Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algerian Drilling Update

17 Nov 2009 07:00

RNS Number : 6036C
Petroceltic International PLC
17 November 2009
 



Dublin

17th November 2009

Petroceltic International plc

Successful well test at well INE-2 on the ISAS structure, Isarene Block, Algeria

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa and the Mediterranean, in association with its partner Sonatrach, the Algerian National Oil & Gas Company is pleased to announce that well testing of the Objective Devonian F2 formation at well INE-2 has been successful, with a gas well test rate of 4 million standard cubic feet per day ("MMscf/d") (4,720 cubic metres/hour) with a flowing wellhead pressure of 180 PSI on a 1' choke setting. This flow rate was achieved without the benefit of fracture stimulation which proved successful in testing on the AT-1 well.

The ISAS is a separate structure in the same area of the Ilizi basin as the Ain Tsila ridge discovery announced recently. ISAS has been identified as a significant gas bearing structure in its own right for some time. INE-2 is the third well on the ISAS structure to flow gas at 4mmscfd or more. Well INE-1 flowed at 4.4mmscfd while another earlier well, TMZ-1 tested at 4.1mmscfd. A further well on the structure, GTT-1, tested oil at rates of 490 barrels per day.  A joint technical study undertaken with the operator of the adjacent block 226 in 2007 concluded that at the F2 level the structure extended into both blocks, across a distance of 20km north to south. 

Well INE-2 was the commencement well of the current drilling campaign on the Isarene permit (Blocks 228 & 229a), in the Illizi basin. The well was drilled to a total depth of 1020m in June 2009targeting the Devonian F2 sands in the ISAS structure. Testing of this well has now been completed. Following perforation of a 5 metre interval in the objective Devonian formation, the following flow rates and Flowing Well Head Pressures ("FWHP") were recorded.

Choke

setting Gas rate FWHP

64ths" MMscf/d PSIG*

64  4.0 180

32 3.2 561

 

*PSIG: Pounds per Square Inch Gauge

Testing and sampling operations at the INE-2 well have now concluded and the well testing crew is moving to flow test well AT-2. Well INE-2 has been completed for possible future use as a production well.

The INE-2 well is the second successful well in the current drilling programme, and it demonstrates the potential of the shallow, Devonian objective in this part of the Isarene block. The well was drilled by Petroceltic (75% interest, Operator) in association with the Algerian oil & gas company Sonatrach (25% Interest). In accordance with the provisions of the Isarene Production Sharing Contract, a declaration of discovery for this accumulation has been submitted to Sonatrach.

Independent of the well testing programme, the drilling rig is drilling ahead at the AT-3 location, which is approximately 9 km south of the AT-2 location, to continue the appraisal of the Ain Tsila Ridge structure. The testing of well AT-2 is about to commence in parallel with the drilling of AT-3.

Brian O'Cathain, Chief Executive of Petroceltic, commented: 

"This is the first well test which we have had on the secondary Devonian Objective on the Isarene block since our successful two well drilling campaign in 2006. We are pleased that this well has demonstrated a commercial flow rate at this location. This additional discovery on the block is helpful in adding to the hydrocarbon inventory proved as potentially commercial on the licence. It forms a separate shallower accumulation to the previously announced AT-1 Ordovician discovery. We expect to delineate both Devonian discoveries (INE-2 and HTT-2) and the deeper Ordovician discovery at AT-1 in the next phase of the Production Sharing Contract".

Ends

For further information, please contact:

Petroceltic

Brian O'Cathain Chief Executive Tel: +353 (1) 421 8300

Alan McGettigan Finance Director

Pelham PR

Philip Dennis Tel: +44 20 7337 1516 

Klara Kaczmarek Tel: +44 20 7337 1524

Murray Consultants

Joe Murray Tel: +353 (1) 4980300

Davy

Hugh McCutcheon Tel: +353 1 6796363

John Frain

Fabrice Toussaint, Head of Petroleum Engineering, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Mr. Toussaint holds a Diploma in Engineering from the Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, and has over 17 years experience in oil & gas exploration and production. He is a member of the Society of Petroleum Engineers.

Notes to Editors:

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Sock Exchange's IEX Market. The Company has exploration and appraisal assets in AlgeriaTunisia and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUNAURKVRAAUA
Date   Source Headline
1st Feb 201611:42 amRNSISE Only - Petroceltic Intnl
29th Jan 20165:26 pmRNSSenior Bank Facility Update
29th Jan 20164:41 pmRNSSecond Price Monitoring Extn
29th Jan 20164:35 pmRNSPrice Monitoring Extension
29th Jan 201611:24 amRNSISE Only - Petroceltic Intnl
28th Jan 201611:42 amRNSISE Only - Petroceltic Intnl
27th Jan 20163:13 pmRNSForm 8.3 - Petroceltic plc
27th Jan 201611:47 amRNSISE Only - Petroceltic Intnl
26th Jan 20164:40 pmRNSSecond Price Monitoring Extn
26th Jan 20164:35 pmRNSPrice Monitoring Extension
26th Jan 201611:31 amRNSISE Only - Petroceltic Intnl
25th Jan 201610:59 amRNSISE Only - Petroceltic Intnl 38.5 BAML
22nd Jan 201611:31 amRNSISE Only - Petroceltic 38.5 A
22nd Jan 201610:00 amRNSStatement regarding a possible offer
21st Jan 201611:09 amRNSISE Only - Petroceltic 38.5 A
20th Jan 20164:40 pmRNSSecond Price Monitoring Extn
20th Jan 20164:35 pmRNSPrice Monitoring Extension
20th Jan 201611:18 amRNSISE Only - Petroceltic 38.5 A
19th Jan 201610:15 amRNSISE Only - Petroceltic 38.5 A
18th Jan 20164:40 pmRNSSecond Price Monitoring Extn
18th Jan 20164:35 pmRNSPrice Monitoring Extension
18th Jan 201612:20 pmRNSISE Only - Form 38.5
18th Jan 20167:00 amRNSSenior Bank Facility Update
15th Jan 201611:18 amRNSISE Only - 38.5 A Petroceltic
14th Jan 201611:32 amRNSISE Only - 38.5 A Petroceltic
13th Jan 201612:08 pmRNSISE Only - 38.5 A Petroceltic
12th Jan 20165:05 pmRNSISE Only - Petroceltic INTL 38.5 A
12th Jan 201611:57 amRNSISE Only - Petroceltic Intl PLC 38.5 A BAML
12th Jan 20167:00 amRNSISE Only - 38.5 Petroceltic - Amendment
11th Jan 201611:16 amRNSISE Only - Petroceltic International PLC 38.5 A
8th Jan 20163:08 pmRNSForm 8.3 - Petroceltic International PLC
8th Jan 201611:31 amRNSISE Only - 38.5 Petroceltic
8th Jan 20169:48 amRNSForm 38.5a Petroceltic International Plc
7th Jan 201611:50 amRNSISE Only - 38.5 Petroceltic
7th Jan 20169:26 amRNSForm 38.5a Petroceltic International Plc
6th Jan 201611:24 amRNSISE Only - Petroceltic International PLC 38.5 A
6th Jan 201610:49 amRNSForm 38.5 Petroceltic International Plc
5th Jan 201612:21 pmRNSISE Only - Petroceltic International
31st Dec 201511:04 amRNSISE Only - Petroceltic
30th Dec 201511:52 amRNSISE Only - 38.5 Petroceltic
29th Dec 201510:07 amRNSISE Only - 38.5 Petroceltic
24th Dec 201512:40 pmRNSSecond Price Monitoring Extn
24th Dec 201512:35 pmRNSPrice Monitoring Extension
23rd Dec 20155:24 pmRNSOperational / Financing Update & Strategic Review
16th Dec 20154:35 pmRNSPrice Monitoring Extension
15th Dec 20154:40 pmRNSSecond Price Monitoring Extn
15th Dec 20154:35 pmRNSPrice Monitoring Extension
16th Nov 20154:40 pmRNSSecond Price Monitoring Extn
16th Nov 20154:35 pmRNSPrice Monitoring Extension
13th Nov 20154:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.