Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Tungsten Update

13 Nov 2007 07:01

Ormonde Mining PLC13 November 2007 13 November 2007 Ormonde Mining plc Ongoing Drilling and Evaluation Indicates Multi-Vein Nature of Ormonde's Spanish Tungsten Project DUBLIN & LONDON: 13 November 2007 - Ormonde Mining plc ("Ormonde" or "theCompany") is pleased to report that ongoing drilling and evaluation work at itsBarruecopardo Tungsten Project in Salamanca, Spain ("the Project") now indicatea deposit with multiple mineralised zones, raising the Project's resource andeconomic potential. Drilling to-date at the Project has focused primarily on targeting a high gradetungsten zone termed Filon Maestro ("FM Zone") to the north of the main historicopen pit mine. Interpretation of recent drilling intersections and access tohistorical data now show that a further two tungsten mineralised zones can bedefined. The Project therefore now comprises: • Filon Maestro Zone: Ormonde recently reported that ongoing infill and step-out drilling has extended the known limits of the FM Zone along strike to 750 metres and at depth to over 175 metres. The Company is pleased to report that drilling continues to intersect this zone at depth and supports previous results, with a new intersection from hole BAR-19 of 2 metres grading 0.5% WO3. • Filon Principal Zone: Access to historical mining reports has now indicated that previous mining activity was targeted at a wider, lower grade tungsten zone, the Filon Principal Zone ("FP Zone"), located beneath the flooded portion of the main pit. A study completed in 1985 reports that this zone was mined over a 700 metres strike length, with an average width of 14 metres (maximum 22 metres) and average grade of 0.23% WO3. Initial drilling of the FP Zone is underway with a view to identifying higher grade tungsten zones within it. • Filon Central Zone: A new intersection from BAR-19 of 8 metres grading 0.3% WO3 (includes 1 metre grading 1.5% WO3) indicates the presence of tungsten-rich quartz veins in the granite rock between the FM and FP Zones. This zone appears to correlate to what were previously reported as isolated tungsten intervals of 1 metre grading 1.4% WO3 in BAR-16 and 1.0 metre grading 0.7% WO3 in BAR-18. This zone, named Filon Central, will be further tested in the current drilling programme. Kerr Anderson, Managing Director, said: "We continue to make excellent progress with our tungsten programme. Theemerging picture of a Project with growing resource potential through thedefinition of multiple mineralised zones is an extremely positive development." A table of all significant drilling results reported to-date is provided belowand a drawing showing the location of the zones described above is included inthe PDF version of this announcement at www.ormondemining.com/doc/press/pr071113.pdf Ormonde currently has two drill rigs operating at the Barruecopardo Project,with the objective of fast-tracking the Project's evaluation through infill andstep-out drilling. Kerr Anderson PhD EurGeol PGeo, Managing Director of Ormonde Mining plc, and aqualified person as defined in the Guidance Note for Mining, Oil and GasCompanies, March 2006, of the London Stock Exchange, has reviewed and approvedthe technical information contained in this announcement. A glossary explaining technical terms contained in this announcement can befound at www.ormondemining.com/projects/glossary.html. Enquiries to: Ormonde Mining plc Kerr Anderson, Managing Director, Fraser Gardiner, Director Tel: +353 (0)46 9073623 Bankside Consultants Simon Rothschild / Louise Mason Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065 Davy (Nominated Adviser to Ormonde) Fergal Meegan Tel: + 353 1 679 6363 ENDS Drilling Results FILON MAESTRO ZONE FILON CENTRAL ZONE Hole From (m) To (m) Length (m) WO3 % From (m) To (m) Length (m) WO3 % BAR-01 115.7 116.7 1.0 0.5 BAR-02 To be deepened to intersect FM Zone BAR-03 101.5 104.9 3.4 1.0 including 101.9 102.9 1.0 2.4 BAR-04 122.0 122.9 0.9 1.6 142.5 143.1 0.6 4.5 BAR-05 133.7 135.4 1.7 0.4 BAR-06 245.0 246.0 1.0 0.7 181.6 182.8 1.2 0.6 BAR-07 Intersected intrusion cutting main zone BAR-09 119.0 121.0 2.0 2.1 BAR-10 125.0 127.0 2.0 1.5 BAR-11 114.0 115.0 1.0 0.3 BAR-12 128.0 130.0 2.0 1.7 BAR-13 123.0 125.0 2.0 2.4 BAR-14 114.0 115.0 1.0 0.3 BAR-15 122.0 124.0 2.0 0.4 BAR-16 202.0 206.0 4.0 0.6 91.0 92.0 1.0 1.4 BAR-17 125.0 127.0 2.0 0.9 BAR-18 254.0 255.0 1.0 0.3 91.0 92.0 1.0 0.7 BAR-19 268.0 270.0 2.0 0.5 96.0 104.0 8.0 0.3 96.0 97.0 1.0 1.5 Note: BAR-19 is a new hole reported in this announcement. Results from allother holes have been reported in previous announcements. About Ormonde Ormonde Mining plc is quoted on the AIM in London and the IEX in Dublin.Ormonde is a mineral development and exploration company focused on Spain, withthe objective of developing mining projects and taking them into production. Ormonde's main project is the La Zarza Copper-Gold-Zinc Project in southernSpain where the Company's objective is to establish an underground miningoperation producing copper, gold, zinc and silver in concentrates. A BankableFeasibility Study is currently being carried out by leading internationalengineering firms. Ormonde is also evaluating the Barruecopardo high-grade tungsten deposit in theSalamanca area where a continuous programme of in-fill and step-out drilling isnow underway with a view to fast-tracking the evaluation of this project. TheCompany's other current activities include successful gold exploration at thePino de Oro Prospect (Zamora) and Sierro Prospect (Salamanca). For more information please visit www.ormondemining.com. About Tungsten Tungsten is most frequently used as tungsten monocarbide, which has a hardnessclose to diamond, in cemented carbides. The principal tungsten applicationsinclude its use in cutting steels and in tungsten alloys, electronics, andchemical products. Prices of tungsten concentrates are expected to remain buoyant for the longterm, and are currently quoted by the Metal Bulletin in the range $160-$180 permetric tonne unit. A metric tonne unit is equal to 10kg of WO3, which equatesto 1.0% contained WO3 in the rock. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 20202:50 pmRNSHolding(s) in Company
15th May 20207:00 amRNSBusiness Update, Salary Reductions, Options Grant
8th Apr 20207:00 amRNSFinal Results
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:37 pmRNSPrice Monitoring Extension
30th Mar 202011:00 amRNSPrice Monitoring Extension
13th Mar 202011:15 amRNSHolding(s) in Company
9th Mar 20207:55 amRNSDirector/PDMR Shareholding
17th Feb 20207:00 amRNSCompletion of Disposal
13th Feb 20201:53 pmRNSEGM Results
10th Feb 20207:00 amRNSDirectorate Change
27th Jan 20204:39 pmRNSPublishing of Circular and Proposed Board Changes
10th Jan 20203:58 pmRNSHolding(s) in Company
8th Jan 20204:41 pmRNSSecond Price Monitoring Extn
8th Jan 20204:36 pmRNSPrice Monitoring Extension
8th Jan 20202:05 pmRNSSecond Price Monitoring Extn
8th Jan 20202:00 pmRNSPrice Monitoring Extension
8th Jan 202012:58 pmRNSProposed Disposal
27th Dec 201911:05 amRNSSecond Price Monitoring Extn
27th Dec 201911:00 amRNSPrice Monitoring Extension
25th Nov 20197:00 amRNSOperational Update
24th Oct 20193:15 pmRNSHolding(s) in Company
24th Oct 20193:14 pmRNSHolding(s) in Company
17th Oct 20197:00 amRNSSaloro Financing Update
30th Sep 20197:00 amRNSInterim Results
23rd Sep 20193:31 pmRNSResult of AGM
20th Sep 20197:00 amRNSBarruecopardo Tungsten Mine Update
27th Jun 20192:49 pmRNSAnnual Financial Report
19th Jun 20197:00 amRNSFinal Results
23rd May 20197:00 amRNSBarruecopardo Update
26th Feb 20197:00 amRNSBarruecopardo Project Update
14th Dec 20187:00 amRNSBarruecopardo Tungsten Project Update
11th Oct 20183:14 pmRNSChange of Registered Office
27th Sep 20183:53 pmRNSResult of AGM
27th Sep 20187:00 amRNSInterim Results for six months ended 30 June 2018
12th Sep 20187:00 amRNSBarruecopardo Tungsten Project Update
27th Jun 201812:19 pmRNSAnnual Financial Report
19th Jun 20187:00 amRNSFinal Results
17th Jan 201811:58 amRNSGranting of Options
28th Nov 20177:00 amRNSBarruecopardo Tungsten Mine Construction Update
6th Oct 20174:07 pmRNSHolding(s) in Company
28th Sep 20177:00 amRNSInterim Results 2017
18th Sep 20172:09 pmRNSResult of AGM
5th Sep 20177:00 amRNSBarruecopardo Tungsten Project
28th Jun 20177:00 amRNSPublication of Annual Report
20th Jun 20177:00 amRNSFinal Results for the year ended 31 December 2016
2nd Jun 20177:00 amRNSBarruecopardo Project Update
22nd Dec 201612:36 pmRNSBarruecopardo Tungsten Project
6th Oct 20166:04 pmRNSGranting of Options
30th Sep 20167:00 amRNSInterim Results 2016

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.