Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPanther Metals Regulatory News (PALM)

Share Price Information for Panther Metals (PALM)

Share Price is delayed by 15 minutes
Get Live Data
162.50    15.50 (10.54%)
Bid:
160.00
Ask:
165.00
Spread: 5.00 (3.125%)
Market Cap: £14.14m
PALM Live PriceLast checked at - London Stock Exchange

Intraday Panther Metals Share Chart

Drilling Commenced at Dotted Lake

23 Sep 2021 09:30

RNS Number : 7522M
Panther Metals PLC
23 September 2021
 

NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR INTO AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA, THE UNITED STATES OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH JURISDICTION.

 

FOR IMMEDIATE RELEASE

 

PANTHER METALS PLC

("Panther" or the "Company")

(Incorporated in the Isle of Man with company number 009753V)

 23rd September 2021

 

 

Dotted Lake - Commencement of Drilling

 

Panther Metals PLC (LSE:PALM) the company focused on mineral exploration in Canada and Australia, is pleased to announce all necessary drilling equipment has been mobilised to our 100% owned Dotted Lake property in Ontario, Canada. It is expected the drill hole collar will be set on Thursday morning, with core drilling of the planned 400m deep hole following on immediately.

Darren Hazelwood, Chief Executive Officer, commented:

 

"This represents a milestone for Panther Metals and our shareholders as we commence drilling at Dotted Lake. Our drive for exploration success is now in full flow with a busy autumn ahead, not only drilling at Dotted Lake, but also a considerable programme planned and financed at Wishbone, on the Obonga Greenstone Belt.

I look forward to updating the market as our projects advance at the earliest opportunity".

 

Drilling Programme Details

The planned drilling at Dotted Lake consists of a single NQ (47.6mm) core diameter hole (PD-DL21-01) planned at 400m deep, inclined 45 degrees and orientated directly below a 147 m long, average 2m deep, historical trench (Tr-10-4 ) excavated during 2010 by a previous claim holder.

The Epiroc C5C Track Diamond Drill rig being utilised will be operated on a single 12 hour shift per day basis under contract with Niigaani Drilling Inc. Niigaani are a north western Ontario indigenous drilling company based in Thunder Bay.

The purpose of the drill hole is to investigate the stratigraphy in the vicinity of interpreted sheared felsic/ultramafic intrusive contacts, whilst testing for the vertical extensions of shear hosted gold mineralisation seen in surface trenching.

The historical trench TR-10-4 which is orientated broadly north-south, was constructed to investigate gold in soil anomalies (up to 0.484ppm Au) from earlier soil sampling in 2008. Tr-10-4 intersected two narrow shear zones containing mineralised granodiorite with up to 10% pyrite, strong sericite alteration and localised quartz eyes. Limited channel sampling in the sheared section yielded two significant channel samples including 9.02g/t Au & 859ppm Zn over 0.40m and 1.14g/t Au over 1.00m. Significantly significant portions of the trench in the area around the two mineralised samples were unable to be channel sampled due to the intense shearing and associated deep weathering. An additional 2010 prospecting sample from the area of Tr-10-4 reportedly returned 16.95 g/t Au & 7.7 g/t Ag .

Panther chip sampling within Tr-10-4 (reported 5 November 2020) verified the historical mineralised intervals returning 18.9g/t Au & 0.94 g/t Ag and 9.37g/t & 1.73 g/t Ag, with a further three of the samples returning low level anomalous gold within the immediate stripped area.

The planned PD-DL21-01 drill hole also coincides with an anomalous magnetic geophysical feature outlined by Panther's airborne magnetic and electromagnetic geophysics (survey the results reported 22 February 2021), at the boundary of an intense magnetic low, mapped as a sheared felsic intrusive pluton (Dotted Lake Batholith) contact, abutting an intense magnetic high interpreted to represent an ultramafic intrusive. Mafic volcanic and metavolcanic rocks of the Hemlo Assemblage outcrop to the north of Tr-10-4 and the current drill pad.

On a wider scale the drilling site sits upon the northern limb of the Schreiber-Hemlo Greenstone belt on the northern edge of the granitoid Dotted Lake Batholith.

 About the Dotted Lake Property

The Dotted Lake property consists of a total of 174 contiguous claims located approximately 18km north-northeast of the Barrick-owned Hemlo Gold Mine, which has produced over 22 million oz of gold over 30 years to date. Located on the northern limb of the Schreiber-Hemlo Greenstone belt the Dotted Lake property covers 7km of the prospective geological contact between the Dotted Lake Batholith plutonic intrusive and mafic volcanic and metavolcanic 'greenstone' rocks.

 

 

 

Panther Metals PLC:

Darren Hazelwood, Chief Executive Officer: +44(0) 1462 429 743

+44(0) 7971 957 685

Mitchell Smith, Chief Operating Officer: +1(604) 209 6678

Broker:

SI Capital Limited

Nick Emerson +44(0) 1438 416 500

 

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word “Reach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAUOUWRAWUKURR
Date   Source Headline
2nd Jun 20267:00 amRNSObonga Project: Awkward Drill Programme Update
1st Jun 20266:22 pmRNSNotice of AGM
1st Jun 20269:46 amRNSExercise of Warrants
26th May 20267:00 amRNSObonga Project: Awkward Drilling Programme Starts
13th May 20267:00 amRNSWinston Tailings Project: Batch 6 Assay Results
11th May 20267:00 amRNSDrilling/Production Report
6th May 20267:00 amRNSObonga Update: Drill Pad Preparation
1st May 20261:30 pmRNSHolding(s) in Company
28th Apr 20267:00 amRNSWinston Tailings Project: Batch 4 Assay Results
20th Apr 20267:00 amRNSAnnual Report and Financial Statements
14th Apr 20267:00 amRNSWinston Tailings Project: Batch 3 Assay Results
2nd Apr 20267:00 amRNSBoard changes, issue of equity
31st Mar 20264:13 pmRNSResult of General Meeting
19th Mar 202610:02 amRNSWinston Tailings Project: Batch 2 Assay Results
17th Mar 20263:13 pmRNSWinston Tailings Project: Batch 1 Assay Results
17th Mar 20267:00 amRNSWinston Tailings Project: Batch 1 Assay Results
16th Mar 20267:00 amRNSWinston Tailings Project: Sample Collection
13th Mar 202611:44 amRNSNotice of General Meeting
27th Feb 20267:00 amRNSObonga Project: Wishbone VMS Update
23rd Feb 20267:00 amRNSDotted Lake Project: Magnesium Recovery Testwork
19th Feb 202611:35 amRNSHolding(s) in Company
19th Feb 20267:00 amRNSWinston Tailings: Traxys Letter of Interest Signed
18th Feb 202612:42 pmRNSHolding(s) in Company
17th Feb 20264:22 pmRNSHolding(s) in Company
17th Feb 20263:38 pmRNSHolding(s) in Company
17th Feb 20263:33 pmRNSHolding(s) in Company
13th Feb 202610:00 amRNSChange of auditor
13th Feb 20267:00 amRNSFiling of Initial CSE Prospectus
10th Feb 20267:00 amRNS-RWinston Tailings Update
9th Feb 20267:00 amRNSStrategic Fundraise
15th Jan 20267:00 amRNSObonga Project: 3 Year Option
7th Jan 20267:00 amRNS-RWinston Tailings Project - Appointment of Extrakt
24th Dec 20257:00 amRNS-R2025 Review of Year
15th Dec 20259:11 amRNSHolding(s) in Company
26th Nov 20257:00 amRNSDirector Appointment
20th Nov 20254:38 pmRNSHolding(s) in Company
20th Nov 20257:00 amRNS-RAppointment of drilling contractor
11th Nov 20253:12 pmRNSHolding(s) in Company
11th Nov 20252:02 pmRNSHolding(s) in Company
11th Nov 20251:53 pmRNSHolding(s) in Company
11th Nov 20251:38 pmRNSHolding(s) in Company
30th Oct 202510:23 amRNS-RPick Lake Option
30th Oct 20257:00 amRNSResults of WRAP Offer
28th Oct 20257:05 amRNSWRAP Retail Offer for up to £100,000
28th Oct 20257:00 amRNSPlacing and Director's Dealing
16th Oct 20257:00 amRNSWinston Project Update
25th Sep 20257:00 amRNSHalf-year Report
22nd Sep 20257:00 amRNS-RWinston: SRK appointed
1st Sep 20257:05 amRNSWinston Tailings Dam Project Update
28th Aug 20259:18 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.