Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Report

28 Oct 2008 07:00

RNS Number : 6901G
Ormonde Mining PLC
28 October 2008
 



Ormonde Mining plc

New High Grade Drilling Result of 20 Metres Grading 1.2% Tungsten at Barruecopardo

DUBLIN & LONDON28 October 2008 Ormonde Mining plc ("Ormonde" or the "Company") is pleased to report very encouraging results from the completion of drilling on the first infill cross section at its Barruecopardo Tungsten Project in SalamancaSpain (the "Project").

Highlights

New infill drill hole (BAR-48) has returned the best interval in terms of thickness and grade intersected to-date at the Project, 20 metres grading 1.2% WO3.

This intersection has an estimated true thickness of 16 metres, and includes the highest individual one-metre sample grade recorded at the Project of 7.8% WO3.

The intersection lies 20 metres below the base of the existing open pit in an area currently planned for initial mining.

This hole, together with hole BAR-47 previously reported on 6 October, completes the drilling on cross section 9560, with the results of both holes depicted on the accompanying figure.

The new results build on previously reported initial infill drilling results to support the Company's interpretation of the Project's main resource zone, the Filon Principal Zone, with widths and grades of tungsten mineralisation in line with previous widely spaced drilling.

Kerr Anderson, Managing Director, said:

"The infill drilling continues to impress us, with these new results including some truly spectacular tungsten grades."

New Drilling Results

Hole

From (m)

Width (m)

True Width (m)

WO3%

Zone

Infill drilling

BAR-48

146.0

20.0

16.0

1.20

FP

Zone codes:

FP = Filon Principal Zone

A drill plan and cross section showing the situation of BAR-48 is included in the pdf version of this announcement posted at www.ormondemining.com/news/press.html. Drill hole BAR-48 was drilled under the main open pit to test the thick Filon Principal Zone, on the same infill section as BAR-47 (reported on 6th October 2008), and between previous holes BAR-26B and BAR-35. BAR-48 compares very favourably to these surrounding drill holes which had returned the following results:

Hole

From (m)

Width (m)

True Width (m)

WO3%

Zone

Infill drilling

BAR-47

168.0

51.0

33.8

0.27

FP

Including

205.0

10.0

6.6

0.65

FP

Including

205.0

2.0

1.6

1.08

FP

Previous drilling

BAR-26B

138.0

67.0

49.0

0.30

FP

Including

138.0

7.0

5.5

1.10

FP

185.0

4.0

2.9

0.93

FP

203.0

2.0

1.5

1.87

FP

BAR-35

124.0

82.0

62.6

0.25

FP

Including

141.0

5.0

3.8

0.89

FP

160.0

2.0

1.5

4.48

FP

190.0

1.0

0.8

2.11

FP

The infill results received to-date therefore continue to be in line with expectations and support the view that this zone could be amenable to either bulk mining or higher grade selective mining methods.

Technical Notes:

BAR-48 - Assays are reported using the fusion XRF method.

In estimating mineral resources Ormonde currently applies an upper cut of 2.5% to all high grade assays.

Kerr Anderson PhD EurGeol PGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, March 2006, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/invest/glossary.html.

Enquiries to:

Ormonde Mining plc

Kerr Anderson, Managing Director,

Fraser Gardiner, Director

Tel: +353 (0)46 9073623

Bankside Consultants

Simon Rothschild / Louise Mason Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

Davy (Nomad / IEX Adviser)

Fergal Meegan Tel: +353 (0)1 6796363

Brewin Dolphin (UK Adviser)

Alexander Dewar Tel: +44 (0)131 529 0276

ENDS

About Tungsten

Tungsten is most frequently used as tungsten monocarbide, which has a hardness close to diamond, in cemented carbides. The principal tungsten applications include its use in cutting steels and in tungsten alloys, electronics, and chemical products.

Prices of tungsten concentrates are expected to remain buoyant for the long term, and are currently quoted by the Metal Bulletin in the range $160-$180 per metric tonne unit. A metric tonne unit is equal to 10kg of WO3, which equates to 1.0% contained WO3 in the rock. More information can be found on Ormonde's tungsten information page at http://www.ormondemining.com/about-tungsten/index.html

About Ormonde

Ormonde Mining plc is quoted on the AIM in London and the IEX in Dublin. Ormonde is a mineral development and exploration company focused on Spain, with the objective of developing mining projects and taking them into production.

For more information please visit www.ormondemining.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFEIFILSASEIS
Date   Source Headline
10th May 20077:01 amRNSSalamanca Drilling Update
28th Feb 20077:01 amRNSSalamanca Drilling Results
19th Feb 20077:01 amRNSLa Zarza drilling results
30th Jan 20077:01 amRNSLa Zarza Project Update
26th Jan 200712:41 pmRNSHolding in Company
23rd Jan 20077:01 amRNSSalamanca Tungsten Update
11th Jan 200711:42 amRNSDirectorate Change
9th Jan 20077:01 amRNSTungsten Update
5th Jan 200711:38 amRNSHolding in Company
20th Nov 20067:01 amRNSDrilling Update
27th Oct 20064:20 pmRNSGrant of Options
23rd Oct 20064:03 pmRNSHolding in Company
18th Oct 20065:29 pmRNSIEX Notice
13th Oct 200611:29 amRNSHolding in Company
9th Oct 20062:40 pmRNSBrochure of Particulars
9th Oct 20067:00 amRNSTungsten Project Update
28th Sep 20067:54 amRNSInterim Results
26th Sep 20067:01 amRNSDrilling Update
4th Sep 20067:01 amRNSLa Zarza Copper-Gold Project
1st Sep 20065:03 pmRNSHolding in Company
1st Sep 20064:50 pmRNSHolding in Company
15th Aug 200612:46 pmRNSInterest in Share Capital
9th Aug 20065:24 pmRNSAdditional Listing
16th Jun 20065:07 pmRNSHolding in Company
16th Jun 200612:58 pmRNSResult of AGM and EGM
25th May 20068:41 amRNSDocument Availability
24th May 20064:38 pmRNSHolding in Company
12th May 20064:00 pmRNSPlacing Raising StgGBP3.04 m
8th May 200612:12 pmRNSHolding in Company
8th May 20067:01 amRNSPreliminary Results
2nd May 20067:01 amRNSSalamanca Update
24th Apr 20067:01 amRNSResource Update
28th Feb 20067:02 amRNSTungsten Project Option
16th Feb 20067:01 amRNSDrilling Report
26th Jan 20067:01 amRNSSalamanca Gold Project Update
16th Jan 20067:00 amRNSDrilling Results and Update
6th Jan 20064:02 pmRNSHolding in Company
9th Dec 20054:42 pmRNSRe: Holding in Company
8th Dec 20057:00 amRNSAwards Granted
14th Nov 20057:01 amRNSLa Zarza Testwork Update
12th Oct 20057:00 amRNSDirectorate Change
26th Sep 20057:01 amRNSInterim Results
1st Sep 20057:00 amRNSDirectorate Change
15th Aug 20057:30 amRNSDrilling Report
13th Jul 20057:30 amRNSDrilling Report
27th Jun 20051:36 pmRNSIEX Notice
23rd Jun 20051:05 pmRNSAdditional Listing
2nd Jun 20057:01 amRNSDrilling Update
27th May 200511:46 amRNSDirectorate Change
10th May 20059:30 amRNSDrilling Report-Replacement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.