If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algerian Drilling Update

20 Oct 2009 07:00

RNS Number : 0484B
Petroceltic International PLC
20 October 2009
 



 

Petroceltic International plc

Substantially increased flow rates from AT-1 well test post fracture stimulation

Gas column in excess of 100 meters encountered in AT-2

AT-3 well brought forward

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa and the Mediterranean, in association with its partner Sonatrach, the Algerian National Oil & Gas Company is pleased to announce that:

Continued testing on well AT-1, on the Isarene permit (Blocks 228 & 229a), Algeria, following fracture stimulation ("fracturing") has resulted in flow rates increasing substantially from those previously reported, to a maximum of 33.78 mmscf/d*.

Drilling on the AT-2 well has logged a gas column in excess of 100 metres. The Company plans to test the AT-2 well following completion of testing on the INE-2 well drilled earlier this year. 

Scheduling for the drilling for the AT-3 well to delineate further the significant commercial potential of the Isarene permit has been brought forward. 

Analysis of the pressure build up data from the original AT-1 well test suggested that well performance had been hampered by seepage of drilling materials into the objective reservoir during the drilling process. Mechanical fracturing of the Ordovician (Unit IV) reservoir was therefore used to bypass the zone impacted by drilling materials to obtain a more accurate analysis of the well's potential

The pre and post fracture gas flow rates from the well are summarised below at the following Flowing Well Head Pressures ("FWHP").

Choke Pre-Fracture Stimulation Post Fracture Stimulation 

setting Gas rate FWHP Gas rate FWHP

64ths" MMscf/d* PSIG** MMscf/d* PSIG**

128 11.40 205 NA NA

80 NA NA 33.78 1,464

48 9.94 897 21.96 2,025

32 7.75 1,458 12.14 2,295

*MMscf/d: Million Standard Cubic Feet per Day of gas 

**PSIG: Pounds per Square Inch Gauge

At a flow rate of 33.78 mmscf/d, the wellhead pressure was 1,464 PSIG on a 80/64" choke setting, and at a rate of 12.14 mmscf/d,  well head pressure was 2,295 PSIG on a 32/64" choke setting. 

The maximum flow rate from the well was constrained by the pressure and volume rating of the well testing equipment available in the field, due to flow rates being in excess of expectations. Engineering estimates suggest that this well would be capable of flowing at rates in excess of 40 mmscf/d gas on a 2" (or 128/64") choke setting if adequate surface testing facilities had been available.

Testing and sampling operations at the AT-1 well have now been completed and the well testing crew is now moving to flow test well INE-2. Well AT-1 has been completed for possible future use as a production well.

The AT-1 well is the second well in the current drilling programme on the Isarene permit in the Illizi basin, Algeria. This successful post fracturing test demonstrates the potential of this process to enhance productivity in Ordovician reservoirs and further underscores the high gas potential of the Ain Tsila ridge discovery at this location. The well was drilled by Petroceltic (75% interest, Operator) in association with the Algerian Oil & Gas Company Sonatrach (25% Interest).

The AT-2 well, the second on the Ain Tsila field, has now completed drilling, and a liner has been set over the objective Ordovician formation. A gas column of in excess of 100 metres was logged and formation pressure measurements indicated that the gas observed at this location was in the same pressure regime as the gas in well AT-1.

The drilling rig will now move to the AT-3 location, which is approximately 9 km south of the AT-2 location, to continue the exploration of the Ain Tsila Ridge structure.

Brian O'Cathain, Chief Executive of Petroceltic, commented: 

"The updated AT-1 result is exciting, with substantially higher flow rates that confirm the significant commercial potential of the Isarene permit to Petroceltic and our partner Sonatrach. The additional testing has given us a more accurate picture of the flow potential of this area of the Ain Tsila Ridge structure. We are also greatly encouraged by the logging of a 100 metre gas column in the AT-2 well and look forward to testing this in the near future. We have rescheduled our drilling programme, bringing the AT-3 well forward, to delineate further the extent of this potentially large discovery."

Ends

For further information, please contact:

Petroceltic

Brian O'Cathain Chief Executive Tel: +353 (1) 421 8300

Alan McGettigan Finance Director

Pelham PR

Philip Dennis Tel: +44 20 7337 1516 

Klara Kaczmarek Tel: +44 20 7337 1524

Murray Consultants

Joe Murray Tel: +353 (1) 4980300

Davy

Hugh McCutcheon Tel: +353 1 6796363

John Frain

Fabrice Toussaint, Head of Petroleum Engineering, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Mr. Toussaint holds a Diploma in Engineering from the Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, and has over 17 years experience in oil & gas exploration and production. He is a member of the Society of Petroleum Engineers.

Notes to Editors:

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Sock Exchange's IEX Market. The Company has exploration and appraisal assets in Algeria, Tunisia and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUKOWRKARRAAA
Date   Source Headline
28th May 20137:00 amRNSUpdate on Share Consolidation and Scheme
24th May 20137:00 amRNSBlack Sea Drilling Update
17th May 20137:00 amRNSProgress on Farm-out of Isarene Permit
7th May 20135:44 pmRNSPosting of Circular & Annual Report - Replacement
7th May 20134:13 pmRNSPosting of Scheme Circular & Annual Report
3rd May 20132:00 pmRNSIntroduction to the Official Lists
22nd Apr 20137:00 amRNSPreliminary Results Announcement
19th Apr 20137:00 amRNSNew Egyptian Exploration Licence Awards
15th Apr 20137:00 amRNSNotice of Results
15th Apr 20137:00 amRNSFinancing Facility
4th Apr 20137:00 amRNSItalian Operational Update
19th Mar 20134:17 pmRNSHolding(s) in Company
26th Feb 20134:47 pmRNSHolding(s) in Company
12th Feb 20134:46 pmRNSHolding(s) in Company
11th Feb 20131:00 pmRNSCapital Markets Day
6th Feb 20137:00 amRNSEgyptian Operational Update
5th Feb 20137:00 amRNSSenior Management Appointment
7th Jan 20137:00 amRNSOperational Update and Guidance
21st Dec 20127:00 amRNSRegulatory Approval - Ain Tsila
7th Dec 20127:00 amRNSItalian Update
28th Nov 20124:03 pmRNSHolding(s) in Company
28th Nov 20127:50 amRNSAppointment of Joint Corporate Broker
23rd Nov 20125:15 pmRNSDirector/PDMR Shareholding
13th Nov 201211:45 amRNSDirector Dealing
9th Nov 20127:00 amRNSAward of Egyptian Licence
8th Nov 20124:41 pmRNSOption Grant
7th Nov 20124:51 pmRNSDirector Dealings
6th Nov 20127:00 amRNSOperations Update
15th Oct 20122:58 pmRNSHolding(s) in Company
15th Oct 20129:57 amRNSDirector Dealing
12th Oct 201211:37 amRNSForm 8.3 - Petroceltic International Plc
11th Oct 20124:40 pmRNSHolding(s) in Company
11th Oct 20123:03 pmRNSDirectors Dealings
11th Oct 201212:01 pmRNSForm 8.5 (EPT/RI)
11th Oct 201211:08 amRNSForm 8.5 (EPT/RI)
11th Oct 20129:15 amRNSForm 8 (DD) - Petroceltic
11th Oct 20128:00 amRNSDelisting of Melrose Resources plc
11th Oct 20127:01 amRNSEnterprise Securities Market Notice
11th Oct 20127:00 amRNSReadmission to AIM and ESM
11th Oct 20127:00 amRNSESM - Cancellation Notice
10th Oct 201212:50 pmRNSScheme effective
10th Oct 201210:00 amRNSForm 8.5 (EPT/RI)
10th Oct 20129:50 amRNSESM Sch 1 Update - Petroceltic International plc
10th Oct 20129:35 amRNSForm 8 (DD) - Petroceltic
9th Oct 20123:32 pmRNSForm 8.3 - Petroceltic International
9th Oct 20122:21 pmBUSForm 8.3 - Petroceltic International PLC
9th Oct 20121:01 pmRNSCourt Sanction of Scheme and Reduction of Capital
9th Oct 201211:44 amRNSForm 8.5 (EPT/RI)
9th Oct 201211:26 amRNSForm 8.5 (EPT/RI)
9th Oct 20129:17 amRNSForm 8 (DD) -Petroceltic

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.