Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
13.65    -0.19 (-1.37%)
Bid:
13.80
Ask:
13.96
Spread: 0.16 (1.159%)
Market Cap: £199.00m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update, Alkaid #2 Well

25 Oct 2022 07:00

RNS Number : 9456D
Pantheon Resources PLC
25 October 2022
 

25 October 2022

 

Pantheon Resources plc

Operational Update, Alkaid #2 Well

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM listed oil and gas company with a 100% working interest in all of its oil projects spanning c. 153,000 acres adjacent and near to transportation and pipeline infrastructure on the Alaska North Slope ("ANS"), is pleased to provide the following operational update:

Alkaid #2 - Operational Update

Production testing operations at Alkaid #2 have commenced with the well in the clean-up phase and showing positive early indications of oil production from the reservoir. During this clean-up phase, in addition to the fluid production, the strong flow back has yielded frac sand production higher than expected, which is not uncommon in similar completion procedures.

The Alkaid #2 well is being shut in as part of the planned procedure to transition from temporary flow back facilities to larger permanent facilities, and a coiled tubing unit will be used to clean out the wellbore. Additionally, Pantheon will undertake a pressure build-up operation by placing a pressure "bomb" in the production packer and allowing formation pressure to increase for several days. This will allow for analysis of multiple reservoir parameters and is a standard reservoir engineering analytical tool.

The operations to date have recovered approximately 10% of the frac fluid used, with oil cuts averaging from 8% to 12%. Typically, a better indication of ultimate production performance can be ascertained after recovering over 40% of the frac fluid, which the Company expects to achieve over the coming weeks.

Alkaid #2 has produced initial fluid flow with rates in the thousands of barrels per day, including a strong sand production response which the Company will address to ensure sand is not restricting the wellbore. Pantheon is awaiting delivery of a coiled tubing unit to clean out the well bore prior to recommencement of flow test operations.

Jay Cheatham, CEO, said: "We have seen promising indications of reservoir performance, with oil cuts showing early in the flow back process. Often, the first real indications of oil occur much later. Whilst the production of frac sand is inconvenient, as is the waiting time for obtaining a coiled tubing unit, it is not an uncommon occurrence in multistage fracture stimulation completions in conventional reservoirs and will be dealt with once the unit arrives. We hope to complete our clean-up programme at Alkaid #2 over the next several weeks and we will announce the results of flow testing once complete.

"It is encouraging that the reservoir response to the stimulation procedure has been very good, as we have experienced strong initial fluid flows measured in the thousands of barrels per day. Remember, these are conventional reservoirs that have superior reservoir qualities compared to shales, and given it is our first well completion applying stimulation techniques in these reservoirs it requires a little patience as we better understand our reservoir characteristics on the North Slope.

"Whilst the early data is very encouraging, I reiterate my previous statements that we cannot make a definitive assessment of the ultimate commerciality of the well until flow testing operations have concluded. However, we remain optimistic."

Michael Duncan, VP Operations & Engineering, said: "As our first horizontal well on the North Slope, we are quickly learning how this formation produces and responds to various flow parameters. We are very early in flowback and cleanup with only 10% of frac fluid recovered, yet significantly, we have already seen oil production which is greatly encouraging.

"Prior to entering initial production, it is common practice to clean out a wellbore. We are using a planned outage for tie-in of our permanent facilities to perform a well pressure build up as well as the wellbore clean out. It has been a good operating season thus far, and we eagerly anticipate having a fully operational system soon. The production of frac sand is a nuisance which has cost us some time during the early stages of flowback, however is not believed to change the potential of the well."

 

Glossary

Pressure bomb

A thick-walled container, usually steel, used to hold devices that determine and record pressure or temperature in a wellbore

 

 

-Ends-

 

 

Further information:

 

Pantheon Resources plc

+44 20 7484 5361

Jay Cheatham, CEO

Justin Hondris, Director, Finance and Corporate Development

 

 

Canaccord Genuity plc (Nominated Adviser and broker)

Henry Fitzgerald-O'Connor, James Asensio, Gordon Hamilton

+44 20 7523 8000

 

BlytheRay

Tim Blythe, Megan Ray, Madeleine Gordon-Foxwell

+44 20 7138 3204

 

 

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector. 

 

Notes to Editors

Pantheon Resources plc is an AIM listed Oil & Gas company focused on several large projects located on the North Slope of Alaska ("ANS"), onshore USA where it has a 100% working interest in 153,000 highly prospective acres with potential for multi billion barrels of oil recoverable. A major differentiator to other ANS projects is its close proximity to transport and pipeline infrastructure which offers a significant competitive advantage to Pantheon, allowing for materially lower capital costs and much quicker development times. The Group's stated objective is to create material value for its stakeholders through oil exploration, appraisal and development activities in high impact, highly prospective conventional assets, in the USA; a highly established region for energy production with infrastructure, skilled personnel and low sovereign risk. All operations are onshore USA, with drilling costs materially below that of offshore wells.

 

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) incorporated into, or forms part of, this announcement. The information contained within this announcement is considered to be inside information prior to its release.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDBKQBPFBDDPKB
Date   Source Headline
30th Dec 20227:00 amRNSOperational update
30th Dec 20227:00 amRNSFinal Results for the Year Ended 30 June 2022
14th Dec 20225:00 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
8th Dec 20227:00 amRNSReservoir modelling report from Schlumberger
18th Nov 20221:22 pmRNSBlock Listing Six Monthly Return
10th Nov 20227:00 amRNSAcquisition of Key Leases & Operational Update
25th Oct 20227:00 amRNSOperational Update, Alkaid #2 Well
3rd Oct 20224:22 pmRNSTotal Voting Rights
26th Sep 20227:00 amRNSOperational Update, Alkaid #2 Well
20th Sep 20227:00 amRNSDirector/PDMR Notification
13th Sep 20221:21 pmRNSQuarterly Repayment of Unsecured Convertible Bonds
7th Sep 20222:30 pmRNSPantheon Graduates to the OTCQX Best Market
6th Sep 20227:00 amRNSOperational and Corporate Update
23rd Aug 20222:36 pmRNSReplacement Theta West #1 – Independent VAS Report
23rd Aug 20227:00 amRNSTheta West #1 Well – Independent Expert VAS Report
18th Aug 20227:00 amRNSOperational Update, Alkaid #2 Well
29th Jul 20227:00 amRNSOperational Update, Alkaid #2 Well
7th Jul 20227:00 amRNSSpudding of Alkaid #2 Well
28th Jun 20227:00 amRNSTR-1: Notification of major holdings
14th Jun 202210:34 amRNSQuarterly Repayment of Unsecured Convertible Bonds
31st May 20221:10 pmRNSTotal Voting Rights
18th May 20229:53 amRNSBlock Listing Application to AIM
16th May 20227:00 amRNSRig Contract Executed & Investor Presentation
4th May 20227:00 amRNSPartial Conversion of Unsecured Convertible Bonds
25th Apr 20227:00 amRNSResource Upgrade
20th Apr 20227:00 amRNSUpcoming Webinar – Registration Details
6th Apr 202210:01 amRNSConfirmation of Upcoming Webinar
5th Apr 20225:58 pmRNSTR-1: Notification of major holdings
31st Mar 20227:00 amRNSInterim Results for Six Months Ended 31/12/21
24th Mar 20227:00 amRNSTheta West #1 Testing Update
15th Mar 20227:00 amRNSIssue of Equity
9th Mar 20229:35 amRNSQuarterly Repayment of Unsecured Convertible Bonds
4th Mar 20222:14 pmRNSConversion of Shares
4th Mar 20227:00 amRNSOperations Update
21st Feb 20227:00 amRNSOperational Update
18th Feb 20227:00 amRNSPartial Conversion of Unsecured Convertible Bonds
15th Feb 20227:00 amRNSTheta West #1 Operational Update
7th Feb 20227:00 amRNSTalitha #A Testing Update
24th Jan 20224:53 pmRNSWebinar
24th Jan 202212:17 pmRNSResult of AGM
24th Jan 20227:00 amRNSSpudding of Theta West #1 Well & Operations Update
20th Jan 20227:00 amRNSExercise of Warrants
19th Jan 20227:02 amRNSAnnual Grant of Share Options to Directors & Staff
19th Jan 20227:00 amRNSDirector/PDMR Notification
13th Jan 20227:00 amRNSIssue of Equity & Exercise of Share Options
12th Jan 20229:10 amRNSTheta West Drilling Permit Approval & AGM Webinar
7th Jan 202212:05 pmRNSAnnual General Meeting & Covid Precautions
6th Jan 20227:00 amRNSOperations Update
4th Jan 20227:00 amRNSTR-1: Notification of major holdings
17th Dec 20219:23 amRNSTR-1: Notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.