Berg Aukas Pre Feasibility Study Results

27 May 2014 07:00

RNS Number : 0019I
China Africa Resources PLC
27 May 2014
 



China Africa Resources plc

("China Africa Resources" or the "Company")

 

Berg Aukas Pre Feasibility Study Results

 

China Africa Resources plc ("CAR") today announces the result of the Pre feasibility study ("PFS") on Berg Aukas. The PFS has been calculated on the basis of four different processing options, details of which are set out below. The PFS report is available on the company's web site.

 

Highlights:

 

· Berg Aukas shown to be a viable project.

· Pre-tax Net Present Values (10%) (NPV's) of between US$49 million and US$51 million (best-estimated value), dependent on the processing option selected.

· Post tax NPV's of US$29 million on best-estimated value.

· Pre-tax Internal Rate of Return (IRR) of 25% in real US$ terms.

· Minxcon stated that under the current economic environment the Project is robust and have recommended that the project move to the next decision level.

 

Pre feasibility study (PFS) overview of results

 

As a result of the successful 2012 diamond drilling campaign, and subsequent maiden JORC Mineral Resource Estimate, the Company has engaged a number of consultants who completed a PFS for the re-development of the Berg Aukas Zinc-Lead-Vanadium Mine in northern Namibia. The major contributors to the study are summarised in the table below:

 

Company

Responsibilities

CSA Global

Drill Programme Design and Supervision to Industry Standards, Including Training and QAQC.

EV Cameras

Video Inspection of No.2 Shaft

TWP Projects

Supervision and Reporting of Shaft Inspection

Coffey Mining

Maiden JORC Indicated Mineral Resource Estimation

Lund Mining

Mining Study, Ore Reserves

Redden Mining

Mining Study

Mintek

Metallurgical Testwork

Logiman

Phase 1 - Supervision of Mintek Testwork and Preliminary PFD

Logiman

Phase 2 - PFS Processing Options and Report Complication

Skorpion Zinc

Initial Testwork on ZnO Sample for Amenability to Processing at Skorpion Mine, Namibia

Huludao

Potential descloizite off-take, testing descloizite concentrate sample

Louis Dreyfus

Product Marketing

Minxcon

Financial analysis,

 

Project Description

 

The Berg Aukas Mine is located approximately 19km east of the town of Grootfontein in northern Namibia. The Berg Aukas mine operated as a low tonnage, high grade producer of zinc, lead and vanadium between 1958 and 1978, and hoisted an estimated 2.3Mt at an average grade of 15% Zn, 3.9% Pb and 0.85% V2O5 over this period. The mine ceased operations in 1978 due to depressed zinc prices and significant resources remain in situ. The majority of the remaining resource is located between the 14 and 19 levels (approximately 400m to 590m below surface where extensive development is already in place providing good access to the orebodies.

 

The mineral rights to the Berg Aukas mine and surrounds are held by China Africa Resources Namibia (Pty) Ltd (a wholly owned subsidiary of CAR) under two slightly overlapping mining licenses (ML), ML-14/2/3/2/1 and ML-14/2/3/2/24B. The mining licences expire on 31 March 2019 and encompass all known hard rock ore bodies, the slag dump and the tailings storage facilities and cover an area of 904ha.

 

Geology and Mineral Resource Estimate

 

The three major ore bodies are confined to a narrow (

 

Mineralisation is predominantly breccia hosted and intimately related to the extensive cavity system developed from surface to the lowest levels of the mine. Mineralisation consists of zinc and lead oxides and sulphides, with minor vanadium rich muds and cavity infill.

 

In April 2013 Coffey Mining Pty Ltd (Coffey) completed a maiden JORC Mineral Resource Estimate (Table 1) based on the CAR 2012 diamond drilling and historical drilling data (Whittaker, 2013). Mineral Resources are reported inclusive of Ore Reserves.

 

Classification

Cut-off Grade(Zn%)

Tonnes

Average Grade(Zn%)

Average Grade

(Pb%)

Average Grade

(V2O5%)

Indicated

2.0

1,339,600

14.74

3.69

0.329

2.5

1,303,880

15.09

3.76

0.330

3.0

1,264,800

15.47

3.84

0.331

3.5

1,217,930

15.94

3.95

0.333

Table 1: Coffey 2013 Mineral Resource Estimate (Whittaker, 2013)

 

JORC Compliant Ore Reserve Estimate

 

Classification

Cut-off Grade(ZnEq%)

TonnesMt

Average Grade(Zn%)

Average Grade

(Pb%)

Average Grade

(V2O5%)

Probable

5%

1.691

11.16

2.76

0.23

Table 2: Lund Mining 2013 Ore Reserve Estimate (Lund, 2013)

 

The Zinc equivalent is based on the combined zinc and lead content only at USD 2,000/tonne for both zinc and lead. While silver is not included in the ore reserve estimate due to insufficient data to be estimated in the Mineral Resource, the average Ag grade in the ore reserve blocks is 8.7g/t.

This is the reserve conversion of the Coffey Mineral Resource and does not include the material from the historic resource outside the Coffey model. This has been accounted for separately as mineral inventory within the life of mine (LOM).

 

Mining

 

Currently it is envisioned that the mining rate will ramp up to 250,000 tonnes per annum (tpa) hoisted by Year 3 of the operation. This is considered feasible as during the final six months of operation in 1978 the mine was hoisting at an annual rate of 258,000 tpa. After gravity pre-concentration the plant is expected to mill and process approximately 80,000tpa.

 

The average LOM Ore Reserve grades, including dilution and after applying appropriate modifying factors, are expected to be approximately 11.16% Zn, 2.76% Pb, 0.23% V2O5 and 8.7 g/t Ag.

 

Processing

 

Metallurgical testwork was undertaken by Mintek in Johannesburg, under the supervision of Logiman.

 

The testwork regime is focused on replicating and improving the successful sequential floatation process flow sheet used when the mine was in operation. In addition, considerable effort is being made to improve the pre-milling concentration of the ore using gravity separation. The PFS evaluated four processing options:

 

Option 1: Construction of a crusher, gravity pre-concentration plant, mill and flotation processing plant on site - the 'historical flowsheet'.

Option 2A: Construction of a crusher and gravity pre-concentration plant on site, with the pre-concentrate product trucked to an existing concentrator facility at Tsumeb (approx. 80km by road), and rehabilitation of parts of the Tsumeb concentrator.

Option 2B: Construction of a crusher and gravity pre-concentration plant on site. Direct sale of the pre-concentrate product.

Option 3: Trucking all ore to Tsumeb, construction of a gravity pre-concentration plant at Tsumeb, crusher, mill and flotation section rehabilitated at Tsumeb concentrator.

 

Gravity separation testwork results from Mintek indicate that a high zinc grade pre-milling product can be achieved using gravity separation alone (shaking tables and Dense Media Separation (DMS)) at 30% Zn and 10% Pb, with recoveries of 87% and 86% respectively. Significantly, over 90% of high gangue acid consuming material (Mg, Ca and CO3) is rejected using the gravity separation. A preliminary costing exercise for this has been undertaken by Logiman as Option 2B.

 

The flotation testwork undertaken by Mintek has demonstrated that the historical five-stage sequential flotation is verifiable and achievable. In addition, significant improvements have been made in the overall Zn and Pb grades to their respective primary sulphide concentrates (Table 3), and significant reductions in Zn reporting to the slimes and Pb reporting to the V2O5 concentrate (Table 4).

 

Logiman MB 2013

Historical

Comments

Concentrate

Zn%

Pb%

Zn%

Pb%

Zn Sulphide

66.5

1.4

54.3

4.6

Significantly improved Zn grade

Pb Sulphide

20.0

70.8

17.7

52.3

Significantly improved Pb grade

Zn Oxide

47.7

1.0

44.1

2.0

Pb Oxide

8.8

58.1

10.2

57.5

V2O5

7.1

39.7

17.4

42.6

Reduced Zn grade

Slimes

15.5

2.2

20.0

Reduced Zn grade

Table 3: 2013 Concentrate Grades (From MB) vs Historical Production (Historical Production Based on Final Three Years of Production)

 

Logiman MB 2013

Historical

Comments

Concentrate

% Zn Recovered

% Pb Recovered

% Zn Recovered

% Pb Recovered

Zn Sulphide

28.0

2.3

16.6

4.5

Increase in Zn reporting to conc

Pb Sulphide

4.2

56.9

2.2

20.4

Increase in Pb reporting to conc

Zn Oxide

56.6

4.8

37.1

6.6

Increase in Zn reporting to conc

Pb Oxide

0.4

9.7

0.1

1.9

Increase in Pb reporting to conc

V2O5

0.7

14.9

4.5

35.2

Decrease in Zn & Pb in conc

Slimes

1.7

0.9

30.0

0.0

Significant decrease in Zn to slimes

Recovered

91.6

89.5

90.5

68.6

Sig increase in Pb recovered

Table 4: Percentage of Metals Recovered In The Various Concentrates from MB (Historical Production Based on Final Three Years of Production)

 

Overall the 2013 testwork programme demonstrated that it is feasible to improve on the historical concentrate grades, especially the most significant Zn concentrates, and also to improve the recoveries of both Zn and Pb metals reporting to the major Zn and Pb concentrates. Significantly the amount of Zn metal reporting to the Zn slimes has been reduced from approximately 30% historically to less than 2%, mainly as a result of improved gravity separation.

 

Infrastructure

 

The existing electrical substation close to the mine site was initially constructed for the mining operation in the 1970's. The substation is now the major substation for Grootfontein and surrounding areas. After initial discussions with Nampower it is expected that up to 3MW will be available at the mine site, including the 750kVA currently used by Namwater in its pumping operations.

 

Process water will be readily available from the dewatering of the underground workings. Currently NamWater (the parastatal water supply company) maintains a water pumping station in the No.2 Shaft for the supply of water regionally. The mine dewatering will generate far more water than will be used by mining or any of the processing options.

 

Environmental and Permitting

 

If the project proceeds to development a new Environmental Clearance Certificate (ECC) will be required. This will require submission of an Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) to the Ministry of Environment and Tourism. It is expected that there will be considerable local support for the project to proceed and that during operation the considerable environmental legacies from previous mining operations will be rehabilitated and/or retreated.

 

Product Marketing

 

The mine produces five products as summarised in the previous table 5. zinc sulphide, lead oxide and sulphide concentrates are readily saleable to most smelters with standard treatment charges applicable.

 

The zinc oxide concentrate in its current form is of most interest to smelter/refineries that use solvent extraction prior to eletrowinning (SX-EW) in their process.

 

The descloizite (V2O5) concentrate has a limited market, with Huludao smelter in China being the only potential client identified. Unfortunately the annual production of this type of concentrate from Berg Aukas is insufficient to warrant the reactivation of Huludao's (currently dormant) vanadium recovery circuit. This may change in the future but for the purposes of this study it has been assumed that the descloizite concentrate is treated as a lead oxide concentrate with no credit for the vanadium content.

 

Process Pant and Infrastructure Capital Cost Estimate

 

Logiman (Part 3) has costed the capital requirements for the various options based on indicative quotes for the major items and factoring other costs where appropriate (Table 13).

 

These costs are considered to be +/- 30%.

 

Item

Option 1

Option 2A

Option 2B

Option 3

DIRECT FIELD COSTS (USDm)

PROCESSING

Civils

0.80

0.76

0.46

0.62

Structural

0.72

0.69

0.51

0.73

Mechanical

11.59

12.18

4.78

9.17

Electrical

1.99

2.85

2.04

1.94

Instrumentation

0.17

0.17

0.08

0.17

Transport

0.20

0.20

0.15

0.20

Valves

0.30

0.30

0.20

0.30

Piping

0.50

0.50

0.30

0.50

Non-Processing Items

0.45

0.31

0.30

0.19

Mobile Equipment

0.50

0.50

0.50

0.50

Startup & Commissioning Spares

0.43

0.43

0.20

0.40

P&G

4.75

5.18

2.47

5.39

Total Processing Pre-Production Capex (USDm)

22.40

24.07

11.99

20.11

INDIRECT FIELD COSTS (USDm)

EPCM

3.36

3.61

2.37

4.04

Total Indirect Costs (USDm)

3.36

3.61

2.37

4.04

TOTAL (USDm)

Total Pre-Production Capex (USDm)

25.76

27.68

14.36

24.15

Table 13: Summary of Processing Capital Costs

 

The sustaining capex has again been calculated at 4% of the mining opex per year.

 

Option 1: All processing takes places on site and Nampower supplies 3MW of electrical power at Berg Aukas, with the remaining requirements supplied by generators on site. Sufficient generator power will be available to run critical systems (mainly dewatering and hoisting) in event of a power failure.

 

Option 2A: The gravity separation takes place on site, with trucking of the pre-concentrate to a refurbished Tsumeb concentrator. Nampower supplies 3MW to the site, with the remaining requirements supplied by generators. Sufficient generator power will be available to run critical systems in event of a power failure. Nampower supplies all power to the rehabilitated Tsumeb Concentrator.

 

Option 2B: Gravity separation on site with the sale of the gravity separation product. All power supplied by Nampower with sufficient generator capacity on site to run critical systems in the event of a power failure.

 

Option 3: All ore trucked to Tsumeb with the processing at a rehabilitated concentrator. Nampower supplies 3MW to site, sufficient for all needs, and that there is standby generator capacity in case of power failure for critical systems such as dewatering and hoisting.

 

Basis of Valuation of the Mining Assets

 

In generating the Financial Model and deriving the valuations, the following was completed:-

· A Cash Flow Model with an effective date of November 2013.

· The free cash flow to equity holder ("FCFE") was set up in calendar years.

· A discount rate of 10% was applied as per the in-house model.

· The impact of mineral royalties has been included.

· Sensitivity analyses have been performed to ascertain the impact of discount factors, commodity prices, total working costs and capital expenditure.

· Capitalised expenses of USD2 million prior to start-up was included.

· A total of 10 years' production life and 11 years' project life was calculated.

· For tax purposes, assets other than freehold property are written off over three years.

 

Economic Input Parameters

 

Spot Prices

 

The commodity prices displayed in Table 8 (sourced from the in-house model) were used in the DCF. Price forecasts are illustrated against the current price levels and highs and lows forecast prices, which were sourced from analysts as reported in Consensus Economics Inc.

 

Table 8: Macro-Economic Forecasts and Commodity Prices over the LoM (Real Terms)

Commodities

Unit

LoM

Current1

Low2

High2

Silver

USD/oz.

20

19.87

16

25

Zinc

USD/tonne

2,000

2,065

1,900

2,975

Lead

USD/tonne

2,000

2,100

1,984

2,700

Vanadium Pentoxide

USD/tonne

13,000

14,550

Notes:

1. As at 14 May 2014.

2. Consensus Economics Inc.

 

Payability

 

The PFS investigated two different concentrate scenarios each of which attract a range of payabilities for the commodities at a discount to spot prices. The zinc oxide in its current form has a limited market and the obvious treatment route is through the Skorpion refinery, owned by Vedanta, at Rosh Pinah in Southern Namibia. The Skorpion refinery is a Solvent extraction and electrowinning ("SX/EW") operation and should not be affected by any deleterious elements.

 

In 2012 Skorpion conducted initial test work on Berg Aukas samples collected from the waste dump and concluded that the low Gangue Acid Consuming ("GAC") material would be amenable to processing at their facility (David-Howoses, 2012). Further test work carried out by Skorpion on the zinc oxide concentrate bulk sample produced by Mintek in 2013 confirmed the suitability of treating the zinc oxide concentrate at Skorpion refinery and subsequently Skorpion provided indicative treatment terms.

 

The descloizite (V2O5) concentrate also has a limited market, with Huludao in China being the only potential client. Currently, the financial analysis assumes that the descloizite concentrate is treated as a lead oxide concentrate with no credit for the vanadium content.

 DMS Concentrates

For the concentrates upgraded to DMS concentrates only, a significant discount adjustment is made to the price.

 

Table 9: Payability of Metal in DMS Concentrates

Commodities

Payability

Zn

50%

Pb

35%

V2O5

35%

Ag

35%

Source: China Africa Resources PFS Study.

 

Float Concentrates

Based on the current mass balance the potential concentrate grades are as follows:-

Table 10: Grades in Float Concentrates

Concentrate

Concentrate Grade

Zn %

Pb %

V2O5 %

Ag ppm

Zn Sulphide

66.5

1.4

0.3

50

Pb Sulphide

20.7

70.8

0.4

165

Zn Oxide

47.7

1.0

0.2

75

Pb Oxide

9.1

58.1

0.6

175

V2O5

7.1

38.6

13.0

0

Source: Mintek Testwork.

Indicative Treatment and Refining Charges (TC/RCs) for the lead sulphide and oxide and zinc sulphide concentrates for the PFS were sourced from Louis Dreyfus.

 

Table 11: Indicative Zinc Sulphide Treatment and Refining Charges

Items

Units

Charges

Zn content

% Payable

85%

Minimum Zn deduction

Units

8

Ag content

% Payable

90%

Ag deduction

Grams

50

Zinc TC/RC

USD per tonne concentrate

170

Ag RC

USD/ oz

1.5

Source: China Africa Resources PFS.

Zinc smelters normally pay for silver credits, but not for lead content.

 

Table 12: Indicative Lead Sulphide Treatment and Refining Charges

Items

Units

Charges

Pb content

% Payable

95%

Minimum Pb deduction

Units

3

Zn content

% Payable

10%

Ag content

% Payable

90%

Ag deduction

Grams

50

Pb TC/RC

USD per tonne concentrate

170

Ag RC

USD per oz

1.5

Source: China Africa Resources PFS.

Lead smelters normally pay for silver and zinc credits and do not receive a zinc TC/RC for zinc in the lead concentrates.

 

Table 13: Indicative Lead Oxide Treatment and Refining Charges

Items

Units

Charges

Pb content

% Payable

95%

Minimum Pb deduction

Units

3

Zn content

% Payable

10%

Ag content

% Payable

90%

Ag deduction

Grams

50

Pb TC/RC

USD per tonne concentrate

230

Ag RC

USD per oz

1.5

Source: China Africa Resources PFS.

Silver RC is based on USD/oz payable.

Indicative Zinc Oxide concentrate TC/RCs were obtained from Skorpion (Vedanta):-

· EITHER 85% payable & 25-30 cents per lb production costs for finished metal; and

· OR 60% payable and no further deductions.

The financial analysis has used the latter for simplicity as there is no material difference between the two options.

 

Table 14: Overall Payability

Project Duration

Overall Payability

Zinc Sulphide

Zinc

57%

Zinc Oxide

Zinc

60%

Lead Sulphide

Lead

67%

Lead Oxide

Lead

55%

V2O5 Treated at Pb Oxide

Lead

5.48%

Source: China Africa Resources PFS.

 Transport/Shipping

 

Table 15: Road Distances

From

To

Distance

Berg Aukas

Tsumeb

80 km

Berg Aukas

Walvis Bay

650 km

Berg Aukas

Rosh Pinah

1,350 km

Source: China Africa Resources PFS.

 

The expected cost of trucking ore or pre-concentrate to Tsumeb from Berg Aukas is USD 12.50/tonne; this is based on the experience of Weatherly International at its Namibian operations at Otjihase and Matchless Mines. Based on the current concentrate transport costs from Otjihase to Walvis Bay, the estimated cost of concentrate transport from Tsumeb/Berg Aukas to Walvis Bay is USD 30/wet metric tonne ("WMT"), and to Rosh Pinah USD 60/WMT. Other realisation costs are based on WTI experience in Namibia (Table 16).

 

Table 16: Realisation Charges

Item

Unit

Amount

Moisture Content

%

10

Concentrate BA/Tsumeb to Walvis Bay

USD/WMT

30

FOB/Handling

USD/WMT

45

Ocean Freight

USD/WMT

30

Insurance

USD/WMT

2

Concentrate to Skorpion

USD/WMT

60

Source: China Africa Resources PFS.

Taxes and Royalties

This section highlights the salient tax issues in Namibia as they may apply to CAR Namibia. Mining companies in Namibia, excluding those mining diamonds and petroleum, pay tax at a flat rate of 37.5%. Further detailed tax advice should be confirmed with the Namibian tax counsel as applicable. Value added tax ("VAT") is fully reclaimable, on a two-month cycle. Tax and royalties to the following amounts are expected to be paid:

 

Table 17: Tax and Royalties Payable over LOM (Real terms)

Item

Unit

Option 1

Option 2A

Option 2 B

Option3

Tax

USD million

40.347

41.777

21.584

37.424

Royalties

USD million

8.805

8.805

5.747

8.805

 

Timing of Deductions and Income

 

As a general rule, taxable profits and receipts are included for purposes of taxation in the tax year in which the taxpayer delivers the goods or renders the services giving rise to the income. Similarly, expenses are generally deducted on an accruals basis in the year during which the obligation to pay arises. The amount payable for customs duties varies but no duties are payable if imported from South Africa.

 

Deductions and Allowances

 

According to the Namibian tax law:

· The cost of machinery, motor vehicles, utensils, articles, ships and aircraft may be deducted in three equal annual amounts, starting in the year of acquisition.

· An initial allowance of 20% of construction cost is permitted for commercial buildings in the year the buildings are first used. An allowance of 4% is permitted in each of the following 20 years. For industrial buildings of a registered manufacturer, an initial allowance of 20% and an annual allowance of 8% are allowed. No allowance is granted for employee housing.

· Prospecting and development expenses incurred in mining operations are not subject to the tax depreciation rules described above. In general, prospecting expenses may be deducted in the year production begins.

· Costs incurred on infrastructure may be deducted over three years, starting in the year production begins.

· All companies may carry forward unused losses indefinitely to offset taxable income in future years. Losses may not be carried back.

· Companies that carry on mining operations may offset current-year and prior-year trading losses from mining against other trade income and vice versa. However, such losses must be apportioned on a pro-rata basis between mining and other trade income to determine taxable income from each source in the current year.

The Berg Aukas Project has an unredeemed loss of USD2 million for tax purposes. This figure was considered in the tax calculation.

 

Mining Royalties

 

Namibia applies a 3% mining royalty. The result is shown as a decrease in net income and thus a decrease in income tax liability.

 

Discount Rate

A company has different sources of finance, namely common stock, retained earnings, preferred stock and debt. Free cash flow is based on either free cash flow to the firm ("FCFF") or free cash flow to equity ("FCFE"). FCFF is the cash flow available to all the firm's suppliers of capital once the firm pays all operating expenses (including taxes) and expenditures needed to sustain the firm's productive capacity. The expenditures include what is needed to purchase fixed assets and working capital, such as inventory. FCFE is the cash flow available to the firm's common stockholders once operating expenses (including taxes), expenditures needed to sustain the firm's productive capacity, and payments to (and receipts from) debt holders are accounted for.

 

The cashflow was shown at 100% equity, hence the cash flow is shown as the FCFE. A discount rate of 10% was applied to the in-house model. Using this discount rate and Capital Asset Pricing Model ("CAPM") Minxcon illustrates the potential Beta or Project risk assumed for the Project in the calculation by:-

 

· Calculating from the 10% real discount rate used;

· converting to a nominal discount rate;

· using the 30 years US Government Bond as risk-free rate - 3.40%;

· using a market risk premium of 5%, a rate generally considered as being the investor's expectation for investing in equity rather than a risk-free government bond; and

· reflecting a Beta of 1.87, which Minxcon believes is fair for this Project.

 

Table 18: Berg Aukas Cost of Equity

Cost of Equity

Rate

Risk-free rate (US Long Bond rate)

3.40%

Risk premium of market

5.00%

Base beta (Project Premium)

1.87

Nominal Cost of equity (CAPM)

12.75%

Real Cost of Equity (CAPM)

10.00%

 

Discounted Cash Flow Analysis

Minxcon's in-house Discounted Cash Flow ("DCF") model was used to illustrate the FCFE net present value ("NPV") for the operation in real terms. The NPV is derived from post-royalties and tax, pre-debt real cash flows, using the techno-economic parameters, commodity price and macro-economic projections

 

This valuation is based on a free cash flow and measures the economic viability of the orebody to demonstrate if the extraction of the Mineral Reserve is viable and justifiable under a defined set of realistically assumed modifying factors. The model is based on calendar years running from January to December. The peak funding requirement for the annual model (See Option 1) is expected in 2015 for all the scenarios.

 

Pre-tax NPV and IRR's for the four scenarios are shown below

 

Table 19: Pre-Tax NPV's and IRR's (Real Terms - Pre-Tax)

Item

Unit

Option 1

Option 2A

Option 2B

Option 3

IRR (%)

31.53%

31.43%

25.27%

30.58%

NPV @ 0%

USD million

111

115

61

103

NPV @ 3%

USD million

88

91

47

81

NPV @ 5%

USD million

75

77

40

69

NPV @ 10%

USD million

49

51

24

45

 

Table 20displays the NPV of the four scenarios in constant money terms at various discount rates. A best-estimated value calculated at a real discount rate of 10% is either Option 1 or 2A. This is also reflected in the IRR of 25% for these two options.

 

Table 20: NPV at Various Discount Rates (Real Term - Post Tax)

NPV @ Different Discount Rates

Unit

Option 1

Option 2A

Option 2B

Option 3

NPV @ 0%

USD million

71

73

40

66

NPV @ 3%

USD million

55

57

30

51

NPV @ 5%

USD million

46

47

24

42

NPV @ 10%

USD million

29

29

13

26

 

Table 21 illustrates the profitability ratios of the Project.

 

Table 21: Profitability Ratios

Item

Option 1

Option 2A

Option 2B

Option 3

IRR (%)

25.08%

24.98%

19.96%

24.31%

LoM

10

10

10

10

PV of Income Flow

99

102

63

94

PV of Investment

47

49

36

45

Benefit-Cost Ratio

2.11

2.10

1.73

2.06

Capital Gain

111%

110%

73%

106%

Average Payback

3.77

3.77

4.29

3.82

 

Next Steps

 

The Company's board will review the PFS in detail at their next board meeting planned for June and a further update will be supplied thereafter.

 

Abbreviations used

amsl

Above Mean Sea Level

CAR

China Africa Resources Ltd

CARN

China Africa Resources Namibia (Pty) Ltd

COB

Central Ore Body

COG

Cut-Off Grade

CPR

Competent Persons Report

CRM

Certified Reference Material

DMS

Dense Media Separation

ECC

Environmental Clearance Certificate

EIA

Environmental Impact Assessment

EMP

Environmental Management Plan

GAC

Gangue Acid Consuming

HWOH

Hanging Wall Ore Horizon

ILZSG

International Lead Zinc Study Group

JORC

Joint Ore Reserves Committee 2012 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves

LME

London Metal Exchange

LOM

Life Of Mine

Ma

Million Years

MET

Ministry of Environment and Tourism

MME

Ministry of Mines and Energy

ML

Mining Licence

Mt

Million Tonnes

Mbs

Metres Below Surface

MRE

Mineral Resource Estimate

NOH

Northern Ore Horizon

PFS

Pre Feasibility Study

QAQC

Quality Assurance Quality Control

SWACO

South West Africa Company

tpa

Tonnes Per Annum

tpm

Tonnes Per Month

TSF

Tailings Storage Facility

USD

United States Dollars

USDm

Millions of United States Dollars

ZnEq

Zinc Equivalent

 

Competent Persons Statement

The contents of the announcement have been reviewed and approved by the following competent person:

 

Johan Odendaal (Director, Minxcon): B.Sc. (Geol), B.Sc. Hons (Min. Econ.), M.Sc. (Min. Eng.), Pr. Sci. Nat. Reg. No. 400024/04, FSAIMM Reg. No. 702615, MGSSA No. 965119, MAusIMM Reg. No. 220813, IAS

 

Johan has over 25 years' experience in the mining and financial industry. This includes 7 years as an independent mining consultant specialising in the valuation of mining projects and 12 years as a mining analyst at two major stockbroking firms.

 

About Minxcon

Minxcon is a multi-faceted South African advisory company offering a wide range of exploration, resource, mining, metallurgical, financial valuation and advisory services to both local and international companies. Minxcon has the critical mass to advise mining and exploration companies on all mining disciplines and to assist such companies in undertaking new projects - from initial target generation stage right through to final mine closure.

 

Further information and detail on Minxcon clients can be accessed at www.minxcon.co.za

For further information contact:

 

Rod Webster, Chief Executive Officer Weatherly International +44 (0)207 917 2989

Max Herbert, Company Secretary

 

Samantha Harrison / James Biddle RFC Ambrian Limited +44 (0)203 440 6800

Nominated Advisor

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRAFMBTMBATBMI
Date   Source Headline
12th Jun 20233:42 pmRNSCreditors’ Voluntary Liquidation
7th Jun 202311:01 amRNSTrading in Minto Shares Ceased
24th May 20235:22 pmRNSGeneral Meeting
18th May 20237:36 amRNSStatement re. Suspension
18th May 20237:30 amRNSSuspension - Pembridge Resources plc
16th May 20233:44 pmRNSMinto Directors
15th May 20235:45 pmRNSMinto Shares Suspended
15th May 20237:00 amRNSMinto Suspension of Operations
2nd May 20237:00 amRNSMinto Updates and New Terms Agreed with Pembridge
28th Apr 20237:00 amRNSAnnual Financial Report
27th Apr 202312:50 pmRNSMinto Q1 Production
20th Apr 202312:42 pmRNSYukon Inspector Direction
12th Apr 202311:54 amRNSMinto Exploration Result
6th Apr 202311:48 amRNSMinto - Financial and Production Results for 2022
16th Mar 20232:04 pmRNSMinto Skagway Port Developments
2nd Mar 20237:00 amRNSExtension to the CLN Term
28th Feb 202311:52 amRNSMinto Drilling Results
23rd Feb 202311:52 amRNSMinto Production for 2022
2nd Feb 202311:48 amRNSMinto Drilling Update
6th Jan 20237:09 amRNSMinto Receivable Update
20th Dec 202211:49 amRNSMinto Magnetotellurics survey
30th Nov 202211:43 amRNSMinto Announces Automatic Share Purchase
24th Nov 20229:51 amRNSDirector/PDMR Shareholding
18th Nov 20227:00 amRNSLoan Renewed
17th Nov 202211:47 amRNSMinto Q3 Results
20th Oct 202212:01 pmRNSMinto Exploration Results
13th Oct 20227:00 amRNSMinto Receipt Update
12th Oct 202211:38 amRNSMinto Q3 Production
13th Sep 20227:00 amRNSMinto Reclamation Costs Security
8th Sep 202210:33 amRNSHalf-year Report
23rd Aug 202211:40 amRNSMinto Metals Q2 Results
25th Jul 202212:33 pmRNSDirector/PDMR Shareholding
19th Jul 202211:42 amRNSMinto Q2 Production
4th Jul 20223:27 pmRNSHolding(s) in Company
30th Jun 20227:00 amRNSMinto Loan Repayment Received
29th Jun 202211:39 amRNSMinto AGM
23rd Jun 20227:00 amRNSResult of AGM
22nd Jun 202210:33 amRNSHolding(s) in Company
14th Jun 202211:54 amRNSChange of Registered Office
8th Jun 20225:35 pmRNSHolding(s) in Company
31st May 20227:00 amRNSIssue of Equity
26th May 202212:21 pmRNSMinto Q1 2022 Results
26th May 202212:06 pmRNSMinto Q1 2022 Results
23rd May 20225:01 pmRNSHolding(s) in Company
20th May 20221:43 pmRNSHolding(s) in Company
17th May 202211:45 amRNS4 Year Concentrate Offtake at Minto
29th Apr 20227:00 amRNSAnnual Financial Report
28th Apr 202211:31 amRNSMinto Drill Results
6th Apr 20224:22 pmRNSMinto Production Q1 2022
1st Apr 20228:04 amRNSMinto Full Year Results 2021

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.