Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Operational Update

12 Jan 2010 07:00

RNS Number : 3625F
Petroceltic International PLC
12 January 2010
 



Petroceltic International plc

Algeria Operational Update

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa and the Mediterranean, in association with its partner Sonatrach, the Algerian National Oil & Gas Company is pleased to issue an operational update on its Isarene permit in the Illizi Basin in South Eastern Algeria.

As previously announced, a gas column in excess of 80 metres has been logged in the Ordovician reservoir in well AT-3, the second delineation well in the Ain Tsila gas condensate discovery. Testing of the AT-3 well on the discovery has confirmed that the gas at this location is in the same pressure regime as wells AT-1 and AT-2, demonstrating that this gas condensate discovery extends for a distance of over 22km, from AT-1 to AT-3.

Fracture stimulation, which is usually necessary to achieve commercial flow-rates from the Ordovician reservoir in the Illizi Basin, could not be successfully completed in the AT-3 well due to the presence of an in-situ rock stress regime significantly higher than that measured at AT-1 and AT-2, and higher than had been anticipated in the well design. Consequently, the pressures required to fracture stimulate the AT-3 well exceeded the pressure rating of the wellhead equipment, and the Company was unable to fracture stimulate the well with the available equipment. Local high in-situ stress caused by localised tectonic history is a known issue in other Illizi basin fields in Algeria and the Company considers that it is likely to be of limited local extent, rather than regionally extensive. 

The AT-3 well has now been suspended with a view to completing the fracture stimulation and testing as part of a future Ain Tsila appraisal campaign when wellhead equipment with a higher pressure rating can be deployed. This is planned to be later in 2010, subject to Government and partner approval.

Data from the three wells drilled in the Ain Tsila discovery have demonstrated the presence of an extensive and probably continuous gas accumulation capable of flowing at rates exceeding 30mmscf/d following fracture stimulation. A Discovery declaration for the Ain Tsila field has been filed with Sonatrach, in accordance with the Production Sharing Contract.

Drilling is currently underway on the INW-2 well in the north west of the block, on the Issaouane NW prospect. The rig has logged two gas bearing intervals in the primary Devonian F2 objective, and is now drilling in the secondary Ordovician reservoir objective. The Devonian F2 gas intervals will be tested after completion of drilling.

Brian O'Cathain, Chief Executive of Petroceltic, commented: 

"We are pleased that the 3rd well on the Ain Tsila Ridge Discovery in this drilling campaign has demonstrated pressure continuity with the earlier two wells drilled, and the presence of a single large gas accumulation in the field. Additionally, the logging results from INW-2 look positive, and we are hopeful that this well will prove up another commercial gas flow rate in the block. We are now working to interpret and integrate the large volume of data from these discoveries, with a view to making an application to the Algerian authorities for an appraisal period extension to the production sharing contract in the near future. We hope to be carrying out further appraisal drilling on the Ain Tsila field later this year, subject to partner and Government approval".

Ends

For further information, please contact:

Petroceltic

Brian O'Cathain Chief Executive Tel: +353 (1) 421 8300

Alan McGettigan Finance Director

Pelham PR

Philip Dennis Tel: +44 20 7337 1516 

Klara Kaczmarek Tel: +44 20 7337 1524

Murray Consultants

Joe Murray Tel: +353 (1) 4980300

Davy

Hugh McCutcheon Tel: +353 1 6796363

John Frain

Fabrice Toussaint, Head of Petroleum Engineering, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Mr. Toussaint holds a Diploma in Engineering from the Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, and has over 17 years experience in oil & gas exploration and production. He is a member of the Society of Petroleum Engineers.

Notes to Editors:

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's IEX Market. The Company has exploration and appraisal assets in AlgeriaTunisia and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQFLFFBFFLBBX
Date   Source Headline
16th Jun 20144:10 pmRNSFurther Adjournment of EGM
16th Jun 20149:45 amRNSEquity Placing and EGM Update
9th Jun 20142:56 pmRNSEGM Adjournment
6th Jun 20145:44 pmRNSAdjournment of EGM
30th May 20145:08 pmRNSHolding(s) in Company
30th May 20147:00 amRNSNotice of AGM
30th May 20147:00 amRNSResponse to Worldview Announcements
30th May 20147:00 amRNSOperations Update
30th May 20147:00 amRNS2013 Annual Financial Report & Notice of AGM
29th May 20145:01 pmRNSHolding(s) in Company
27th May 20142:52 pmRNSWorldview Announcements
27th May 20147:00 amRNSHolding(s) in Company
22nd May 20142:57 pmRNSHolding(s) in Company
21st May 20147:00 amRNSEnterprise Securities Market Notice
20th May 20142:22 pmRNSHolding(s) in Company
16th May 20145:00 pmRNSPosting of Circular
16th May 201410:12 amRNSResult of Placing
16th May 20147:00 amRNSPlacing
16th May 20147:00 amRNSPreliminary Results
9th May 20144:23 pmRNSHolding(s) in Company
8th May 20147:00 amRNSOperations Update
10th Apr 201410:43 amRNSHolding(s) in Company
8th Apr 201411:13 amRNSHolding(s) in Company
7th Apr 201412:39 pmRNSKurdistan Operational Update
2nd Apr 201411:22 amRNSHolding(s) in Company
18th Mar 20145:36 pmRNSHolding(s) in Company
18th Mar 20142:35 pmRNSHolding(s) in Company
28th Feb 201410:26 amRNSHolding(s) in Company
13th Feb 20147:00 amRNSAlgeria Farmout Update
14th Jan 20147:00 amRNSEnterprise Securities Market Notice
8th Jan 20142:59 pmRNSIssue of Equity
7th Jan 20147:00 amRNSOperational Update and Guidance
13th Dec 20137:00 amRNSRomanian Exploration Drilling
14th Nov 20137:00 amRNSRomanian Drilling Update
9th Oct 201312:28 pmRNSHolding(s) in Company
7th Oct 20137:00 amRNSAlgeria Farmout Process Update
16th Sep 20132:50 pmRNSDirector/PDMR Shareholding
16th Sep 20137:00 amRNSAppointment of Non-Executive Director
16th Sep 20137:00 amRNSBulgarian Operational Update
9th Sep 20137:00 amRNSInterim Results and Operational Update
2nd Sep 20137:00 amRNSKurdistan and Romania Drilling Campaigns Commence
15th Aug 20134:35 pmRNSPrice Monitoring Extension
9th Aug 20135:36 pmRNSHolding(s) in Company
2nd Aug 20134:34 pmRNSEnel Receivable Determination
12th Jul 20137:00 amRNSAward of New Greek Licence
5th Jul 20137:00 amRNSIssue of Legal Proceedings
3rd Jul 20137:29 amRNSItalian Operational Update
12th Jun 20134:02 pmRNSHolding(s) in Company
7th Jun 20137:00 amRNSBoard Change
30th May 20133:10 pmRNSResults of AGM and Withdrawal from Scheme

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.