Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOriole Resources Regulatory News (ORR)

Share Price Information for Oriole Resources (ORR)

Share Price is delayed by 15 minutes
Get Live Data
0.36    0.00 (0.00%)
Bid:
0.35
Ask:
0.37
Spread: 0.02 (5.714%)
Market Cap: £17.63m
ORR Live PriceLast checked at - London Stock Exchange

Intraday Oriole Resources Share Chart

Bibemi Phase 5 Drilling Update

12 Sep 2024 07:00

RNS Number : 8604D
Oriole Resources PLC
12 September 2024
 

Oriole Resources PLC 

('Oriole Resources' or 'the Company' or 'the Group')

 

Bibemi Phase 5 Drilling Update

Initial results include near-surface gold bearing intersections of 4.10m at 7.99g/t Au and 2.70m at 14.67g/t Au

 

Oriole Resources PLC (AIM: ORR), the AIM-quoted gold exploration company focussed on West and Central Africa, is pleased to announce an update for its 82.2% owned Bibemi orogenic gold project ('Bibemi' or the 'Project') in Cameroon, where the Company announced an updated Mineral Resource Estimate ('MRE') of 375,000 ounces ('oz') grading 2.30 grammes per tonne ('g/t') gold ('Au') in January of this year. BCM International Limited ('BCM') is currently funding up to US$4 million in exploration expenditure in return for up to a 50% interest in the Project.

Highlights

 

· To date, a total of 2,814.10 metres ('m') has been drilled in 22 holes in the ongoing Phase 5 diamond drilling programme of 7,060m in 62 holes at the Bakassi Zone 1 prospect ('Bakassi Zone 1' or 'BZ1').

· Results from selective sampling of the first 10 vertical holes (BBDD055 - BBDD064) at the BZ1 MRE target ('BZ1-MRE') have delivered multiple intersections as follows:

Hole ID

Interval

From (m)

Width (m)

Grade (g/t Au)

BBDD059

4.10

7.99

16.80

BBDD058

2.70

14.67

45.20

and

4.00

1.37

108.60

BBDD061

2.00

12.50

109.00

BBDD063

2.15

9.95

98.85

and

5.20

0.97

113.60

BBDD060

1.00

8.53

90.10

BBDD055

1.20

5.37

22.40

and

1.00

4.62

114.90

· Several high-grade intersections are within 50m of surface and the footprint of the existing MRE open pit outline but outside of the current MRE wireframes, providing scope for additional near-surface resources.

· A further 15 holes are planned at BZ1-MRE, focussed on expanding and upgrading the existing JORC Inferred MRE.

· 25 holes are also planned at two along-strike target areas, BZ1-NE and BZ1-SW, where exploration to date has generated coincident geochemical and geophysical targets.

· Completion of the programme is anticipated in Q4 2024.

 

Chief Executive Officer of Oriole Resources, Martin Rosser, said: "The first tranche of results from the Phase 5 drilling programme have delivered up to 4.10m at 7.99g/t Au close to surface. This supports our belief that there exists the potential to increase the Mineral Resource Estimate tonnes and contained ounces of gold nearer to surface and within the current open pit design. We look forward to reporting the next tranche in due course."

 

 

Figure 1. Best intersections (using a 0.20g/t Au lower cut off) from vertical holes BBDD055 to BBDD064, representing infill and extensional drilling within the BZ1-MRE footprint. Additional holes drilled to date mainly fall within the current pit outline.

 

Further Details

At the Bibemi orogenic gold project (177 square kilometres ('km2') in area) in the North region of Cameroon, the Company's exploration to date has identified shear-hosted gold mineralisation at four main prospects - Bakassi Zone 1, Bakassi Zone 2, Lawa West and Lawa East - within a circa 12 kilometre ('km') long mineralised hydrothermal system at surface. Since Q1 2021, the Company has completed four phases of diamond drilling at the Project for a total of 6,685.40m in 54 holes, with gold mineralisation hosted in both steeply dipping and flatter lying quartz and quartz-tourmaline veins.

 

The majority of that drilling was focussed on a circa 1km section at the southern end of Bakassi Zone 1 and delivered best intersections of 14.80m at 4.27g/t Au and 7.70m at 2.74g/t Au (hole BBDD050), 6.50m at 3.92g/t Au (hole BBDD034), 5.20m at 1.97g/t Au (hole BBDD031), and 9.20m at 1.31 g/t Au (hole BBDD042) (announcements dated 20 December 2021, 9 February 2022 and 15 September 2022). In January 2024, the Company reported an updated MRE for the Bakassi Zone 1 of 5.1 million tonnes grading 2.30g/t Au for approximately 375,000 oz Au contained in the JORC Inferred Resources category, based on a 0.45g/t Au lower cut-off grade and within a US$2,000/oz gold price pit shell (announcement dated 15 January 2024).

 

In June 2024, a fully funded Phase 5 diamond drilling programme commenced at Bakassi Zone 1 for a planned 7,060m in 62 holes. The Company today reports that a total of 22 holes (11 vertical holes, BBDD055 to BBDD065, and 10 inclined holes, BBDD066 to BBDD075 and BBDD051A) have been completed for a total of 2,814.10m at the main BZ1-MRE area. BBDD051A is a re-drill of Phase 4 hole BBDD051, which was previously abandoned at 11m downhole depth due to a technical issue.

As previously reported, multiple shallow-dipping (

Results for these holes have been received and are presented in Table 1 below. Core recovery averages more than 98%.

Table 1. Significant intersections from BBDD055 to BBDD064 from Phase 5 drilling at BZ1-MRE (using a 0.20 g/t Au cut-off grade).

Hole ID

From (m)

To (m)

Au grade (g/t)

Intersection*

BBDD055

22.40

23.60

5.37

1.20m at 5.37g/t Au

and

44.90

46.00

1.15

1.10m at 1.15g/t Au

and

60.60

61.60

0.27

1.00m at 0.27g/t Au

and

97.20

98.40

0.25

1.25m at 0.25g/t Au

and

114.90

115.90

4.62

1.00m at 4.62g/t Au

and

137.60

138.60

0.58

1.00m at 0.58g/t Au

BBDD056

68.40

69.40

0.53

1.00m at 0.53g/t Au

BBDD057

35.30

36.30

0.38

1.00m at 0.38g/t Au

and

76.40

77.50

0.23

1.00m at 0.23g/t Au

and

83.40

84.60

0.20

1.20m at 0.20g/t Au

BBDD058

28.40

29.40

0.23

1.00m at 0.23 g/t Au

and

45.20

47.90

14.67

2.70m at 14.67g/t Au

including

45.20

47.00

19.05

1.80m at 19.05g/t Au

and

86.50

87.70

0.77

1.20m at 0.77g/t Au

and

108.60

112.60

1.37

4.00m at 1.37g/t Au

including

108.60

109.60

1.51

1.00m at 1.51g/t Au

and

111.60

112.60

3.26

1.00m at 3.26g/t Au

BBDD059

16.80

20.90

7.99

4.10m at 7.99g/t Au

including

17.80

18.90

28.1

1.10m at 28.10g/t Au

and

63.80

64.80

0.27

1.00m at 0.27g/t Au

and

121.00

123.00

1.35

2.00m at 1.35g/t Au

including

121.00

122.00

2.16

1.00m at 2.16g/t Au

BBDD060

24.20

25.40

0.20

1.20m at 0.20g/t Au

and

90.10

91.10

8.53

1.00m at 8.53g/t Au

BDD061

49.60

50.60

0.76

1.00m at 0.76g/t Au

 and

94.50

95.60

0.86

1.10m at 0.86g/t Au

 and

109.00

111.00

12.5

2.00m at 12.50g/t Au

including

109.00

110.00

22.67

1.00m at 22.67g/t Au

BBDD062

23.40

24.40

0.38

1.00m at 0.38g/t Au

 and

46.90

47.90

0.33

1.00m at 0.33 g/t Au

 and

112.70

113.70

0.43

1.00m at 0.43 g/t Au

BBDD063

14.10

15.20

0.42

1.10m at 0.42 g/t Au**

 and

40.10

43.10

0.79

3.00m at 0.79 g/t Au

including

40.10

41.10

1.13

1.00m at 1.13 g/t Au

 and

58.30

59.30

2.47

1.00m at 2.47g/t Au

 and

96.85

99.00

9.95

2.15m at 9.95g/t Au

including

96.85

98.00

18.21

1.15m at 18.21g/t Au

 and

113.60

118.80

0.97

5.20m at 0.97g/t Au

including

113.60

114.60

2.88

1.00m at 2.88g/t Au

BBDD064

No significant intersections

* Intervals greater than 1m, calculated using a 0.20g/t Au cut-off and no more than 25% internal dilution. True widths are variable due to difference in vein orientation but are typically 60% of the reported downhole interval.

**No samples were taken either side of this interval. However, following review of the core, the zone is considered to be fully-tested.

 

Selective sampling of the first 10 holes in the programme (all drilled vertically) returned gold-bearing intersections in nine holes, with circa 31% of the intersections between surface and 50m vertical depth, including 4.10m at 7.99g/t Au and 2.70m at 14.67g/t Au from BBDD059 and BBDD058 respectively. The selective sampling targeted veins and their alteration haloes; sampling outside of these intervals will be completed if required.

The highest-grading intervals relate to laminated and brecciated quartz-tourmaline veins. The veins are mainly quartz with minor carbonate, and with tourmaline and chlorite stringers that are associated with sulphide (pyrite and minor chalcopyrite) mineralisation.

 

Figure 2. Drill hole BBDD059: core photo over interval grading 7.99g/t Au over 4.10m, with quartz-tourmaline veining and alteration halo (including disseminated sulphides) in the tonalite wall rock.

 

Figure 3: Drill hole BBDD058: core photo over interval grading 14.27g/t Au over 2.70m, with 2.40m wide quartz-tourmaline vein within tonalite host rock. Pyrite mineralisation throughout and with strong local brecciation.

 

A further 15 holes have been planned at BZ1-MRE, focused on infill and extensional drilling to expand and upgrade the existing MRE, and 25 holes are also planned at two along-strike target areas, BZ1-NE and BZ1-SW, where exploration to date has confirmed coincident geochemical and geophysical targets (Figure 3; announcement dated 25 March 2024).

Figure 4. Drill plan for Bakassi Zone 1, highlighting results received, results pending and holes yet to be drilled within the Phase 5 programme.

 

The drilling programme is ongoing and further results are anticipated in Q4 2024.

For further information on the Bibemi project, including a JORC Table 1, please see the following page of the Company's website https://orioleresources.com/projects/bibemi/. 

 

 

 

Competent Persons Statement

 

The information in this announcement that relates to the Mineral Resource is based on data compiled by Mr. Robert Davies, EurGeol, CGeol, an independent consultant to Oriole. Mr Davies is a Director of Forge International Limited. Mr Davies has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Davies consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.  The Company confirms that it is not aware of any new information or data that materially affects the Mineral Resource Estimate, and that all material assumptions and technical parameters underpinning the MRE continue to apply.

 

The technical information in this release that relates to Exploration Results and the planned exploration programme has been compiled by Mrs Claire Bay (Executive Director). Claire Bay (MGeol, CGeol) is a Competent Person as defined in the JORC code and takes responsibility for the release of this information. Claire has reviewed the information in this announcement and confirms that she is not aware of any new information or data that materially affects the information reproduced here.

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the retained EU law version of the Market Abuse Regulation (EU) No. 596/2014 (the "UK MAR") which is part of UK law by virtue of the European Union (Withdrawal) Act 2018. The information is disclosed in accordance with the Company's obligations under Article 17 of the UK MAR. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

 

** ENDS **

 

 

 

For further information please visit www.orioleresources.com,  @OrioleResources on X, 

or contact:

Oriole Resources Plc

Tel: +44 (0)20 7830 9650

Martin Rosser / Bob Smeeton / Claire Bay

 

BlytheRay (IR/PR Contact)

Tel: +44 (0)20 7138 3204

Tim Blythe / Megan Ray

 

Grant Thornton UK LLP

Tel: +44 (0)20 7383 5100

Samantha Harrison / Ciara Donnelly / Elliot Peters

SP Angel Corporate Finance LLP

Ewan Leggat

 

Tel: +44 (0)20 3470 0470

 

Notes to Editors:

Oriole Resources PLC is an AIM-listed gold exploration company, with projects in West and Central Africa. It is focussed on early-stage exploration in Cameroon, where the Company has reported a Resource of 375,000 oz Au at 2.30g/t in the JORC Inferred category at its 82.2% owned Bibemi project and has identified multi-kilometre gold and lithium anomalies within the district-scale Central Licence Package project. BCM International is currently earning up to a 50% interest in the Bibemi and Mbe projects in return for a combined investment of US$1.5 million in signature payments, up to US$8 million in exploration expenditure, as well as JORC resource-based success payments.

 

At the Senala gold project in Senegal, AGEM Senegal Exploration Suarl ('AGEM'), a wholly-owned subsidiary of Managem Group, has recently completed a six-year earn-in to acquire an estimated 59% beneficial interest in the Senala Exploration Licence by spending US$5.8 million. A review of expenditure and discussions on the formation of a joint-venture company are currently underway. The Company also has several interests and royalties in companies operating in East Africa and Turkey that could deliver future cash flow.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLUAUURSNUKAUR
Date   Source Headline
5th Nov 20257:00 amRNSBCM Agreement, Fully Funded Mbe-N Drill Programme
3rd Nov 202512:15 pmRNS-RUpdated Investor Presentation
30th Oct 20257:00 amRNS-RMelloLondon Investor Event
29th Oct 20257:00 amRNSExercise of Warrants and Total Voting Rights
21st Oct 20259:00 amRNS-RGreenwood Research Note
21st Oct 20257:00 amRNSMaiden JORC Resource Estimate for MB01 South
3rd Oct 20257:00 amRNS-RInvestor Presentation Access
25th Sep 20257:00 amRNS-RInvestor Presentation – Reminder
23rd Sep 20257:00 amRNSInterim Results
22nd Sep 20257:00 amRNSStrong Final Drilling Results for Mbe
11th Sep 20257:00 amRNS-RInvitation to Investor Presentation
8th Sep 20257:01 amRNS-RGreenwood Initiation Research Report
8th Sep 20257:00 amRNSExercise of Warrants and Total Voting Rights
2nd Sep 20257:01 amRNSPhase 1 Drilling Completed at Mbe
2nd Sep 20257:00 amRNSExercise of Warrants and Total Voting Rights
26th Aug 20257:00 amRNSBonanza Gold Finds Extend Mbe Mineral System
12th Aug 20257:00 amRNSHolding(s) in Company
22nd Jul 20257:00 amRNSConfirmed Extension of Mbe Sub-Surface Gold System
10th Jul 202510:45 amRNSDirectors’ Share Dealings
9th Jul 20257:00 amRNSMaiden JORC Exploration Target for Mbe
4th Jul 20257:00 amRNSExtension of Warrant Expiry Date
25th Jun 20251:48 pmRNSResult of AGM
25th Jun 20257:00 amRNS-RBibemi ESIA and ELA Progress Update
24th Jun 20257:00 amRNSFurther Gold Results and Exploration Target at Mbe
19th Jun 20257:00 amRNSSenala Gold Project Exploration Target Update
12th Jun 20257:00 amRNSMbe - further significant gold mineralisation
11th Jun 20257:00 amRNSMbe drilling - over 40 further gold intersections
9th Jun 20257:00 amRNSAppointment of Nominated Adviser and Broker
27th May 20253:24 pmRNSHolding(s) in Company
19th May 20257:00 amRNSMbe Drilling Confirms Higher-Grade Gold Potential
16th May 20252:48 pmRNSChange of Registered Office
15th May 20257:00 amRNSBibemi Gold Increased Mineral Resource Estimate
14th May 20255:05 pmRNSPosting of Annual Report and Notice of AGM
13th May 20257:00 amRNS-RGreenwood Capital Partners Research Appointment
12th May 20257:00 amRNSExcellent Gold Intersection at Mbe Gold Project
15th Apr 20258:00 amRNS-RInvestor Presentation
15th Apr 20257:00 amRNSMbe Project Delivers Further Gold Mineralisation
4th Apr 20257:00 amRNS-RInvestor Presentation and Q&A
3rd Apr 20252:57 pmRNSHolding(s) in Company
2nd Apr 20257:00 amRNSFinal Results and Notice of AGM
24th Mar 20257:00 amRNSAssaying Method Review for the Mbe Gold Project
17th Mar 20257:00 amRNSFinal Results from Phase 5 Drilling at Bibemi
5th Mar 20257:00 amRNSFurther Results from Mbe Maiden Drilling Programme
28th Feb 20252:21 pmRNSUpdate on Drilling Results at Mbe Gold Project
13th Feb 20257:00 amRNSPhase 5 Drilling Completed at Bibemi Gold Project
11th Feb 20257:00 amRNSDirectors’ Share Dealings
3rd Feb 20257:05 amRNSEncouraging Results from Discovery Hole at Mbe
3rd Feb 20257:00 amRNSDrilling Update for the Bibemi Gold Project
29th Jan 20257:00 amRNSLicence Renewal for Wapouzé Limestone Property
14th Jan 20257:00 amRNSCorporate Update and Latest Results from Bibemi

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.