 2.46| +---------+----------+----------+---------+ | LPD-16 | 95.0| 19.0| 3.60| +---------+----------+----------+---------+ |including| 97.0| 5.0| 9.00| +---------+----------+----------+---------+ | LPD-18 | 102.0| 5.0| 3.08| +---------+----------+----------+---------+ | LPD-23 | 48.0| 7.0| 2.48| +---------+----------+----------+---------+ | and | 61.0| 8.0| 1.71| +---------+----------+----------+---------+ | and | 73.0| 6.0| 2.23| +---------+----------+----------+---------+ | LLR-04 | 49.0| 28.0| 5.71| +---------+----------+----------+---------+ |including| 51.0| 8.0| 8.27| +---------+----------+----------+---------+ | LLR-05 | 58.0| 12.0| 2.14| +---------+----------+----------+---------+ | LLR-07 | 47.0| 22.0| 1.67| +---------+----------+----------+---------+ |including| 47.0| 6.0| 3.47| +---------+----------+----------+---------+ Results are pending for a further 24 drill-holes completed in this campaign. Drilling has now extended the main mineralised zone from 300m, as previouslyreported, to over 420m. Drill-hole LLD-11 with an intersection of 8.0m @ 2.46 g/t Au is approximately 420 metres north of drill-hole LLD-07, which reported20.0m @ 2.66g/t Au. Breccia Sofia-Drilling on the adjacent Breccia Sofia prospect is ongoing. Todate 12 RC holes have been completed for 1,816 metres. Results are available forthe first 7 holes and significant intersections are listed below . +---------+----------+----------+---------+ | Drill | From | Interval | Gold | |Hole No. | Metres | metres | g/t | +---------+----------+----------+---------+ | BSR-02 | 92.0| 1.0| 27.10| +---------+----------+----------+---------+ | and | 114.0| 9.0| 1.74| +---------+----------+----------+---------+ | BSR-03 | 150.0| 5.0| 1.87| +---------+----------+----------+---------+ | BSR-06 | 90.0| 4.0| 2.88| +---------+----------+----------+---------+ | and | 118.0| 5.0| 3.25| +---------+----------+----------+---------+ The values indicate that a broad zone of gold grades >1g/t gold exists on strike500m from the Lomada de Leiva resource area. Geology and Mineralization-Ongoing assessment of drill core has enabled aprogressive understanding of the geology and mineralization at the Lomada deLeiva Project, which is hosted in Jurassic volcanic and volcanoclasticsediments. Drilling has identified a second, near vertical, structure within thebreccia hosting structural corridor. The higher-grade intersections within thewider lower grade zones appear associated with the intersection of these twozones. Drilling on the eastern margin of the main zone has revealed additionalmineralised structures, which could represent a repetition of the gold bearingzone or a sub-parallel structure. Additional drilling is planned to test thepotential of this mineralization. El Tranquilo Property. The El Tranquilo property block, covering over 40 square kilometres, is locatedapproximately 120km to the south east of La Paloma in the Santa Cruz province ofArgentina and contains the Cap Oeste Prospect and Breccia Valentino Prospect.Property 29 'La Bajada' is contiguous with El Tranquilo and contains a number ofgold anomalous and geologically encouraging areas. Cap Oeste Prospect-Detailed mapping and trenching has exposed a breccia hostedin felsic volcanics over a strike of 900 metres. The breccia is open to thenorth where it is covered by Quaternary sedimentation and to the south where itis obscured by a resistant silica cap. The prospect has never been drilled. The Cap Oeste breccia represents an interpreted high-level style ofmineralization defined at surface by multiphase pulses of low temperature quartzas vein stock-work and breccia matrix and proximity of the zone to spatiallyextensive zones of silica replacement. Trench samples indicate anomalous pathfinder element geochemistry (As, Sb andHg) and anomalous gold values are interpreted to represent the upper portion ofa low sulphidation epithermal gold system. Based on other examples of low sulphidation gold mineralization, particularlythroughout the Deseado Massif of the Argentine Patagonia, these features arecommonly strongly indicative of high gold grades occurring at depth. Trenches were excavated and sawn channel samples were collected over 1metreintervals (these are equivalent to horizontal diamond drill-holes and as suchcan be included in resource evaluation). Results from channels validate previousrock samples and historic channel samples. Significant sawn channel results aretabulated below: +---------+----------+----------+---------+ | Trench |Distance | Interval | Gold | | No. |from Datum|in metres | g/t | +---------+----------+----------+---------+ | TR 06 | 300m NW| 20.9| 0.22| +---------+----------+----------+---------+ | TR 05 | 150m NW| 69.1| 0.22| +---------+----------+----------+---------+ | TR 14 | 50m NW| 37.5| 1.90| +---------+----------+----------+---------+ |including| | 8.0| 5.80| +---------+----------+----------+---------+ | TR 04 | 0m| 34.0| 0.89| +---------+----------+----------+---------+ | TR 13 | 50m SE| 33.0| 0.22| +---------+----------+----------+---------+ | TR.12 | 100m SE| 10.0| 0.23| +---------+----------+----------+---------+ (A short (2m)exploration trench excavated 500m NW reported 0.27g/t gold.) The combination of ore grade to highly anomalous gold values from surface overuncharacteristically wide zones throughout the Cap Oeste Prospect provides for apotentially bulk mineable gold resource style target that will be drill testedin the next drill campaign scheduled to commence in October 2007. La Manchuria. Validation work, involving the re-sampling of drill core and sawn channelssamples, is almost complete. Additional trenches have been excavated andsampled. Assays are pending. This prospect area historically containssignificant gold values and the work to date has defined drill targets that willbe test drilled in the next drill campaign scheduled to commence in October2007. Marc Sale, (BSC. Geology, member AusIMM, member AIG) a Director and consultantto Patagonia Gold Plc and a qualified person as defined in National Instrument43-101, has reviewed and verified all scientific or technical mining disclosurecontained in this press release. ENDS For more information, please contact: Bill Humphries/Richard Prickett Anthony Cardew/Tim RobertsonPatagonia Gold Plc Tel: +44 (0) 20 7930 0777Tel: + 44 (0)2 7409 7444 Fax: +44 (0) 20 7925 0647www.patagoniagold.com Email: tim.robertson@cardewgroup.comTrading Symbol PGD.L This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Nov 20177:00 amRNSProduction Guidance and Resource Update
11th Oct 20177:24 amRNSCalcatreu Option Extension
27th Sep 20177:00 amRNSHalf Yearly Financial Statements
19th Sep 20171:18 pmRNSInterim Results Announcement Date Replacement
19th Sep 20177:00 amRNSInterim Results Announcement Date
31st Aug 20171:00 pmRNSCap-Oeste and Exploration Update
10th Jul 20177:00 amRNSOperations Update for Cap-Oeste
1st Jun 20177:00 amRNSCompletion of the Disposal of COSE
5th May 20177:00 amRNSOperations Update
2nd May 20177:00 amRNSChange of Registered Office Address
27th Apr 201712:40 pmRNSResult of AGM
25th Apr 20177:00 amRNSDisposal of COSE and Option
19th Apr 20173:20 pmRNSHolding(s) in Company
28th Mar 20177:00 amRNSFinal Results for the Year Ended 31 December 2016
23rd Dec 20167:00 amRNSCap-Oeste Project Operations Update
7th Nov 20167:00 amRNSUruguay Exploration Update
31st Oct 20167:00 amRNSCap-Oeste Project Operations Update - REPEAT
28th Oct 20165:39 pmRNSCap-Oeste Project Operations Update
29th Sep 20167:00 amRNSHalf Yearly Financial Statements
28th Sep 20167:00 amRNSInterim Results Announcement Date
30th Aug 20167:00 amRNSCap-Oeste Project and Lomada Operations Update
1st Jul 201612:00 pmRNSBoard Changes / Issue of shares to Directors
1st Jul 20167:00 amRNSChange of Broker
16th Jun 20162:05 pmRNSSecond Price Monitoring Extn
16th Jun 20162:00 pmRNSPrice Monitoring Extension
25th May 20169:00 amRNSHolding(s) in Company
20th May 20167:00 amRNSFurther Subscription
10th May 20163:20 pmRNSResult of Open Offer and General Meeting
10th May 20163:14 pmRNSResult of AGM
22nd Apr 20167:00 amRNSSubscription and Open Offer
15th Apr 20167:00 amRNSFinal Results
26th Feb 20167:00 amRNSUpdate on Lomada and Cap-Oeste
2nd Feb 20167:00 amRNSTrilogy Earn-In Agreement
6th Jan 20167:00 amRNSFurther re: Trilogy earn-in agreement
23rd Dec 20157:00 amRNSRemoval of tax on gold exports
21st Dec 20157:00 amRNSEconomic & fiscal policy changes in Argentina
24th Nov 20157:00 amRNSLomada Production Update
9th Nov 20157:00 amRNSProposed Earn-In Agreement
26th Oct 20154:40 pmRNSSecond Price Monitoring Extn
26th Oct 20154:35 pmRNSPrice Monitoring Extension
30th Sep 20157:00 amRNSHalf Yearly Report
21st Aug 20157:00 amRNSChange of Registered Office
19th Jun 20157:00 amRNSAdditional Listing/Directors' Shareholdings
10th Jun 20153:52 pmRNSResult of AGM
10th Jun 201510:30 amRNSDirectorate Change
1st Jun 20157:00 amRNSDirectorate Change
15th May 20157:00 amRNSPosting of Annual Report and Notice of AGM
12th May 20152:21 pmRNSCap-Oeste infill drilling update
21st Apr 20157:00 amRNSAppointment of CEO
9th Apr 20157:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.