Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algerian Drilling Update

17 Nov 2009 07:00

RNS Number : 6036C
Petroceltic International PLC
17 November 2009
 



Dublin

17th November 2009

Petroceltic International plc

Successful well test at well INE-2 on the ISAS structure, Isarene Block, Algeria

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa and the Mediterranean, in association with its partner Sonatrach, the Algerian National Oil & Gas Company is pleased to announce that well testing of the Objective Devonian F2 formation at well INE-2 has been successful, with a gas well test rate of 4 million standard cubic feet per day ("MMscf/d") (4,720 cubic metres/hour) with a flowing wellhead pressure of 180 PSI on a 1' choke setting. This flow rate was achieved without the benefit of fracture stimulation which proved successful in testing on the AT-1 well.

The ISAS is a separate structure in the same area of the Ilizi basin as the Ain Tsila ridge discovery announced recently. ISAS has been identified as a significant gas bearing structure in its own right for some time. INE-2 is the third well on the ISAS structure to flow gas at 4mmscfd or more. Well INE-1 flowed at 4.4mmscfd while another earlier well, TMZ-1 tested at 4.1mmscfd. A further well on the structure, GTT-1, tested oil at rates of 490 barrels per day.  A joint technical study undertaken with the operator of the adjacent block 226 in 2007 concluded that at the F2 level the structure extended into both blocks, across a distance of 20km north to south. 

Well INE-2 was the commencement well of the current drilling campaign on the Isarene permit (Blocks 228 & 229a), in the Illizi basin. The well was drilled to a total depth of 1020m in June 2009targeting the Devonian F2 sands in the ISAS structure. Testing of this well has now been completed. Following perforation of a 5 metre interval in the objective Devonian formation, the following flow rates and Flowing Well Head Pressures ("FWHP") were recorded.

Choke

setting Gas rate FWHP

64ths" MMscf/d PSIG*

64  4.0 180

32 3.2 561

 

*PSIG: Pounds per Square Inch Gauge

Testing and sampling operations at the INE-2 well have now concluded and the well testing crew is moving to flow test well AT-2. Well INE-2 has been completed for possible future use as a production well.

The INE-2 well is the second successful well in the current drilling programme, and it demonstrates the potential of the shallow, Devonian objective in this part of the Isarene block. The well was drilled by Petroceltic (75% interest, Operator) in association with the Algerian oil & gas company Sonatrach (25% Interest). In accordance with the provisions of the Isarene Production Sharing Contract, a declaration of discovery for this accumulation has been submitted to Sonatrach.

Independent of the well testing programme, the drilling rig is drilling ahead at the AT-3 location, which is approximately 9 km south of the AT-2 location, to continue the appraisal of the Ain Tsila Ridge structure. The testing of well AT-2 is about to commence in parallel with the drilling of AT-3.

Brian O'Cathain, Chief Executive of Petroceltic, commented: 

"This is the first well test which we have had on the secondary Devonian Objective on the Isarene block since our successful two well drilling campaign in 2006. We are pleased that this well has demonstrated a commercial flow rate at this location. This additional discovery on the block is helpful in adding to the hydrocarbon inventory proved as potentially commercial on the licence. It forms a separate shallower accumulation to the previously announced AT-1 Ordovician discovery. We expect to delineate both Devonian discoveries (INE-2 and HTT-2) and the deeper Ordovician discovery at AT-1 in the next phase of the Production Sharing Contract".

Ends

For further information, please contact:

Petroceltic

Brian O'Cathain Chief Executive Tel: +353 (1) 421 8300

Alan McGettigan Finance Director

Pelham PR

Philip Dennis Tel: +44 20 7337 1516 

Klara Kaczmarek Tel: +44 20 7337 1524

Murray Consultants

Joe Murray Tel: +353 (1) 4980300

Davy

Hugh McCutcheon Tel: +353 1 6796363

John Frain

Fabrice Toussaint, Head of Petroleum Engineering, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Mr. Toussaint holds a Diploma in Engineering from the Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, and has over 17 years experience in oil & gas exploration and production. He is a member of the Society of Petroleum Engineers.

Notes to Editors:

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Sock Exchange's IEX Market. The Company has exploration and appraisal assets in AlgeriaTunisia and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUNAURKVRAAUA
Date   Source Headline
23rd Jul 20087:00 amRNSAlgerian Exploration Licencin
7th Jul 20082:28 pmRNSHolding in Company
4th Jul 20087:00 amRNSIEX Notice
2nd Jul 20087:00 amRNSItalian Permit Award
1st Jul 20084:06 pmRNSHolding(s) in Company
30th Jun 20087:00 amRNSFinal Results
30th Jun 20087:00 amRNSPlacing and Strategic Allianc
12th Jun 20089:28 amRNSChange of Registered Address
28th May 20084:41 pmRNSSecond Price Monitoring Extn
28th May 20084:35 pmRNSPrice Monitoring Extension
14th May 20087:00 amRNSOperational Update
18th Mar 20082:19 pmRNSHolding(s) in Company
12th Feb 20082:20 pmRNSHolding(s) in Company
8th Jan 20084:35 pmRNSPrice Monitoring Extension
8th Jan 20087:00 amRNSOperational Update
5th Dec 20079:47 amRNSHolding(s) in Company
3rd Dec 20074:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20074:35 pmRNSPrice Monitoring Extension
12th Nov 200710:22 amRNSHolding(s) in Company
5th Nov 20077:01 amRNSDirector/PDMR Shareholding
15th Oct 20078:28 amRNSItalian Licence Acquisition
2nd Oct 20073:24 pmRNSHolding(s) in Company
26th Sep 20077:02 amRNSInterim Results and Update
6th Sep 20077:01 amRNSItaly Update
20th Aug 20072:22 pmRNSHolding(s) in Company
17th Aug 20078:52 amRNSAIM Rule 26
13th Aug 200712:42 pmRNSHolding(s) in Company
1st Aug 200710:38 amRNSHolding(s) in Company
31st Jul 20072:36 pmRNSResult of AGM
16th Jul 20075:08 pmRNSDocument Availability
26th Jun 20075:00 pmRNSAnnual Report and Accounts
25th Jun 20073:48 pmRNSDirector/PDMR Shareholding
21st Jun 20077:01 amRNSAppt of Non-Exec Director
21st Jun 20077:00 amRNSFinal Results
8th May 200710:00 amRNSFurther re Director's Appt
24th Apr 20077:02 amRNSDirectorate Change
16th Apr 20077:01 amRNSItalian Operations Update
11th Apr 20073:29 pmRNSHolding(s) in Company
21st Mar 20071:40 pmRNSHolding(s) in Company
14th Mar 20072:57 pmRNSHolding(s) in Company
6th Feb 20073:50 pmRNSHolding(s) in Company
30th Jan 20079:20 amRNSHolding(s) in Company
29th Jan 20077:01 amRNSOperational Update
19th Jan 20073:34 pmRNSHolding(s) in Company
18th Jan 20072:09 pmRNSHolding(s) in Company
12th Jan 20072:41 pmRNSHolding in Company
18th Dec 20063:04 pmRNSHolding(s) in Company
18th Dec 20067:02 amRNSDrilling Update
11th Dec 20064:33 pmRNSHolding(s) in Company
6th Dec 20067:01 amRNSOperations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.