Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Operational Update

12 Jan 2010 07:00

RNS Number : 3625F
Petroceltic International PLC
12 January 2010
 



Petroceltic International plc

Algeria Operational Update

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa and the Mediterranean, in association with its partner Sonatrach, the Algerian National Oil & Gas Company is pleased to issue an operational update on its Isarene permit in the Illizi Basin in South Eastern Algeria.

As previously announced, a gas column in excess of 80 metres has been logged in the Ordovician reservoir in well AT-3, the second delineation well in the Ain Tsila gas condensate discovery. Testing of the AT-3 well on the discovery has confirmed that the gas at this location is in the same pressure regime as wells AT-1 and AT-2, demonstrating that this gas condensate discovery extends for a distance of over 22km, from AT-1 to AT-3.

Fracture stimulation, which is usually necessary to achieve commercial flow-rates from the Ordovician reservoir in the Illizi Basin, could not be successfully completed in the AT-3 well due to the presence of an in-situ rock stress regime significantly higher than that measured at AT-1 and AT-2, and higher than had been anticipated in the well design. Consequently, the pressures required to fracture stimulate the AT-3 well exceeded the pressure rating of the wellhead equipment, and the Company was unable to fracture stimulate the well with the available equipment. Local high in-situ stress caused by localised tectonic history is a known issue in other Illizi basin fields in Algeria and the Company considers that it is likely to be of limited local extent, rather than regionally extensive. 

The AT-3 well has now been suspended with a view to completing the fracture stimulation and testing as part of a future Ain Tsila appraisal campaign when wellhead equipment with a higher pressure rating can be deployed. This is planned to be later in 2010, subject to Government and partner approval.

Data from the three wells drilled in the Ain Tsila discovery have demonstrated the presence of an extensive and probably continuous gas accumulation capable of flowing at rates exceeding 30mmscf/d following fracture stimulation. A Discovery declaration for the Ain Tsila field has been filed with Sonatrach, in accordance with the Production Sharing Contract.

Drilling is currently underway on the INW-2 well in the north west of the block, on the Issaouane NW prospect. The rig has logged two gas bearing intervals in the primary Devonian F2 objective, and is now drilling in the secondary Ordovician reservoir objective. The Devonian F2 gas intervals will be tested after completion of drilling.

Brian O'Cathain, Chief Executive of Petroceltic, commented: 

"We are pleased that the 3rd well on the Ain Tsila Ridge Discovery in this drilling campaign has demonstrated pressure continuity with the earlier two wells drilled, and the presence of a single large gas accumulation in the field. Additionally, the logging results from INW-2 look positive, and we are hopeful that this well will prove up another commercial gas flow rate in the block. We are now working to interpret and integrate the large volume of data from these discoveries, with a view to making an application to the Algerian authorities for an appraisal period extension to the production sharing contract in the near future. We hope to be carrying out further appraisal drilling on the Ain Tsila field later this year, subject to partner and Government approval".

Ends

For further information, please contact:

Petroceltic

Brian O'Cathain Chief Executive Tel: +353 (1) 421 8300

Alan McGettigan Finance Director

Pelham PR

Philip Dennis Tel: +44 20 7337 1516 

Klara Kaczmarek Tel: +44 20 7337 1524

Murray Consultants

Joe Murray Tel: +353 (1) 4980300

Davy

Hugh McCutcheon Tel: +353 1 6796363

John Frain

Fabrice Toussaint, Head of Petroleum Engineering, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Mr. Toussaint holds a Diploma in Engineering from the Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, and has over 17 years experience in oil & gas exploration and production. He is a member of the Society of Petroleum Engineers.

Notes to Editors:

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's IEX Market. The Company has exploration and appraisal assets in AlgeriaTunisia and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQFLFFBFFLBBX
Date   Source Headline
2nd Nov 20107:00 amRNSDirectorate Change
28th Oct 20103:45 pmRNSHolding(s) in Company
12th Oct 20108:36 amRNSOperational Update
6th Oct 20105:08 pmRNSHolding(s) in Company
27th Sep 20101:41 pmRNSHolding in Company
14th Sep 20107:00 amRNSInterim Results & Operational Update
3rd Aug 20107:00 amRNSOperational Update - Tunisia
26th Jul 20107:00 amRNSAlgeria Rig Contract
20th Jul 20107:10 amRNSItalian Update
20th Jul 20107:00 amRNSTunisian Well Spud
13th Jul 20104:16 pmRNSHolding(s) in Company
1st Jul 20103:49 pmRNSItalian Update
29th Jun 20105:05 pmRNSHolding(s) in Company
29th Jun 20105:00 pmRNSDocument Availability
21st Jun 20104:40 pmRNSSecond Price Monitoring Extn
21st Jun 20104:35 pmRNSPrice Monitoring Extension
1st Jun 20105:59 pmRNSResult of AGM
1st Jun 201012:00 pmRNSAGM Statement
1st Jun 20107:00 amRNSItalian Farm Out
26th May 20104:40 pmRNSSecond Price Monitoring Extn
26th May 20104:35 pmRNSPrice Monitoring Extension
14th May 20105:14 pmRNSHolding(s) in Company
14th May 20105:14 pmRNSHolding(s) in Company
11th May 20107:00 amRNSESM Notice
5th May 20106:06 pmRNSExercise of Options
5th May 20107:00 amRNSDirectorate Change
30th Apr 20104:45 pmRNSHolding(s) in Company
28th Apr 20104:57 pmRNSHolding(s) in Company
28th Apr 20107:00 amRNSFinal Results
23rd Apr 20107:00 amRNSIEX Notice
21st Apr 20102:04 pmRNSResult of EGM
21st Apr 201010:32 amRNSChange of Registered Address
12th Apr 20105:56 pmRNSHolding(s) in Company
6th Apr 201012:00 pmRNSAlgerian PSC Extension
29th Mar 20105:28 pmRNSDocument Availability
29th Mar 20107:00 amRNS$120m Placing
4th Mar 20107:00 amRNSOperational Update
2nd Feb 20107:00 amRNSAlgerian Drilling Update - INW2
20th Jan 20105:46 pmRNSHolding(s) in Company
19th Jan 20105:13 pmRNSHolding(s) in Company
18th Jan 20105:31 pmRNSHolding(s) in Company
18th Jan 20107:00 amRNSPlacing of Iberdrola Shareholding
12th Jan 20107:00 amRNSOperational Update
5th Jan 20107:00 amRNSBoard Changes
4th Jan 20103:52 pmRNSHolding(s) in Company
30th Dec 20097:00 amRNSIEX Notice
22nd Dec 20099:50 amRNSIssue of Equity
17th Dec 20097:00 amRNSItalian Farm-in Agreement
7th Dec 20097:00 amRNSAlgerian Drilling Update AT-2
17th Nov 20097:00 amRNSAlgerian Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.