Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algerian Drilling Update AT-2

7 Dec 2009 07:00

RNS Number : 6524D
Petroceltic International PLC
07 December 2009
 



Petroceltic International plc

Well AT-2 successfully flows 4.9 mmscf/d gas from Ordovician 

AT-2 also finds gas in Devonian

Gas column in excess of 80 metres encountered in Well AT-3

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa and the Mediterranean, in association with its partner Sonatrach, the Algerian National Oil & Gas Company is pleased to announce that:

The well test on well AT-2, on the Ain Tsila Field, Isarene permit (Blocks 228 & 229a), Algeria, following fracture stimulation ("fracturing") has resulted in gas flow rates in line with expectations, of 4.9  mmscf/d*. A discovery declaration has been filed with Sonatrach for this well.

Well AT-2 gas pressures indicate that this well is in the same pressure regime as the gas in AT-1 and that AT-2 therefore represents a successful delineation well to the AT-1 gas condensate discovery. It is probable that the Ain Tsila gas condensate discovery therefore extends at least 12km south from AT-1 to the AT-2 location.

AT-2 also logged 4m of gas bearing sandstone in the Devonian F2 horizon. The Company plans to test this shallower gas-bearing interval, using a workover rig, at a later date.

Drilling on the AT-3 well, 9km to the south of AT-2 has now been completed. The well logged a gas column in the Ordovician reservoir in excess of 80 metres. With testing of the AT-2 well completed, the Company plans to test the AT-3 well.

The rig will now move to drill the INW-2 well in the north west of the block, on the Issaouane NW prospect. This well will target both Devonian and Ordovician reservoir objectives.

The post fracture gas flow rates from the AT-2 well are summarised below at the following Flowing Well Head Pressures ("FWHP").

  

Choke Post Fracture Stimulation

setting Gas rate FWHP

64ths" MMscf/d* PSIG**

64 4.9 332

32 4.8 885

*MMscf/d: Million Standard Cubic Feet per Day of gas 

**PSIG: Pounds per Square Inch Gauge

Testing and sampling operations at the AT-2 well have now been completed and the well testing crew is now moving to flow test well AT-3. Well AT-2 has been completed for possible future use as a production well.

The AT-2 well is the third well in the current drilling programme on the Isarene permit in the Illizi basin, Algeria, and the fourth well to successfully test gas at potentially commercial rates drilled by Petroceltic since the block was awarded. This successful well test demonstrates the existence of Ordovician gas reservoirs over 12 km from the AT-1 location to the AT-2 location. 

Gas flow rates at AT-2 are predominantly from the relatively low porosity and permeability matrix sandstone at this location. The fracture stimulation at AT-2 does not appear to have communicated with any natural open fractures at this location. The large volume of information gathered from the well evaluation programme and the subsequent fracture stimulation will be important in optimising any future development of the Ain Tsila discovery. The AT-2 well was drilled by Petroceltic (75% interest, Operator) in association with the Algerian Oil & Gas Company Sonatrach (25% Interest).

Brian O'Cathain, Chief Executive of Petroceltic, commented: 

"Well AT-2 has successfully demonstrated that the Ain Tsila structure contains a large volume of gas in place, with pressure continuity demonstrated from AT-1 to AT-2. It also demonstrated that the lower quality Ordovician sandstone encountered at AT-2, with porosities in the range of 5-10% are capable of flowing gas at commercial rates, even in vertical wells. We are now working to integrate well and seismic data, with a view to optimising future development locations on areas of open fractures and / or higher permeability rock. We are pleased to have successfully logged over 80m of Ordovician gas reservoir at AT-3, and look forward to testing that well in the near future. The drilling rig is now moving to drill the Issaouane NW prospect, in the North West part of this prolific block."

Ends

For further information, please contact:

Petroceltic

Brian O'Cathain Chief Executive Tel: + 353 86 820 7250

Alan McGettigan Finance Director Tel: +353 (1) 421 8300

Pelham PR

Philip Dennis Tel: +44 20 7337 1516 

Klara Kaczmarek Tel: +44 20 7337 1524

Murray Consultants

Joe Murray Tel: +353 (1) 4980300

Davy

Hugh McCutcheon Tel: +353 1 6796363

John Frain

Fabrice Toussaint, Head of Petroleum Engineering, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Mr. Toussaint holds a Diploma in Engineering from the Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, and has over 17 years experience in oil & gas exploration and production. He is a member of the Society of Petroleum Engineers.

Notes to Editors:

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's IEX Market. The Company has exploration and appraisal assets in Algeria, Tunisia and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBIBDDDXGGGCL
Date   Source Headline
23rd Jul 20087:00 amRNSAlgerian Exploration Licencin
7th Jul 20082:28 pmRNSHolding in Company
4th Jul 20087:00 amRNSIEX Notice
2nd Jul 20087:00 amRNSItalian Permit Award
1st Jul 20084:06 pmRNSHolding(s) in Company
30th Jun 20087:00 amRNSFinal Results
30th Jun 20087:00 amRNSPlacing and Strategic Allianc
12th Jun 20089:28 amRNSChange of Registered Address
28th May 20084:41 pmRNSSecond Price Monitoring Extn
28th May 20084:35 pmRNSPrice Monitoring Extension
14th May 20087:00 amRNSOperational Update
18th Mar 20082:19 pmRNSHolding(s) in Company
12th Feb 20082:20 pmRNSHolding(s) in Company
8th Jan 20084:35 pmRNSPrice Monitoring Extension
8th Jan 20087:00 amRNSOperational Update
5th Dec 20079:47 amRNSHolding(s) in Company
3rd Dec 20074:40 pmRNSSecond Price Monitoring Extn
3rd Dec 20074:35 pmRNSPrice Monitoring Extension
12th Nov 200710:22 amRNSHolding(s) in Company
5th Nov 20077:01 amRNSDirector/PDMR Shareholding
15th Oct 20078:28 amRNSItalian Licence Acquisition
2nd Oct 20073:24 pmRNSHolding(s) in Company
26th Sep 20077:02 amRNSInterim Results and Update
6th Sep 20077:01 amRNSItaly Update
20th Aug 20072:22 pmRNSHolding(s) in Company
17th Aug 20078:52 amRNSAIM Rule 26
13th Aug 200712:42 pmRNSHolding(s) in Company
1st Aug 200710:38 amRNSHolding(s) in Company
31st Jul 20072:36 pmRNSResult of AGM
16th Jul 20075:08 pmRNSDocument Availability
26th Jun 20075:00 pmRNSAnnual Report and Accounts
25th Jun 20073:48 pmRNSDirector/PDMR Shareholding
21st Jun 20077:01 amRNSAppt of Non-Exec Director
21st Jun 20077:00 amRNSFinal Results
8th May 200710:00 amRNSFurther re Director's Appt
24th Apr 20077:02 amRNSDirectorate Change
16th Apr 20077:01 amRNSItalian Operations Update
11th Apr 20073:29 pmRNSHolding(s) in Company
21st Mar 20071:40 pmRNSHolding(s) in Company
14th Mar 20072:57 pmRNSHolding(s) in Company
6th Feb 20073:50 pmRNSHolding(s) in Company
30th Jan 20079:20 amRNSHolding(s) in Company
29th Jan 20077:01 amRNSOperational Update
19th Jan 20073:34 pmRNSHolding(s) in Company
18th Jan 20072:09 pmRNSHolding(s) in Company
12th Jan 20072:41 pmRNSHolding in Company
18th Dec 20063:04 pmRNSHolding(s) in Company
18th Dec 20067:02 amRNSDrilling Update
11th Dec 20064:33 pmRNSHolding(s) in Company
6th Dec 20067:01 amRNSOperations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.