Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Ain Tsila Update

19 Aug 2015 07:00

RNS Number : 4111W
Petroceltic International PLC
19 August 2015
 

 

Dublin

19 August 2015

Petroceltic International Plc

 

Update on Ain Tsila Development Project EPC Contract Tender process

Petroceltic International plc (AIM: PCI) ("Petroceltic"), the oil and gas production, development and exploration company focused on North Africa, the Mediterranean and Black Sea regions, is pleased to announce the launch of an invitation to tender for the provision of Engineering, Procurement and Construction ("EPC") services in respect of the Ain Tsila gas and condensate development in Algeria.

 

Groupement Isarene, the joint operating organisation responsible for executing the Ain Tsila field development plan established by Sonatrach (the National Oil and Gas Company of Algeria), Petroceltic and Enel, has completed a pre-qualification process to select a short list of EPC contractors with Algerian experience which would be capable of delivering the Central Gas Processing Facility and associated works envisaged for the Ain Tsila development.

 

Following completion of that process, four companies (or consortia) have been invited by Groupement Isarene to tender for the Ain Tsila EPC contract:

· Daewoo Engineering & Construction Co., Ltd

· GS Engineering Corporation and Dodsal Engineering & Construction PTE Ltd (acting as a consortium)

· JGC Corporation and JGC Algeria S.p.A (acting as a consortium)

· Tecnidas Reunidas SA and Bonatti S.p.A (acting as a consortium)

The scope of work for the EPC contract comprises a central processing facility, an industrial base, an administration/ accommodation base, well gathering system, and product export system. This scope of work is based on the Front End Engineering and Design ("FEED") outputs being generated by Chicago Bridge and Iron ("CBI") Company on behalf of the Groupement. The surface facilities have been designed to process up to 420 million standard cubic feet/day of wet gas, and transport the resultant product streams of dry gas, liquefied petroleum gas ("LPG") and condensate to existing tie-in points in the Algerian national hydrocarbon export infrastructure.

 

Following a technical and commercial evaluation of the offers, it is anticipated that the EPC tender process will complete with an award recommendation targeted for year end 2015, with first Ain Tsila gas export scheduled for 2018.

 

The approved Ain Tsila plan of development envisages the production of gross reserves of 2.1 Trillion Cubic Feet of sales gas, 67 million barrels of condensate and 108 million barrels of LPG extracted from an annual average wet gas plateau rate of 355 million standard cubic feet/ day. Development drilling is due to start in Q4 2015 with a newly built rig, contracted from Sinopec, which is currently en route to Algeria. Up to 24 new wells will be drilled and 6 existing wells recompleted prior to first gas, with a production plateau of 14 years maintained by further drilling.

 

Petroceltic holds a 38.25% interest, Sonatrach a 43.375% interest, and Enel an 18.375% interest in the Isarene PSC. Petroceltic continues to benefit from a carry of its development costs in respect of Ain Tsila following the completion of the sale of an 18.375% interest to Sonatrach in July 2014.

 

Commenting on the update, Brian O'Cathain, CEO of Petroceltic said:

 

"We are delighted to see the continued solid progress of the Ain Tsila project towards the EPC contract award, and onwards towards first gas in 2018. The anticipated award of the EPC to an EPC contractor with significant Algeria experience will be a major milestone in de-risking that schedule."

 

 

Ends

 

For further information, please contact:

 

Brian O' Cathain /Tom Hickey, Petroceltic International Tel: +353 (1) 421 8300

James Henderson / Rollo Crichton-Stuart, Bell Pottinger Tel: +44 (20) 3772 2500

Douglas Keatinge / Joe Heron, Murray Consultants Tel: +353 (1) 498 0300

John Frain / Roland French, Davy Tel: +353 (1) 679 6363

 

John Naismith, Head of Technical, Petroceltic International plc, and the qualified person as defined in the AIM Note for Mining and Oil and Gas Companies June 2009, has reviewed and approved the technical information contained in this announcement. John holds an MSc in Petroleum Reservoir Engineering from Imperial College London. He has 27 years' experience in the oil and gas industry gained with Shell, Enterprise Oil, Canadian Natural Resources and Petroceltic. His experience includes reservoir engineering, integrated subsurface studies, asset management, commercial and operations.

 

 

Notes to Editors:

 

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on North Africa the Mediterranean and Black Sea Regions, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has production, exploration and development assets in Algeria, Egypt, Bulgaria and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSFEFIAFISELA
Date   Source Headline
15th Jan 20157:00 amRNSOperational Update and Guidance
12th Jan 201512:35 pmRNSChange of Registered Office Address
9th Jan 20151:00 pmRNSRequisition of EGM
15th Dec 201411:00 amRNSHolding(s) in Company
15th Dec 20148:00 amRNSGrant of Awards
12th Dec 20147:03 amRNSLegal Proceedings Issued by Worldview
11th Dec 20145:14 pmRNSNotice of Director Resignation
5th Dec 201410:19 amRNSNotice of Capital Markets Day
4th Dec 20143:10 pmRNSHolding(s) in Company
3rd Dec 201411:54 amRNSForm 38.5 (EPT/RI)
3rd Dec 201410:30 amRNSDirector Dealings
3rd Dec 20147:00 amRNSHolding(s) in Company
2nd Dec 20144:48 pmRNSHolding(s) in Company
2nd Dec 201411:46 amRNSForm 38.5 (EPT/RI)
2nd Dec 20149:26 amRNSForm 38.5(b) Petroceltic International plc
1st Dec 201411:58 amRNSForm 38.5 (EPT/RI)
1st Dec 201411:37 amRNSForm 8.3 - Petroceltic International Plc
1st Dec 201411:26 amRNSISE Only - 38.5a
1st Dec 201411:15 amRNSDirector Dealings
1st Dec 201410:27 amRNSForm 38.5a Petroceltic International Plc
1st Dec 201410:25 amRNSForm 8.3 Petroceltic International Plc
1st Dec 20147:05 amRNSResponse to Dragon Oil Announcement
1st Dec 20147:00 amRNSNo intention to make an offer
28th Nov 201411:50 amRNSForm 38.5 (EPT/RI)
28th Nov 201410:28 amRNSISE Only - 38.5a
28th Nov 201410:27 amRNSForm 8.3 Petroceltic International Plc
28th Nov 201410:25 amRNSForm 38.5a Petroceltic International Plc
28th Nov 20148:44 amRNSForm 38.5(b) Petroceltic International plc
27th Nov 201411:31 amRNSForm 8.3 Petroceltic International Plc
27th Nov 201410:59 amRNSForm 38.5 - Petroceltic International PLC
27th Nov 201410:28 amRNSForm 38.5a Petroceltic International Plc
27th Nov 20149:51 amRNSISE Only - 38.5a
27th Nov 20149:46 amRNSForm 38.5(b) Petroceltic International plc
25th Nov 20141:30 pmRNSIrish Takeover Panel Announcement
25th Nov 201411:02 amRNSISE Only - 38.5a
25th Nov 20149:34 amRNSForm 38.5a Petroceltic International Plc
25th Nov 20149:17 amRNSForm 38.5(b) Petroceltic International plc
24th Nov 201411:25 amRNSISE Only - 38.5a
24th Nov 201411:07 amRNSForm 38.5 (EPT/RI)
24th Nov 201411:00 amRNSForm 38.5(b) Petroceltic International plc
24th Nov 20149:45 amRNSForm 38.5a Petroceltic International Plc
21st Nov 201411:28 amRNSISE Only - 38.5a
21st Nov 201411:19 amRNSForm 38.5 (EPT/RI)
21st Nov 201410:14 amRNSForm 38.5a Petroceltic International Plc
21st Nov 20148:53 amRNSForm 38.5(b) Petroceltic International plc
21st Nov 20148:29 amRNSForm 8.3 - Petroceltic International
20th Nov 20144:03 pmRNSForm 8.3 - Petroceltic International
20th Nov 201410:26 amRNSISE Only - 38.5a
20th Nov 20149:33 amRNSForm 38.5a Petroceltic International Plc
20th Nov 20149:28 amRNSForm 38.5(b) Petroceltic International plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.