Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Drilling Report

3 Jun 2008 07:00

RNS Number : 7739V
Patagonia Gold PLC
03 June 2008
 



PATAGONIA GOLD PLC 

Trading Symbol PGD.L

DRILLING UPDATE

CAP-OESTE, MANCHURIA AND LOMADA DE LEIVA 

GOLD-SILVER PROJECTS

Highlights:

Drilling on the Cap-Oeste mineralized structure, located on the El Tranquilo property, continues to intersect high grade gold and silver, including 15.20 metres @ 12.94g/t gold and 189g/t silver in drill-hole CO-80-D. The structure remains open at depth and along strike in both directions.

Results from drilling on the 'Main Zone' gold-silver project, located on the La Manchuria property, continue to report high grade gold and silver, including 2.85 metres at 22.35g/t gold and 401g/t silver in drill-hole LM-020-D.  The structure remains open at depth and along strike to the south.

Drilling results from Cap-Oeste not previously reported include:

 

Drill Hole No.

From Metres

Interval metres

Gold

 g/t

Silver

 g/t

CO-058-D

57.42

7.28

2.21

326

including

59.03

0.97

6.13

1,968

CO-060-D

88.00

7.00

3.78

51

CO-065-DR

140.90

30.10

1.59

18

CO-067-DR

3.00

24.00

1.85

76

including

23.00

3.00

5.89

401

CO-078-D

181.65

37.35

1.04

11

CO-080-DR

161.00

27.00

7.88

122

including

170.00

15.20

12.94

189

including

175.90

2.10

33.71

71

including

181.80

0.90

10.69

1,717

CO-081-DR

156.60

17.00

2.24

127

including

168.20

5.40

5.42

238

El Tranquilo Property.

The El Tranquilo property block, covering over 40 square kilometres, is located approximately 120km to the south east of La Paloma in the Santa Cruz province of Argentina and contains the Cap-Oeste Gold Project and the Breccia Valentina Prospect. 

Cap-Oeste Gold Project.

 

To date 95 drill holes have been completed on the main structure, now named the 'Bonanza vein', for a total of 11,329 metres. Drill-holes have been spaced at approximately 50 metre centres along 1,200 metres of the Cap-Oeste structure with closer spacing in the zone of the main shoot. Three rows of 50 metre step-back holes have been completed on most sections. These step-backs have been spaced at approximately 50 metre intervals covering no less than 150 metres across strike. Results are pending. 

Drilling has confirmed the presence of a wide gold mineralized structure with a core containing bonanza grade gold and silver. The main structure remains open at depth and along strike in both directions.  The high grade gold values are associated with bonanza grade silver values.

Ongoing drilling is currently focusing on exploration along mineralized structures outside of the main structure. The Cap-Oeste mineralised trend has now been identified in mapping and trenching for over 6 kilometres and remains open along strike and down dip to the north and south.

Chlumsky, Armbrust and Meyer, LLC. (CAM) of Lakewood, Colorado, has been retained by Patagonia Gold PLC (PGD) to independently define and describe a gold Resource at Cap-Oeste, which complies with Canada National Instrument 43-101 (NI 43-101). CAM have completed the technical due diligence on site.

La Manchuria property

The La Manchuria property, covering 5,575 hectares, is located approximately 50 kilometres to the east of the Cap-Oeste project in the Santa Cruz province of Argentina and contains the Manchuria 'Main zone' gold-silver project

Manchuria "Main Zone" project.

In February-March 2008 PGD completed a diamond drilling campaign, consisting of 20 holes for a total of 3,980 metres, on the 'Main Zone' gold-silver project, designed to infill and twin historic drill holes as well as expand the area of mineralization and in order to plan a resource oriented drill program for the second half of this year. 

Drilling results not previously reported include:

 

Drill Hole No.

From Metres

Interval metres

Gold

 g/t

Silver

 g/t

LM-016-D

187.85

0.85

11.80

33

LM-017-D

68.00

1.00

14.50

19

LM-020-D

119.50

2.85

22.35

401

including

121.65

1.55

27.53

612

including

121.65

0.70

31.40

246

Drilling of the "Main Zone" has confirmed and extended the high-grade gold and silver mineralization 300m to the south and the zone remains open but obscured by post-mineral cover.  

Interpretation of geophysics over the Main Zone and available geochemistry to the south indicates the potential for the structure to extend south for over 2,000 metres

Lomada de Leiva Project:

Drilling has recommenced at the Lomada de Leiva Gold deposit, designed to expand the known resource and to follow CAM's recommendations from their Resource and Scoping Studies.

To date 3 infill holes for 500m have been completed in the main resource area. Further drilling will testhe anomalous structures identified by the recently completed detailed geophysics survey.

 

Work is in progress on the National Instrument (NI) 43-101 compliant Scoping Study on the Lomada de Leiva Project, located on the La Paloma Property, and is expected to be completed in the near future.

Breccia Sofia Prospect

5 exploration drill holes, for a total of 604.65 metres, have been completed on the mineralised structural corridor along strike to the south of previously identified mineralization in hole BSR-015 containing 5m @ 17.5g/t Au.  Drilling has intersected numerous zones of veining. Results are pending.

Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) a Director and consultant to Patagonia Gold Plc and a qualified person as defined in National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this press release.

 

ENDS

For more information, please contact:

 

Bill Humphries/Richard Prickett 

Patagonia Gold Plc

Tel: +44(0)20 7409 7444

Simon Raggett / Angela Peace

Strand Partners Ltd

Tel: +44(0)20 7409 3494

David Bick / Mark Longson

Square 1 Consulting

Tel : +44(0)20 7929 5599

Alastair Stratton / Tim Graham

Matrix Corporate Capital LLP

Tel : +44(0)20 7925 3234 / +44(0)20 7925 7852

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSWFLESASEIM
Date   Source Headline
3rd Nov 20177:00 amRNSProduction Guidance and Resource Update
11th Oct 20177:24 amRNSCalcatreu Option Extension
27th Sep 20177:00 amRNSHalf Yearly Financial Statements
19th Sep 20171:18 pmRNSInterim Results Announcement Date Replacement
19th Sep 20177:00 amRNSInterim Results Announcement Date
31st Aug 20171:00 pmRNSCap-Oeste and Exploration Update
10th Jul 20177:00 amRNSOperations Update for Cap-Oeste
1st Jun 20177:00 amRNSCompletion of the Disposal of COSE
5th May 20177:00 amRNSOperations Update
2nd May 20177:00 amRNSChange of Registered Office Address
27th Apr 201712:40 pmRNSResult of AGM
25th Apr 20177:00 amRNSDisposal of COSE and Option
19th Apr 20173:20 pmRNSHolding(s) in Company
28th Mar 20177:00 amRNSFinal Results for the Year Ended 31 December 2016
23rd Dec 20167:00 amRNSCap-Oeste Project Operations Update
7th Nov 20167:00 amRNSUruguay Exploration Update
31st Oct 20167:00 amRNSCap-Oeste Project Operations Update - REPEAT
28th Oct 20165:39 pmRNSCap-Oeste Project Operations Update
29th Sep 20167:00 amRNSHalf Yearly Financial Statements
28th Sep 20167:00 amRNSInterim Results Announcement Date
30th Aug 20167:00 amRNSCap-Oeste Project and Lomada Operations Update
1st Jul 201612:00 pmRNSBoard Changes / Issue of shares to Directors
1st Jul 20167:00 amRNSChange of Broker
16th Jun 20162:05 pmRNSSecond Price Monitoring Extn
16th Jun 20162:00 pmRNSPrice Monitoring Extension
25th May 20169:00 amRNSHolding(s) in Company
20th May 20167:00 amRNSFurther Subscription
10th May 20163:20 pmRNSResult of Open Offer and General Meeting
10th May 20163:14 pmRNSResult of AGM
22nd Apr 20167:00 amRNSSubscription and Open Offer
15th Apr 20167:00 amRNSFinal Results
26th Feb 20167:00 amRNSUpdate on Lomada and Cap-Oeste
2nd Feb 20167:00 amRNSTrilogy Earn-In Agreement
6th Jan 20167:00 amRNSFurther re: Trilogy earn-in agreement
23rd Dec 20157:00 amRNSRemoval of tax on gold exports
21st Dec 20157:00 amRNSEconomic & fiscal policy changes in Argentina
24th Nov 20157:00 amRNSLomada Production Update
9th Nov 20157:00 amRNSProposed Earn-In Agreement
26th Oct 20154:40 pmRNSSecond Price Monitoring Extn
26th Oct 20154:35 pmRNSPrice Monitoring Extension
30th Sep 20157:00 amRNSHalf Yearly Report
21st Aug 20157:00 amRNSChange of Registered Office
19th Jun 20157:00 amRNSAdditional Listing/Directors' Shareholdings
10th Jun 20153:52 pmRNSResult of AGM
10th Jun 201510:30 amRNSDirectorate Change
1st Jun 20157:00 amRNSDirectorate Change
15th May 20157:00 amRNSPosting of Annual Report and Notice of AGM
12th May 20152:21 pmRNSCap-Oeste infill drilling update
21st Apr 20157:00 amRNSAppointment of CEO
9th Apr 20157:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.