Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNew World Oil And Gas Regulatory News (NEW)

  • There is currently no data for NEW

Operations Update

10 Dec 2012 07:00

RNS Number : 0874T
New World Oil & Gas
10 December 2012
 



New World Oil and Gas Plc / Index: AIM / Epic: NEW / Sector: Oil & Gas

10 December 2012

New World Oil and Gas Plc ('New World' or the 'Company')

Operations Update

 

New World Oil and Gas Plc, an oil and gas exploration and development company focused on Belize and Denmark, is pleased to provide an update on operations across its portfolio of highly prospective exploration projects.

 

Belize

B Crest Prospect, Blue Creek Project located in the productive Petén Basin

·; Presence of a working hydrocarbon system confirmed by results of the Blue Creek #2 well ('Blue Creek#2')

·; 45% and 65% oil saturation in the lower Cretaceous Dolomites of the Y3 and Hill Bank formations following petrophysical interpretation of open-hole logs

·; Currently drilling a deviated well, the Blue Creek #2A ST ('the Well'), targeting potential commercial oil accumulation up structure above the interpreted oil water contact

·; The Well will be drilled to an angle of 35 degrees relocating the bottom hole location of Blue Creek #2 by some 4,535 feet to the SSE and up-structure 300 feet

o As at 7 December 2012, the Well is at 4,500 feet Measured Depth ('MD')

·; The Directors believe the chances of discovering a commercial oil accumulation at B Crest have materially increased due to:

o targeting oil bearing formations seen in the vertical well, Blue Creek#2, and drilling 300 feet up-structure

o observing on seismic an enlarging wedging or thickening effect of Y3 and Hill Bank formations up-structure where the Company believes a significant trap exists

o relocating above the interpreted oil water contact to maximise chances of obtaining commercial flow rates during planned testing operations

·; The proposed total depth ('TD') of the Well is 10,880 feet MD and is expected to be reached on or about the end of 2012

Denmark

Licence 1/09 - Danica Jutland located in the highly prospective Jutland on-shore area in South Western Denmark

·; Acquiring 75km2 of 3D seismic over Jensen, a Zechstein oil prospect, which, as reported in the Admission CPR has a prospective resource estimate of 48MMbo (adjusted to an 80% working interest)

·; Seismic operations began mid-November 2012 and are scheduled to be completed by 14 January 2013

·; Recent cold weather has greatly assisted in acquiring quality data

·; Results of processing and interpretation expected mid-February

 

Licence 1/08 - Danica Resources located in the productive Western Baltic region of the South Permian Basin in Southern Denmark

·; 2D seismic completed September 2012 - currently in the final stages of interpretation

·; CPR update expected before the end of 2012

·; Based on the results a decision will be made by the Company and its partners, Danica Resources ApS and the North Sea Fund, on whether to acquire additional 2D and or 3D seismic, or to propose drilling the Als prospect which has estimated gross (100% working interest basis) P50 resources of 97 million barrels of oil and 1.401 TCF of gas

 

CEO William Kelleher said, "We are extremely encouraged by the results of our efforts across our portfolio to date. We believe our chances of making a commercial discovery in Belize have greatly improved, which we should be in a position to confirm in the weeks to come. Our de-risking programme at both licences in Denmark remains on track and we will shortly be able to decide on the best way forward at each project. These are very exciting and busy times for New World and I can assure all our shareholders that the management of the company is working tirelessly on all fronts, as we work towards our objectives of making a hydrocarbon discovery and building value. I look forward to updating the market on our progress as and when new developments arise."

 

Further information on drilling operations at Blue Creek

The Blue Creek #2 well commenced drilling operations on 27 September 2012, and reached the initial target depth (TD) of 7,000 feet in mid-October. Following a review of the mud logs, it was clear that the initial targets in the Y1 and Y2 intervals did not contain significant oil shows that would warrant further analysis. The results in these intervals indicated moderate petroleum odour and oil stained rock, which the Company believes is due to either late trap development or early trap breech.

 

Given the initial TD was reached far ahead of schedule and under budget, a decision was taken to continue drilling to the Y3 and base of the Hill Bank, thus fulfilling one of the requirements of the work programme in the farmout agreement with Blue Creek Exploration Ltd. The Company managed to drill to 10,490 feet for a total cost of approximately US$4 million, over US$1.6 million under budget.

 

As announced on 29 November 2012, promising oil shows were observed while drilling into the Y3 and Hill Bank formations based on live oil present on the shakers while drilling and circulating, as well as the presence of oil and gas recorded by the mud logs. In addition, the open-hole logs calculated a petrophysical interpretation which resulted in oil saturation in the lower Cretaceous Dolomites of the Y3 and Hill Bank of between 45% and 65%. The Company understood that drilling into the Y3 and Hill Bank from the location of the Blue Creek #2 well would be structurally low. The results, however, confirmed the presence of a working hydrocarbon system. Given the water content in these reservoirs is relatively high at this location, at an average of 50%, the Company chose not to run casing and not to put the well on test.

 

In consultation with its geological and geophysical team, drilling management, partners, and the Government of Belize, New World decided to drill a deviated well 'sidetracking' from a depth of 3,000 feet. The underlying reason behind the decision to drill 'up-dip' or 'up-structure' was to relocate the well above the interpreted oil water contact, while at the same time drilling closer to the NE to SW bounding fault. The Company believes that a significant trap exists up-structure, and that logically the live oil shows are a reflection of oil migration that has slowed down as a result of such a trap.

 

The technical content of this announcement has been reviewed and approved by William Kelleher who has been a member of the Society of Petroleum Engineers for 28 years, as well as the Government of Belize.

* *ENDS* *

 

For further information please visit www.nwoilgas.com or contact:

Enquiries:

 

William Kelleher

New World Oil and Gas Plc

Tel: +1 713 447 2171

Georges Sztyk

New World Oil and Gas Plc

Tel: +1 646 407 9946

Peter Sztyk

Felicity Geidt

New World Oil and Gas Plc

Beaumont Cornish Limited

Tel: +1 917 215 7122

Tel: +44 (0) 20 7628 3396

Roland Cornish

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Jerry Keen

Shore Capital

Tel: +44 (0) 20 7408 4090

Pascal Keane

Shore Capital

Tel: +44 (0) 20 7408 4090

Hugo de Salis

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

Lottie Brocklehurst

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

Frank Buhagiar

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

 

Notes

New World Oil and Gas Plc is an oil and gas operating company with three highly prospective projects in Belize and Denmark. New World is operator of all three projects where a systematic programme of seismic acquisition has resulted in multiple prospects being identified and derisked, a number of which have been classified by the Competent Person as being drill ready. Blue Creek in Belize is the Company's most advanced project where drilling operations are currently underway at the B Crest prospect. New World also operates two projects in onshore Denmark located in producing basins covering a combined area of over 2.6 million acres, making it the largest holder of acreage in Denmark.

 

Management is constantly evaluating additional projects that would complement the Company's growing portfolio, particularly late stage exploration or early production projects located in basins with large proven reserves that, in the opinion of the Directors, are undervalued, underdeveloped or under-performing. As a result, the Board is actively identifying exploitation opportunities in areas including Africa, South America and South East Asia as it looks to build a leading, diversified oil and gas company.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDBBDDIXGBGDR
Date   Source Headline
20th Oct 200811:26 amRNSRule 8.1 Newcourt Group Plc
17th Oct 20089:49 amRNSRule 8.1 Newcourt Group Plc
15th Oct 200811:44 amRNSRule 8.1 Newcourt Group plc
14th Oct 200811:14 amRNSRule 8.1/8.3 Newcourt Group Plc
13th Oct 20089:54 amRNSRule 8.1 Newcourt Group plc
10th Oct 200810:36 amRNSRule 8.1/8.3 Newcourt Group Plc
9th Oct 20089:01 amBUSStatement re Possible Offer
16th Sep 20084:20 pmBUSHolding(s) in Company
2nd Sep 20087:00 amBUSHalf-yearly Report
1st Sep 200811:44 amBUSHolding(s) in Company
26th Aug 20084:54 pmRNSHolding in Company
27th Jun 20081:00 pmBUSDirectorate Change
27th May 200810:11 amBUSAGM Statement
16th May 20083:08 pmBUSStatement re Annual Report and Accounts
13th May 20087:00 amBUSStatement re Ely Property Acquisition
10th Apr 20087:00 amBUSEly Property Agrees to Acquire UK Student Accommodation Site
7th Apr 20087:00 amBUSFurther re Grant of Options
2nd Apr 20089:28 amBUSStatement re Grant of Options
11th Mar 20087:00 amBUSFinal Results
25th Feb 20088:50 amBUSAcquisition
18th Feb 20089:17 amBUSHolding(s) in Company
1st Feb 20087:00 amBUSNewcourt Subsidiary, Ely Property, Acquires BHE Limited
1st Feb 20087:00 amBUSHolding(s) in Company
18th Jan 200810:20 amBUSHolding(s) in Company
23rd Nov 20077:00 amBUSAcquisition
9th Nov 20074:55 pmBUSHolding(s) in Company
9th Nov 20074:45 pmBUSHolding(s) in Company
9th Nov 20077:00 amBUSAcquisition of Facilities Management Business
26th Oct 20077:01 amRNSConversion of Securities
10th Oct 20077:00 amBUSHolding(s) in Company
19th Sep 20077:00 amBUSHalf-yearly Report
19th Sep 20077:00 amBUSNewcourt Group Plc Interim Results
3rd Sep 20077:43 amBUSEly Property to bring to market entire Cityquarter residential development at Athlone Towncentre
21st Aug 20072:32 pmRNSHolding(s) in Company
17th Aug 20076:13 pmRNSAIM Rule 26
27th Jul 20077:00 amBUSNotice of Results
19th Jul 20072:11 pmBUSResult of EGM
17th Jul 200710:08 amRNSShare Issue - amend
17th Jul 200710:05 amRNSShare Issue - amend
16th Jul 20074:47 pmRNSShare Issue
16th Jul 20074:33 pmRNSShare Issue
11th Jul 20077:00 amBUSEly Property Group Acquires 605 Student Accommodation Beds
11th Jul 20077:00 amBUSStatement re Ely Property Acquisition
26th Jun 20075:04 pmBUSNewcourt Group plc : Notice of EGM
26th Jun 20075:04 pmBUSNotice of EGM
26th Jun 200710:42 amBUSHolding(s) in Company
7th Jun 200712:44 pmBUSAldborough House Images (Graphic: Business Wire)
7th Jun 200712:40 pmBUSEly Property acquires 100% interest in Aldborough Developments Ltd.
7th Jun 200712:40 pmBUSEly Property Group Secures Planning Consent for Day-Care Hospital in Dublin City Centre
29th May 20072:01 pmBUSAGM Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.