Drilling Update

26 Apr 2016 07:00

RNS Number : 2822W
North River Resources Plc
26 April 2016
 

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining

North River Resources plc ("North River" or the "Company")

Latest resource drilling results: including an intersection of 35.7 metres (true width of 9 metres) at 33.8% zinc

North River Resources plc, the AIM quoted resource company, wishes to provide an update on its ongoing underground diamond drilling programme at its flagship Namib Project in Namibia.

Highlights

· Drill results from the Northern Orebody continue to show significant intersection of mineralisation

· A high grade intersection of 35.7 metres (true width of 9 metres) at 33.8% zinc adding further confirmation of mineralisation 80 metres below level 5 in the North

· 3,800 metre drilling programme progressing well, but time lost to date with lower than forecast rig availability is putting drill completion date of end June 2016 at risk

· 5 Level 300m development tunnel completed on schedule in March

Details of the current drilling programme

The drilling programme to test extensions at depth in the North and South orebodies of the Namib resource is in progress. The contracted Diamec rig continues to be used for longer drill holes (up to 200 metres) from the 5 Level development drive, below the current North resource, while the Company's own Kempe drill continues with shallower (up to 80 metres) infill and extension targets in both North and South.

Reliability issues with both drill rigs have put pressure on the scheduled completion of the campaign by end June 2016 but this is being addressed with improved maintenance capability on each shift and additional critical spares at site. Completion of the development of the tunnel on 5 level in late March will also provide unrestricted access and therefore improved operating time for the rigs from now on.

Further to the drilling results announced on the 12th February and 21st of March 2016, the Company advises that 18 holes, totalling 1,767 metres, have been drilled to date on this 3,800 metre campaign. The results of the first eight holes have been reported previously and a further three holes are reported in Table 1 below. The remaining holes are awaiting sampling or assay results.

Significant mineralisation was intersected in two holes, which are highlighted below:

· NLDD069: 35.7m (true width of 9 metres) at 33.8% zinc

· NLDDK077: 3.8m (true width of 1.5 metres) at 10.6% zinc and 5.8m (true width of 2 metres) at 12.2% zinc and 10.9% lead

Assays are awaited for 3 additional holes (NLDDK078, NLDDK079 and NLDD070). These holes visually indicate mineralised intercepts, corroborated by XRF Niton analysis, but are expected to be at a lower grade since mineralisation is semi-massive and disseminated in some places.

More generally, the results reported to date indicate a continuation of mineralisation 80 metres below the existing Northern part of the orebody, providing growing support for the Company's confidence in delivering an increased resource estimate for the Namib project following completion of the drilling campaign.

The information in this release that relates to Exploration Results is based on information compiled by Mr. Galen White, Principal Geologist of CSA Global (UK) Ltd and a Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr White has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. White consents to the inclusion in this release, of matters based on his information, in the form and context which it appears.

North River CEO James Beams commented, "It is very pleasing to build on our confidence in the geological potential of the Namib project and I look forward to releasing further drilling results as we progress with the programme towards a larger resource base and longer mine life."

Figure 1: Long section of the Mine Looking North East

http://www.rns-pdf.londonstockexchange.com/rns/2822W_-2016-4-25.pdf

 

  

 

Table 1: Significant intercepts table

Location

Hole Type

Hole ID

NAT East

NAT North

NAT RL

Max depth (m)

Dip

Azimuth

From (m)

To (m)

Interval width (m)

True width (m)

Zinc %

Lead %

Silver ppm

Iron %

North

DD

NLDD069

475143.6

7509859.9

170.9

161.9

-46

225

100.1

135.9

35.7

9.0

33.8

0.1

46

20.3

North

DD

NLDDK077

475053.3

7509904.0

171.5

75.0

-27

229

47.6

51.3

3.8

1.5

10.6

0.2

10

18.6

North

DD

NLDDK077

475053.3

7509904.0

171.5

75.0

-27

229

60.8

66.6

5.8

2.0

12.2

10.9

157

28.3

North

DD

NLDD068

475143.6

7509859.6

170.8

92.8

-41

221

No significant intercepts

 

Significant Intercepts are based on the following criteria:

· Minimum intercept length: 3 metres

· Maximum internal waste: 1 metres

· Cutoff Lead/zinc combined: 1 %

· True thickness lengths were obtained by measuring intercepts manually from a perpendicular-to-dip sectional review. Lengths are approximate due to the variable nature of the lodes.

Appendix: Quality Assurance Quality Control of assay results

 

Diamond core samples were half core samples and are selectively sampled based on observable sulphide mineralisation. Approximately one metre of waste is sampled either side of mineralisation.

 

Samples were prepared and analysed for iron, lead and zinc at Bureau Veritas Namibia (Swakopmund). They were fused with sodium peroxide, dissolved in dilute HCL and analysed by Inductively Coupled Plasma (ICP) Optical Emission Spectrometry. Silver samples are dissolved in a multi acid digest and assayed by inductively Coupled Plasma (ICP) Optical Emission Spectrometry.

 

The Quality Assurance Quality Control (QAQC) programme included certified reference materials (CRMs) from African Mineral Standards (AMIS) in Johannesburg, South Africa; blanks and duplicate samples. QAQC results were monitored and where issues were noted, the laboratory is requested to re-assay the affected samples.

 

During the QAQC analyses for the results reported in Table 1 above, two failures in the lead and silver CRMs were reported. The lab was requested to re-assay these results and ten surrounding samples (five either side) for the failed elements were re-assayed. All failed CRMs passed after re-assay.

 

**ENDS**

For further information please visit www.northriverresources.com or contact:

James Beams

North River Resources Plc

Tel: +44 (0) 20 7025 7047

Andrew Emmott / Ritchie Balmer

Strand Hanson Limited

Tel: +44 (0) 20 7409 3494

Jonathan Williams / Kim Eckhof

RFC Ambrian Limited

Tel: +44 (0) 20 3440 6800

About North River Resources: North River Resources (AIM ticker: NRR) is a multi-asset mining exploration and development company with projects located in Namibia and Mozambique. The Company's primary focus is bringing its flagship Namib project into production. The Namib project is the restart of a high grade zinc-lead underground mine located in Namibia.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDELFLQZFZBBL
Date   Source Headline
25th Jan 20137:00 amRNSAppointment of Director
15th Jan 20139:00 amRNSAppointment of Non-Executive Director
7th Jan 20137:30 amRNSRestoration - North River Resources Plc
4th Jan 20135:00 pmRNSAppointment of NOMAD and Operational Update
31st Dec 20127:00 amRNSDirectorate Change
5th Dec 20127:30 amRNSSuspension - North River Resources plc
29th Nov 20127:00 amRNSResignation of Nominated Adviser
29th Oct 20127:30 amRNSChange of Joint Broker
10th Oct 20128:40 amRNSMaiden JORC Resource at Namib Lead-Zinc Project
8th Oct 20127:00 amRNSSchedule 2 (g) Disclosure
28th Sep 20127:00 amRNSInterim Results
6th Sep 20127:00 amRNSNew Namibian Gold & Rare Earth Licences
30th Aug 20127:00 amRNSNamib - project update and channel sample results
9th Jul 20124:39 pmRNSDirector's Dealing
29th Jun 20122:30 pmRNSResult of AGM
8th Jun 20123:06 pmRNSDirectorate Change
22nd May 20127:00 amRNSFinal Results
16th Apr 20127:00 amRNSProgress update at the Namib Lead and Zinc mine
10th Apr 20127:00 amRNSMonte Muande Update
8th Mar 20127:00 amRNSMetallurgical Results from Namibian Copper Project
2nd Mar 20128:30 amRNSCommencement of Drilling at Uis Uranium Project
28th Feb 20127:00 amRNSMonte Muande Update
8th Feb 20127:00 amRNSUpdate on Nuclear Fuels Agreement
2nd Feb 20127:00 amRNSResource Update at Malachite Pan and Koperberg
18th Jan 20127:00 amRNSUpdate on Nuclear Fuels Agreement
13th Jan 20121:00 pmRNSDrilling Results from Tsawichas Prospect
10th Oct 20117:00 amRNSGold Anomalies Identified at Ubib Project
21st Sep 20117:00 amRNSHigh Grade Mineralisation Identified at Namib
19th Sep 20117:00 amRNSMonte Muande Update
7th Sep 201111:30 amRNSAppointment of Joint Broker
5th Sep 20117:00 amRNSInterim Results
22nd Aug 20117:00 amRNSFurther High Grade Mineralisation-Namib Lead/Zinc
19th Jul 20119:04 amRNSUpdate on Namibian Copper and Gold Projects
12th Jul 20117:00 amRNSHigh Grade Intersections at Namib Lead/Zinc
10th May 20111:15 pmRNSResult of AGM
11th Apr 20117:00 amRNSOperations Update & Placing to Raise £3 Million
1st Apr 20119:30 amRNSUpdate on Agreement over Nuclear Fuels Licences
30th Mar 20114:10 pmRNSPosting of Report & Account and Notice of AGM
21st Mar 20117:00 amRNSMonte Muande Exploration Target & Progress Update
21st Mar 20117:00 amRNSMONTE MUANDE JV: EXPLORATION TARGET
11th Mar 20117:00 amRNSFinal Results
17th Feb 201110:00 amRNSGrant of New EPLs in Namibia
2nd Feb 20119:00 amRNSHeads of Agreement signed with Jacana Resources
31st Jan 20117:00 amRNSMozambique Update
19th Nov 201012:10 pmRNSResult of AGM
15th Nov 20107:00 amRNSHeads of Agreement signed with Baobab Resources
4th Nov 20107:00 amRNSCompany Update Presentation
27th Oct 20107:00 amRNSNotice of AGM
27th Oct 20107:00 amRNSNotice of AGM
25th Oct 20107:00 amRNSOperations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.