Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Report

15 Aug 2005 07:30

Ormonde Mining PLC15 August 2005 15 August 2005 Ormonde Mining plc La Zarza Drilling Report DUBLIN & LONDON: 15 August 2005 - Ormonde Mining plc ("Ormonde" or "theCompany") reports full results from its initial drilling programme at the LaZarza Gold-Copper Project in southwest Spain. HIGHLIGHTS • New results include: • Two intersections in ORM7 - 10.0 metres grading 6.0 grams per tonne ("g/t") gold, and 15.0 metres grading 5.8 g/t gold (both within an interval of 66.0 metres grading 3.3 g/t gold). • ORM11 - 20.4 metres grading 6.5 g/t gold. • Investigative metallurgical testwork has commenced on selected composite samples from both gold and copper Silicatado. Managing Director of Ormonde, Kerr Anderson commented, "We are very pleased with the drilling results to-date, which confirm theexpected widths and grades of mineralization at La Zarza and support ourconfidence in the project. We are now progressing with the metallurgicaltestwork, which will lead into a scoping study to determine the outlineeconomics of a combined gold and copper operation at La Zarza. In addition,infill drilling is underway and we look forward to reporting further resultsfrom the ongoing programme." DRILLING RESULTS The principal objective of the initial drilling programme was to obtainrepresentative samples for metallurgical testwork from both gold and copperresources within the "Silicatado" unit. Gold and copper zones were drilled toprovide typical material from different parts of the deposit. The mainanalytical results obtained are tabulated below, with gold equivalent gradesbased on in-situ metal values shown for comparative purposes: Gold Silicatado: Hole From (m) Width (m) Gold g/t Silver g/t Copper % Gold equiv. ORM2 297.0 5.0 5.0 46.6 1.1 8.1 *ORM5 163.0 17.0 4.1 40.5 0.4 5.6 ORM7 127.0 10.0 6.0 61.3 0.4 7.9 ORM7 178.0 15.0 5.8 27.8 0.6 7.5 ORM11 68.0 20.4 6.5 84.3 0.5 9.0 Copper Silicatado: Hole From (m) Width (m) Gold g/t Silver g/t Copper % Gold equiv. *ORM1 77.0 6.0 1.2 52.0 2.0 6.3 ORM2 261.0 10.0 0.5 33.4 2.0 5.3 ORM3 379.0 5.0 0.6 25.6 2.1 5.5 *ORM4 357.8 11.2 0.3 25.4 2.1 5.2 (Notes: *= reported previously. Widths are approximately true width. Goldequivalents calculated using the following prices: $400/oz Au, $7/oz Ag, $2,700/t Cu). Hole ORM11 was added to the original programme to test an area of geologicalcomplexity in the area of ORM1. The hole was drilled close to an intersectionreported by the previous operator (19.0 metres grading 3.9 g/t gold) andconfirms the broad and continuous gold mineralization in this part of thedeposit. With regards to other holes drilled to-date, ORM6 was an exploratory step-outhole on the eastern margin of the known resources and did not return significantresults. ORM8 and ORM9 are exploration holes testing possible coppermineralization 800 metres to the west of the main deposit, with results awaited.ORM10 intersected a change in geology, probably due to faulting, in the area ofORM1 and recovered a narrow interval (approx. 3 metres) of Silicatado. METALLURGICAL TESTWORK PROGRAMME Composite core samples from both the gold and copper Silicatado have beenselected and investigative metallurgical testwork has commenced at WardellArmstrong International, UK. The testwork will indicate the most appropriatemethod to recover the economic minerals from the gold and copper resources at LaZarza, and will provide the basis for the economic scoping study. PHASE 2 DRILLING Infill drilling has commenced ahead of schedule to provide further data requiredto classify resources according to JORC Code (2004) guidelines. Drilling iscurrently testing parts of the deposit accessed by underground workingspreviously developed for mining of the adjacent pyrite deposit. Compilation ofthe underground mining drawings has been completed and a study to assess howthese workings could be integrated into a new mining operation is underway. BACKGROUND TO THE LA ZARZA PROJECT The La Zarza Gold-Copper Project is situated within a Mining Concession in thePyrite Belt in southwest Spain. Ormonde is currently earning a 70 per centinterest in the Project by funding programmes to the value of €1.8 millionduring a three year period, under an option agreement with the property owner,Nueva Tharsis S.A.L., signed in June 2004. Formerly mined for pyrite (iron sulphide) only, the La Zarza deposit alsocontains substantial amounts of gold, copper and silver mineralization.Ormonde's focus is on the following resources inferred by a previous operator:5.9 Mt grading 5.0 g/t gold and 50 g/t silver (950,000 ounces of gold, 9.5million ounces of silver), and an adjacent copper resource of 2.9 Mt grading 2.8% copper (81,000 tonnes of copper). These resources are hosted by the"Silicatado" rock type. Enquiries to: Kerr Anderson, Managing Director, Ormonde Mining plc Tel: +353 (0)46 9073623 Fraser Gardiner, Investor and Media Relations, Ormonde Mining plc Mobile: +353 (0)86 3931178 Simon Rothschild, Bankside Consultants Tel: +44 (0)20 7367 8871 Mobile: +44 (0)7703 167065 ENDS BACKGROUND INFORMATION Ormonde Mining is quoted on the AIM and IEX markets in London and Dublin,respectively. The Company is focused on acquiring and developing gold projectsin Spain where it has a strong local Spanish management team, supported by aBoard with extensive exploration expertise in the region and mine developmentexperience. For more information and contact details including email, please visitwww.ormondemining.com. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
16th Sep 20165:23 pmRNSHolding(s) in Company
23rd Aug 20163:05 pmRNSResult of AGM
28th Jun 20167:00 amRNSAnnual Financial Report
28th Jun 20167:00 amRNSDeclaration of Urgent Occupation - Approved
16th Jun 20167:00 amRNSFinal Results
15th Jun 20167:00 amRNSBarruecopardo Update
24th May 20167:00 amRNSDrilling Update
29th Feb 20167:00 amRNSBarruecopardo Update
14th Oct 20157:00 amRNSBarruecopardo Update
30th Sep 20157:05 amRNSBoard and Management Changes
30th Sep 20157:02 amRNSHalf Yearly Report
3rd Aug 20157:45 amRNSDr. Kerr Anderson
31st Jul 20151:30 pmRNSResult of AGM
27th Jul 20154:41 pmRNSHolding(s) in Company
26th Jun 201510:00 amRNSAnnual Financial Report
22nd Jun 20157:00 amRNSBarruecopardo - Closing of Oaktree Financing
17th Jun 20157:00 amRNSFinal Results 2014
26th May 201510:36 amRNSReplacement Form 38.5a Ormonde Mining Plc
26th May 20157:00 amRNSForm 38.5a Ormonde Mining Plc
20th May 201510:17 amRNSForm 38.5a Ormonde Mining
19th May 201512:24 pmRNSResult of EGM
19th May 20159:57 amRNSForm 38.5a Ormonde Mining Plc
15th May 20155:51 pmRNSHolding(s) in Company
15th May 201511:23 amRNSForm 38.5a Ormonde Mining Plc
14th May 20155:15 pmRNSForm 8.3 - Ormonde Mining Plc
14th May 20153:25 pmRNSForm 8.3 - Ormonde Mining
14th May 20152:21 pmRNSForm 8.3 - Ormonde Mining PLC
14th May 201512:39 pmRNSForm 8.3 Ormonde Mining PLC
14th May 201510:19 amRNSForm 38.5a Ormonde Mining Plc
13th May 201510:23 amBUSForm 38.5 (b) - Ormonde Mining Plc
12th May 20159:42 amRNSForm 38.5a Ormonde Mining Plc
11th May 201510:26 amBUSForm 38.5 (b) - Ormonde Mining Plc
7th May 201510:02 amRNSForm 38.5a Ormonde Mining Plc
6th May 20151:17 pmRNSForm 8.3 - Ormonde Mining Plc
6th May 20151:17 pmRNSForm 8.3 - Ormonde Mining Plc
6th May 20151:14 pmRNSForm 8.3 - Ormonde Mining Plc
6th May 20151:05 pmRNSForm 8.3 - Ormonde Mining Plc
5th May 20152:42 pmRNSForm 38.5a Ormonde Mining
1st May 201510:34 amRNSForm 38.5a Ormonde Mining Plc
30th Apr 20159:58 amRNSForm 38.5a Ormonde Mining Plc
29th Apr 201510:38 amRNSForm 38.5a Ormonde Mining Plc
29th Apr 20157:00 amRNSBoard Response to Indicative Non-Binding Proposals
29th Apr 20157:00 amRNSProject Financing
27th Apr 20159:44 amRNSForm 38.5a Ormonde Mining Plc
23rd Apr 201510:51 amRNSForm 38.5a Ormonde Mining Plc
22nd Apr 201510:04 amRNSForm 38.5a Ormonde Mining Plc
21st Apr 201510:09 amRNSForm 38.5a Ormonde Mining Plc
20th Apr 201510:07 amRNSForm 38.5a Ormonde Mining Plc
17th Apr 201510:24 amRNSForm 38.5a Ormonde Mining Plc
16th Apr 201510:21 amRNSForm 38.5a Ormonde Mining Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.