If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algeria Operational Update

8 Nov 2011 07:00

RNS Number : 6523R
Petroceltic International PLC
08 November 2011
 



 

 

Petroceltic International plc

Algeria Operational Update

AT-7 Produces 4.9 MMscf/d and AT-9 encounters improved reservoir quality

 

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, is pleased to issue an update on operations at the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria. Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending Algerian authorities approval.

 

Highlights

 

·; AT-7 well flows at 4.9 MMscf/d after fracture stimulation

·; AT-9 successfully encounters improved reservoir quality

 

AT-7 well testing results

The AT-7 well, a vertical well, was drilled approximately 12 km south of the AT-3 well and 15 km west of the AT-6 well to appraise the south western extension of the field. The well has been hydraulically fractured and successfully produced at a gas rate of 4.9 MMscf/d on a 48/64" choke with a well head pressure of 470 psig.

 

Well testing operations are continuing on a series of different choke sizes to assist in characterising the reservoir in this southerly part of the field.

 

AT-9 operational update

 

The AT-9 well is a horizontal appraisal well and is located towards the centre of the Ain Tsila field, 4.3km north east of the AT-2 appraisal well and 7.8km south east of the AT-1 discovery well. Its main objective is to assess the productivity associated with a structural ("pop-up") feature of a different style to those already tested at AT-5 and AT-8, and in an area between two known productive wells (AT-1 and AT-2). It is the 6th and final well in the current appraisal programme. The rig will be released from contract on completion of this well.

 

The well commenced drilling on 12th September and reached its total depth of 2494m on 24th October. A near horizontal section of 415m has been drilled successfully as planned entirely within the upper part of the reservoir. Logging results indicate an uppermost interval of 57m along hole (7.5m vertical thickness) with an average net porosity of 10.6% and a maximum porosity value of 14.5%. There are good indications of natural fractures in the remainder of the horizontal section.

 

Testing with the rigless testing unit will commence during November after completion of testing at the AT-7 well.

Brian O'Cathain, Chief Executive of Petroceltic commented:

 

"We are delighted to have successfully fracture stimulated the AT-7 well. This result confirms that commercial gas rates can be achieved in the south of the field after the mixed results of AT-6.

 

We are very encouraged by the logging results from AT-9, which was drilled on time and within budget, particularly as it extends the presence of this interval of high quality sand, successfully tested in AT-1 and AT-8, further south into the centre of the field. Initial petrophysical evaluation indicates that this is the best quality reservoir encountered in any of the Ain Tsila wells to-date.

 

These results improve our understanding of this field and support the current conceptual Field Development Plan in the Final Discovery Report which we plan to submit to the Algerian competent authorities by the end of January 2012."

 

 

Ends

For further information, please contact:

 

Brian O' Cathain/Tom Hickey, Petroceltic International Tel: +353 (1) 421 8300

Philip Dennis/Rollo Crichton-Stuart,

Pelham Bell Pottinger Tel: +44 (20) 7861 3919

Joe Murray / Joe Heron, Murray Consultants Tel: +353 (1) 4980300

Hugh McCutcheon / John Frain, Davy Tel: +353 (1) 679 6363

 

Dr. Dermot Corcoran, Head of Exploration, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Dr. Corcoran has a B.Sc in Geology, a M.Sc. in Geophysics, and a Masters degree in Business Administration, all from the National University of Ireland, Galway. He also holds a Ph.D in Geology from Trinity College, Dublin. Dr. Corcoran has over 20 years experience in oil & gas exploration and production, and has previously worked at ExxonMobil, the Petrofina Group, and Statoil.

 

Glossary

 

 

Bpd: Barrels per day

Choke setting 64"s: The choke setting in diameter, measured in 64ths of one imperial inch.

MMscf/d: Million standard cubic feet per day

FWHP PSIG: Flowing well head pressure in pounds per square inch (gauge)

TVDSS: True vertical depth sub-sea in metres

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURFSWFAWFFSEEF
Date   Source Headline
12th Nov 20097:00 amRNSIEX Notice
6th Nov 200911:24 amRNSIssue of Equity
20th Oct 20097:00 amRNSAlgerian Drilling Update
29th Sep 20097:00 amRNSInterim Results
23rd Sep 20097:00 amRNSElsa Update
22nd Sep 20097:00 amRNSGas Discovery in Algeria
18th Sep 20095:40 pmRNSHolding(s) in Company
12th Aug 20097:00 amRNSIEX Notice
6th Aug 20094:29 pmRNSIssue of Equity
4th Aug 20097:00 amRNSDrilling Update
15th Jul 20092:59 pmRNSDirector/PDMR Shareholding
16th Jun 20097:00 amRNSAlgeria Drilling Update
12th Jun 20093:32 pmRNSHolding(s) in Company
10th Jun 20094:07 pmRNSHolding(s) in Company
10th Jun 200910:52 amRNSHolding(s) in Company
9th Jun 20097:00 amRNSTunisian Farm Out
8th Jun 20095:54 pmRNSHolding(s) in Company
8th Jun 20097:00 amRNSIEX Notice
3rd Jun 200912:48 pmRNSResult of AGM and Completion of Placing
18th May 20097:00 amRNSAlgerian Operations Update
8th May 20092:21 pmRNSDocument Availability
6th May 20097:00 amRNSIEX Notice
30th Apr 20097:00 amRNSFinal Results
30th Apr 20097:00 amRNSUS$40Million Placing
27th Apr 20095:26 pmRNSHolding(s) in Company
22nd Apr 20094:35 pmRNSPrice Monitoring Extension
22nd Apr 20094:35 pmRNSPrice Monitoring Extension
31st Mar 20094:31 pmRNSDirectorate Change
20th Mar 20095:00 pmRNSWell Services Contract
25th Feb 20094:40 pmRNSSecond Price Monitoring Extn
25th Feb 20094:35 pmRNSPrice Monitoring Extension
24th Feb 20097:00 amRNSBoard Changes
10th Feb 200912:46 pmRNSDirectors Dealing
29th Jan 20098:00 amRNSRig Contract Signed for Algerian Drilling
19th Jan 20097:00 amRNSDirector/PDMR Shareholding
1st Dec 20087:00 amRNSDirector/PDMR Shareholding
28th Nov 20087:00 amRNSDoc re. Availability of PCI Corporate presentation
27th Nov 20087:00 amRNSDrilling Report
24th Oct 20084:50 pmRNSSecond Price Monitoring Extn
24th Oct 20084:38 pmRNSPrice Monitoring Extension
17th Oct 20084:36 pmRNSPrice Monitoring Extension
9th Oct 20084:44 pmRNSSecond Price Monitoring Extn
9th Oct 20084:36 pmRNSPrice Monitoring Extension
30th Sep 20081:09 pmRNSDirector/PDMR Shareholding
27th Aug 20085:18 pmRNSGrant of Options
27th Aug 20087:00 amRNSIEX Notice
26th Aug 20087:00 amRNSInterim Results
22nd Aug 20087:00 amRNSPlacing Completed
15th Aug 200811:22 amRNSAppointment of Financial Dire
14th Aug 20085:17 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.