Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Update

26 Feb 2008 07:00

Ormonde Mining PLC26 February 2008 Ormonde Mining plc Further Drilling Success at Salamanca Tungsten Project DUBLIN & LONDON: 26 February 2008 - Ormonde Mining plc ("Ormonde" or the "Company") is pleased to report further drilling success and progress on itsevaluation programme at the Barruecopardo Tungsten Project in Salamanca, Spain(the "Project"), where it is continuing a "fast-track" evaluation following thepositive Order-of-Magnitude Study, details of which were reported on 24 January. Highlights • New results include 1 metre grading 4.1% WO3 in BAR-28. This is thehighest grade interval so far from the 2007-2008 drilling programme. • In addition, results from drill hole BAR-27 include 1 metre grading1.1% WO3, 4 metres grading 0.43% WO3 and 4 metres grading 0.4% WO3. • Drilling continues to intersect and extend the mineralised zones whichformed the January resource estimate of one million tonnes grading 0.7% WO3. Todate five main mineralised zones have been identified at the Project. • All drilling results received to date and new plans of the Projectarea are contained in the PDF version of this announcement atwww.ormondemining.com/doc/press/pr080226.pdf. • The first stage of resource drilling has been completed along the 1.5kilometre length of the known mineralised system. The results of this programmewill be received during the next 2-3 months and are expected to show an increasein the current 1 Mt resource towards the 1.5 Mt initial resource target. • Phase 1 metallurgical programme also in progress following on fromsuccessful scoping level tests during 2007. Kerr Anderson, Managing Director, said: "We are very pleased with the rapid progress we continue to make atBarruecopardo as we build upon the positive results of the Order-of-MagnitudeStudy. The new drilling results highlight the potential to add tonnage to ourexisting resource estimate in the near-term, and we are increasingly confidentthat we can achieve our stated initial 1.5 million tonne resource target withthe recent drilling programme." "As we advance our evaluation of the Project we are also encouraged by recentmarket commentary supporting our own view that tungsten has a promising futurewith higher prices predicted over the term that we aim to have Barruecopardo inproduction." In January Ormonde reported its Order-of-Magnitude Study which indicated that anunderground production rate of 200,000 tonnes per year would be appropriate fora start-up mining operation at the Project. This could result in tungstenproduction of 90,000 metric tonne units of WO3 per year. The production ratecould be increased post start-up if, as expected, the reserve base at theProject is upgraded on further drilling. Total capital costs to develop theProject would be in the region of €10-15 million, and net surplus cashflows fromthe initial operation should be in the region of €5 million per year. New Drilling Results Significant assay results received since the last drilling report are asfollows: Hole From (m) Width (m) True Width (m) WO3% ZoneBAR-27 28.0 4.0 3.3 0.4 FP 72.0 1.0 0.8 1.1 80.0 1.0 0.8 0.5 96.0 4.0 3.3 0.4 FC 264.0 1.0 0.8 0.4 282.0 2.0 1.7 0.6 FMBAR-28 16.0 1.0 0.7 0.9 171.0 1.0 0.8 4.1 FMBAR-29 63.0 1.0 0.8 0.4 FC 196.0 1.0 0.8 0.3 FM Zone codes: FP = Filon Principal Zone FC = Filon Central Zone FM = Filon Maestro Zone The interpretation of drill hole BAR-27 shows that it intersected all threemajor zones in areas not included in the January resource estimate. Three othersignificant mineralised intervals were intersected which have not been includedin the resource; further interpretation work and the current definition drillingprogramme will determine the continuity of these zones and assess their resourcepotential. BAR-28 and BAR-29 are infill holes primarily targeting the Filon Maestro Zoneand confirm the expected geological continuity. BAR-28 further highlights thepotential for very high grades of tungsten in this zone. Metallurgical Testwork In July 2007, the Company reported preliminary metallurgical testwork undertakenby SGS Lakefield Research on two samples of the tungsten mineralisation. Thisdemonstrated that tungsten mineral(s) are coarse grained and would beconcentrated effectively by traditional low cost gravity equipment. Furtherdetailed testwork is now underway to optimise a gravity testwork flowsheet anddetermine the key processing parameters for the production of a saleabletungsten concentrate. Kerr Anderson PhD EurGeol PGeo, Managing Director of Ormonde Mining plc, and aqualified person as defined in the Guidance Note for Mining, Oil and GasCompanies, March 2006, of the London Stock Exchange, has reviewed and approvedthe technical information contained in this announcement. A glossary explaining technical terms contained in this announcement can befound at www.ormondemining.com/projects/glossary.html. Enquiries to: Ormonde Mining plc Kerr Anderson, Managing Director, Fraser Gardiner, Director Tel: +353 (0)46 9073623 Bankside Consultants Simon Rothschild / Louise Mason Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703167065 Davy (Nomad / IEX Adviser) Fergal Meegan Tel: +353 (0)1 6796363 Brewin Dolphin (UK Adviser) Gordon Culfeather Tel: +44 (0) 141 314 8121 ENDS About Tungsten Tungsten is most frequently used as tungsten monocarbide, which has a hardnessclose to diamond, in cemented carbides. The principal tungsten applicationsinclude its use in cutting steels and in tungsten alloys, electronics, andchemical products. Prices of tungsten concentrates are expected to remain buoyant for the longterm, and are currently quoted by the Metal Bulletin in the range $160-$180 permetric tonne unit. A metric tonne unit is equal to 10kg of WO3, which equatesto 1.0% contained WO3 in the rock. About Ormonde Ormonde Mining plc is quoted on the AIM in London and the IEX in Dublin.Ormonde is a mineral development and exploration company focused on Spain, withthe objective of developing mining projects and taking them into production. For more information please visit www.ormondemining.com. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 20202:50 pmRNSHolding(s) in Company
15th May 20207:00 amRNSBusiness Update, Salary Reductions, Options Grant
8th Apr 20207:00 amRNSFinal Results
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:37 pmRNSPrice Monitoring Extension
30th Mar 202011:00 amRNSPrice Monitoring Extension
13th Mar 202011:15 amRNSHolding(s) in Company
9th Mar 20207:55 amRNSDirector/PDMR Shareholding
17th Feb 20207:00 amRNSCompletion of Disposal
13th Feb 20201:53 pmRNSEGM Results
10th Feb 20207:00 amRNSDirectorate Change
27th Jan 20204:39 pmRNSPublishing of Circular and Proposed Board Changes
10th Jan 20203:58 pmRNSHolding(s) in Company
8th Jan 20204:41 pmRNSSecond Price Monitoring Extn
8th Jan 20204:36 pmRNSPrice Monitoring Extension
8th Jan 20202:05 pmRNSSecond Price Monitoring Extn
8th Jan 20202:00 pmRNSPrice Monitoring Extension
8th Jan 202012:58 pmRNSProposed Disposal
27th Dec 201911:05 amRNSSecond Price Monitoring Extn
27th Dec 201911:00 amRNSPrice Monitoring Extension
25th Nov 20197:00 amRNSOperational Update
24th Oct 20193:15 pmRNSHolding(s) in Company
24th Oct 20193:14 pmRNSHolding(s) in Company
17th Oct 20197:00 amRNSSaloro Financing Update
30th Sep 20197:00 amRNSInterim Results
23rd Sep 20193:31 pmRNSResult of AGM
20th Sep 20197:00 amRNSBarruecopardo Tungsten Mine Update
27th Jun 20192:49 pmRNSAnnual Financial Report
19th Jun 20197:00 amRNSFinal Results
23rd May 20197:00 amRNSBarruecopardo Update
26th Feb 20197:00 amRNSBarruecopardo Project Update
14th Dec 20187:00 amRNSBarruecopardo Tungsten Project Update
11th Oct 20183:14 pmRNSChange of Registered Office
27th Sep 20183:53 pmRNSResult of AGM
27th Sep 20187:00 amRNSInterim Results for six months ended 30 June 2018
12th Sep 20187:00 amRNSBarruecopardo Tungsten Project Update
27th Jun 201812:19 pmRNSAnnual Financial Report
19th Jun 20187:00 amRNSFinal Results
17th Jan 201811:58 amRNSGranting of Options
28th Nov 20177:00 amRNSBarruecopardo Tungsten Mine Construction Update
6th Oct 20174:07 pmRNSHolding(s) in Company
28th Sep 20177:00 amRNSInterim Results 2017
18th Sep 20172:09 pmRNSResult of AGM
5th Sep 20177:00 amRNSBarruecopardo Tungsten Project
28th Jun 20177:00 amRNSPublication of Annual Report
20th Jun 20177:00 amRNSFinal Results for the year ended 31 December 2016
2nd Jun 20177:00 amRNSBarruecopardo Project Update
22nd Dec 201612:36 pmRNSBarruecopardo Tungsten Project
6th Oct 20166:04 pmRNSGranting of Options
30th Sep 20167:00 amRNSInterim Results 2016

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.