Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOriole Regulatory News (ORR)

Share Price Information for Oriole (ORR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.275
Bid: 0.275
Ask: 0.30
Change: 0.0225 (8.49%)
Spread: 0.025 (9.091%)
Open: 0.275
High: 0.275
Low: 0.27
Prev. Close: 0.265
ORR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bibemi Phase 2 Drilling Results

20 Dec 2021 07:00

RNS Number : 1159W
Oriole Resources PLC
20 December 2021
 

Oriole Resources PLC 

('Oriole Resources' or 'the Company' or 'the Group')

 

Phase 2 Diamond Drilling at Bibemi Returns up to 6.50m @ 3.92 g/t Au

 

Oriole Resources PLC (AIM: ORR), the AIM-quoted exploration company focussed on West Africa, is pleased to announce results from the recently completed Phase 2 diamond drilling programme at its 90%-owned Bibemi gold project ('Bibemi' or 'the Project') in Cameroon.

 

The programme focussed on the Bakassi Zone 1 prospect ('Bakassi Zone 1') and has delivered best mineralised intervals of 6.50m grading 3.92 grammes per tonne ('g/t') gold ('Au') including 1.00m grading 16.79 g/t Au, 5.20m grading 1.97 g/t Au and 2.25m grading 8.82 g/t Au including 1.00m grading 19.33 g/t Au.

 

A follow-up programme of infill and extension drilling ('Phase 3') is nearing completion and results are anticipated in Q1-2022.

 

 

Highlights

 

· Phase 2 drilling completed for 1,650.70m in 11 holes to test a c.1km portion of Bakassi Zone 1, to infill previously reported mineralised zones identified by maiden drilling;

· Selective sampling has delivered significant intersections (based on a 0.3 g/t Au cut-off) on all drill fence lines. Best results include:

 

BBDD030

o 2.40m grading 2.68 g/t Au from 21.30m

o 2.25m grading 8.82 g/t Au from 34.75m including 1.00m grading 19.33 g/t Au

BBDD031

o 5.20m grading 1.97 g/t Au from 100.70m including 3.20m grading 2.94 g/t Au

BBDD034

o 6.50m grading 3.92 g/t Au from 119.00m including 1.00m grading 16.79 g/t Au

o 1.20m grading 13.79 g/t Au from 144.70m

BBDD037

o 2.10m grading 1.91 g/t Au from 110.10m

BBDD039

o 1.00m grading 8.80 g/t Au from 127.90m

BBDD040

o 1.20m grading 7.28 g/t Au from 78.80m

 

· Results continue to confirm continuity of surface mineralisation along strike and to a vertical depth of more than 100m below surface. The system remains open at depth;

· A series of drill plans and sections for the Phase 2 programme can be viewed at the following link: http://www.rns-pdf.londonstockexchange.com/rns/1159W_1-2021-12-19.pdf

· Phase 3 drilling, to test the width and strike extension of the widest (dilational) zones of veining identified in the Phase 2 core, is nearing completion for a planned 1,350m in nine holes. Results are anticipated in Q1-2022.

 

 

Oriole Resources CEO, Tim Livesey, said: "The results from the second phase of drilling at Bibemi continue to support our targeting rationale, with good widths & grades being intersected around the southern Bakassi Zone 1 target lines. 

"The continued drill success at Bibemi gives us great confidence in our understanding of the system and these positive results have allowed us to continue straight into Phase 3 of the drill testing programme. We will of course share those results as and when they become available."

 

 

Further Details

 

In Q2-2021, the Company completed its maiden drilling programme at Bibemi for a total of 3,118m in 29 holes to test four key prospects (Bakassi Zone 1, Bakassi Zone 2, Lawa West and Lawa East) within the 8.3km-long system.

 

Results from the maiden programme confirmed shear-hosted gold mineralisation at all four prospects with up to 12m-wide zones of mineralisation returned from the southern end of Bakassi Zone 1. Best intersections from that programme included 2.45m grading 2.96 g/t Au, 3.60m grading 1.75 g/t Au and 12.40m grading 0.71 g/t Au, all returned from drilling fence lines BZ1_L6 and BZ1_L7, which are themselves 800m apart.

 

The Company today reports that it has completed a follow-up diamond drilling programme for 1,650m in 11 holes (BBDD030 - BBDD040), focussed on infill and extension drilling around these fence lines. All holes intersected mineralisation at the expected depth within the delineated northeast-trending shear corridor with the most significant zones of veining (quartz-tourmaline) and alteration intersected on lines BZ1_L7 and BZ1_P2_L3 that are located approximately 400m apart.

 

Selective sampling of the core, based on visual inspection of mineralisation and alteration, has delivered significant intersections in all holes (Table 1). Best results include 6.50m grading 3.92 g/t Au including 1.00m grading 16.79 g/t Au (BBDD034, line BZ1_P2_L3), 5.20m grading 1.97 g/t Au (BBDD031, line BZ1_L7) and 2.25m grading 8.82 g/t Au including 1.00m grading 19.33 g/t Au (BBDD030, line BZ_L7). QAQC for all of the reported intervals were found to be within acceptable limits. Further testing of the mineralised envelopes has been completed and results are awaited.

 

Table 1. Significant intersections from selective sampling of diamond drill holes BBDD030 to BBDD040 at Bibemi (based on a 0.3 g/t Au cut-off).

 

Hole ID

Azimuth (°)

Inclination (°)

From (m)

To (m)

Au (ppm)

Au Interval*

BBDD030

320

-50

21.30

23.70

2.68

2.40m @ 2.68 g/t g/t**

and

 

 

34.75

37.00

8.82

2.25m @ 8.82 g/t g/t**

including

 

 

36.00

37.00

19.33

1.00m @ 19.33 g/t

and

 

 

42.00

42.80

3.65

0.80m @ 3.65 g/t

BBDD031

320

-50

73.80

75.80

2.00

2.00m @ 0.81 g/t

and

 

 

83.60

86.70

0.43

3.10m @ 0.43 g/t

and

 

 

100.70

105.90

1.97

5.20m @ 1.97 g/t

including

 

 

102.70

105.90

2.94

3.20m @ 2.94 g/t

and

 

 

145.80

146.90

0.32

1.10m @ 0.32 g/t

BBDD032

320

-50

140.30

143.90

3.60

3.60m @ 0.40 g/t**

BBDD033

320

-50

45.90

47.10

0.62

1.20m @ 0.62 g/t**

and

 

 

67.50

68.60

2.81

1.1m @ 2.81 g/t**

BBDD034

320

-50

24.30

25.50

0.31

1.20m @ 0.31 g/t

and

 

 

60.30

61.50

0.60

1.20m @ 0.60 g/t

and

 

 

65.10

66.30

1.24

1.20m @ 1.24 g/t

and

 

 

68.70

69.90

0.79

1.20m @ 0.79 g/t

and

 

 

73.50

74.70

1.25

1.20m @ 1.25 g/t

and

 

 

103.50

107.10

0.54

3.60m @ 0.54 g/t**

and

 

 

119.00

125.50

3.92

6.50m @ 3.92 g/t g/t**

including

 

 

120.10

121.10

16.79

1.00m @ 16.79 g/t

including

 

 

123.50

125.50

4.13

2.00m @ 4.13 g/t g/t**

and

 

 

132.70

133.90

0.65

1.20m @ 0.65 g/t

and

 

 

144.70

145.90

13.79

1.20m @ 13.79 g/t

BBDD035

320

-50

29.90

31.10

1.73

1.20m @ 1.73 g/t g/t**

and

 

 

56.20

57.20

1.25

1.00m @ 1.25 g/t

and

 

 

84.80

86.00

0.31

1.20m @ 0.31 g/t

BBDD036

320

-50

114.00

118.80

0.62

4.80m @ 0.62 g/t

including

 

 

114.00

115.20

1.08

1.20m @ 1.08 g/t

including

 

 

117.60

118.80

1.10

1.20m @ 1.10 g/t

and

 

 

142.80

144.00

6.05

1.20m @ 6.05 g/t

BBDD037

 

 

49.50

50.50

0.31

1.00m @ 0.31 g/t

and

 

 

61.30

68.30

0.43

7.00m @ 0.43 g/t

and

 

 

110.10

112.20

1.91

2.10m @ 1.91 g/t g/t**

including

 

 

110.10

111.00

3.20

0.90m @ 3.20 g/t

and

 

 

120.50

121.50

0.37

1.00m @ 0.37 g/t**

BBDD038

320

-50

12.70

13.70

1.05

1.00m @ 1.05 g/t g/t**

and

 

 

100.00

101.20

2.94

1.20m @ 2.94 g/t

BBDD039

320

-50

127.90

128.90

1.00

1.00m @ 8.80 g/t g/t**

BBDD040

320

-50

78.80

80.00

7.28

1.20m @ 7.28 g/t

*Intervals greater than 1 gramme per metre average grade, calculated using a 0.3 g/t Au cut-off and no more than 50% internal dilution. True widths are approximately 77% of the reported downhole interval.

*\* The samples within the reported intersection started and/or finished in grade and so further sampling has been completed to determine the full extent of the mineralised envelope. Results are awaited.

 

A follow-up Phase 3 programme of infill and extension drilling is nearing completion for a further c.1,350m in nine holes. The holes were planned on the basis of a visual assessment of the Phase 2 core, to test the width and strike extension of the widest zones of veining, that are interpreted to reflect more dilational parts of the system where there has been an enhanced flow of mineralised fluids. Results are anticipated in Q1-2022.

 

For further information on the Bibemi project, including drill plans and a JORC Table 1, please see the following page of the Company's website https://orioleresources.com/projects/bibemi/.

 

Under the terms of its option agreement with Bureau d'Etudes et d'Investigations Géologico-minières, Géotechniques et Géophysiques SARL ('BEIG3'), the Company has satisfied the conditions to earn a 90% interest in Bibemi, the Wapouzé project (20km to the north) and three licences in Central Cameroon. Beneficial ownership in the licences has been confirmed and the administrative process to formalise this ownership is currently underway.

 

 

Competent Persons Statement 

The information in this release that relates to Exploration Results has been compiled by Claire Bay (Executive Director, Exploration and Business Development). Claire Bay (MGeol, CGeol) is a Competent Person as defined in the JORC code and takes responsibility for the release of this information. Claire has reviewed the information in this announcement and confirms that she is not aware of any new information or data that materially affects the information reproduced here.

 

 

** ENDS **

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the retained EU law version of the Market Abuse Regulation (EU) No. 596/2014 (the "UK MAR") which is part of UK law by virtue of the European Union (Withdrawal) Act 2018. The information is disclosed in accordance with the Company's obligations under Article 17 of the UK MAR. Upon the publication of this announcement, this inside information is now considered to be in the public domain. 

 

For further information please visit www.orioleresources.com, @OrioleResources on Twitter, or contact:

 

Oriole Resources PLC

Bob Smeeton / Tim Livesey / Claire Bay

 

Tel: +44 (0)20 7830 9650

Blytheweigh (IR/PR contact)

Tim Blythe / Megan Ray / Rachael Brooks

 

Tel: +44 (0)20 7138 3204

Grant Thornton UK LLP

Samantha Harrison / George Grainger

 

Tel: +44 (0)20 7383 5100

Shard Capital Partners LLP

Damon Heath / Erik Woolgar / Isabella Pierre

 

Tel: +44 (0)20 186 9900

 

Notes to Editors:

 

Oriole Resources PLC is an AIM-listed exploration company, operating West Africa. It is focused on early-stage exploration in Cameroon (at its 90%-owned Bibemi, Wapouzé and Central Licences projects) and the more advanced Senala gold project in Senegal, where IAMGOLD has the option to spend US$8 million to earn a 70% interest. The Company has several interests and royalties in companies operating throughout Africa and Turkey that could deliver future cash flow, and it continues to assess new opportunities in both regions.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUKOWRABUUAAA
Date   Source Headline
1st Jul 20217:00 amRNSThani Stratex Djibouti Exploration Update
30th Jun 20214:56 pmRNSTotal Voting Rights
29th Jun 20217:00 amRNSDrilling Confirms Gold at All Four Prospects
23rd Jun 202112:00 pmRNSResult of Annual General Meeting
16th Jun 20217:00 amRNSAnnual General Meeting Arrangements
14th Jun 202112:59 pmRNSR&D Rebate from HMRC Delivers £46k
14th Jun 20217:00 amRNSBibemi Delivers High-Grade Intersections
10th Jun 20217:00 amRNSExercise of Warrants and Total Voting Rights
9th Jun 20217:00 amRNSPre-AGM Presentation and Q&A
25th May 202112:49 pmRNSUpdated Corporate Presentation
14th May 20214:41 pmRNSSecond Price Monitoring Extn
14th May 20214:35 pmRNSPrice Monitoring Extension
14th May 20212:06 pmRNSSecond Price Monitoring Extn
14th May 20212:00 pmRNSPrice Monitoring Extension
12th May 20217:00 amRNSYear 4 Drilling Programmes Underway at Faré
10th May 20217:00 amRNSBibemi Gold Project Update
30th Apr 20217:01 amRNSPosting of Annual Report and Notice of AGM
30th Apr 20217:00 amRNSTotal Voting Rights
23rd Apr 20217:00 amRNSExercise of Options and Total Voting Rights
12th Apr 20212:24 pmRNSDrilling Confirms Visible Gold at Lawa Prospects
9th Apr 202111:11 amRNSDirector Dealing
9th Apr 20217:00 amRNSExercise of Warrants and Total Voting Rights
6th Apr 20217:00 amRNSAcquisition of 51% of RMC Sarl
1st Apr 20217:00 amRNSTotal Voting Rights
31st Mar 202112:56 pmRNSProof of Concept Confirmed at Bibemi Gold Project
24th Mar 20211:00 pmRNSInvestor Event – Final Results Q&A
24th Mar 20217:00 amRNSFinal Results and Notice of AGM
23rd Mar 20217:01 amRNSSenala Joint Venture Update
23rd Mar 20217:00 amRNSThani Stratex Djibouti Exploration Update
22nd Mar 20217:01 amRNSBibemi Maiden Drilling Programme Update
22nd Mar 20217:00 amRNSExercise of Warrants and Total Voting Rights
16th Mar 20217:00 amRNSInvestment Update on Thani Stratex Resources
15th Mar 20217:00 amRNSExercise of Warrants and Total Voting Rights
11th Mar 20214:41 pmRNSSecond Price Monitoring Extn
11th Mar 20214:36 pmRNSPrice Monitoring Extension
11th Mar 20219:05 amRNSSecond Price Monitoring Extn
11th Mar 20219:00 amRNSPrice Monitoring Extension
11th Mar 20217:00 amRNSSenala Air Core Drilling Results
5th Mar 20217:00 amRNSExercise of Warrants and Total Voting Rights
4th Mar 202111:05 amRNSSecond Price Monitoring Extn
4th Mar 202111:00 amRNSPrice Monitoring Extension
19th Feb 20217:00 amRNSExercise of Warrants/Options & Total Voting Rights
18th Feb 20217:00 amRNSGold Targets Identified in Central Cameroon
12th Feb 20217:00 amRNSExercise of Warrants and Total Voting Rights
9th Feb 20214:41 pmRNSSecond Price Monitoring Extn
9th Feb 20214:35 pmRNSPrice Monitoring Extension
9th Feb 20212:05 pmRNSSecond Price Monitoring Extn
9th Feb 20212:00 pmRNSPrice Monitoring Extension
8th Feb 20217:00 amRNSExercise of Warrants/Options & Total Voting Rights
3rd Feb 20217:05 amRNSExercise of Warrants and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.