Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMXP.L Regulatory News (MXP)

  • There is currently no data for MXP

Operational Update

1 May 2013 07:00

RNS Number : 6789D
Max Petroleum PLC
01 May 2013
Β 

ο»Ώ

Max Petroleum Plc

(the "Company")

Β 

Operational Update

Β 

Successful Development Well in Zhana Makat

Drilling of Baichonas West Appraisal Well

Production Update

Regulatory Update

Β 

1 May 2013

Β 

Max Petroleum Plc, an oil and gas exploration and production company focused on Kazakhstan, is pleased to announce a drilling and operational update regarding its activities in the Blocks A&E Licence in Western Kazakhstan (the "Licence").

Β 

Zhana Makat Field

Β 

The ZMA-E5 development well in the Zhana Makat Field has successfully reached a total depth of 871 metres, encountering hydrocarbons in Jurassic sandstone reservoirs in line with expectations. The Company plans to complete the well and then place it on production as soon as practicable. The Zhanros ZJ-20 rig will now move to drill the ZMA-E6 development well in the Zhana Makat Field before moving to Block A to drill the Uytas North Prospect, targeting resource potential of 11 million barrels of oil ("mmbo") with a current geological chance of success of 24%.

Β 

Baichonas West Field

Β 

The Company has spudded the BCHW-2 well, the first appraisal well in the Baichonas West Field, which was discovered in September 2012. The initial results of logging and production testing of the BCHW-1 well indicated a commercial discovery with oil in place of approximately 16 mmbo from Jurassic reservoirs with an expected recovery factor of between 20% and 40%. The BCHW-2 well will be drilled with a ZJ-30 rig from our drilling contractor Zhanros Drilling LLP, to a depth of approximately 1,400 metres.

Β 

Sagiz West Field

Β 

After drilling the BCHW-2 well, the Company will move the ZJ-30 rig to drill the SAGW-4 appraisal well in the Sagiz West Field. Preliminary mapping of recently acquired high-fold 3D seismic data has confirmed the location of SAGW-4, four km south of the SAGW-3 well, as prospective. If successful, the new well will substantially extend the known productive area of the field. The results of the SAGW-4 well, together with the new seismic data, will be crucial in evaluating a significant portion of the 79.8 mmbo of in-place contingent resources in the field, as well as assisting the Company in the design of the future appraisal and development plan for the field.

Β 

Uytas Field

Β 

The Company is currently tendering for a third shallow drilling rig to conduct a 13-well appraisal programme for the Uytas Field. These wells, which will vary in depth between 200 and 550 metres, will appraise a significant portion of the 27.2 mmbo of conventional in-place contingent resource potential in the field and assist in preparation of a full-scale development plan.

Β 

Production Update

Β 

Total production during the fiscal year ended 31 March 2013 averaged 3,346 barrels of oil per day ("bopd"), an increase of approximately 19% from average production of 2,807 bopd in the prior year. This increase is in line with the Company's guidance that production would average between 3,200 and 3,600 during this period. For the current fiscal year ending 31 March 2014, it is expected that production will average between 4,500 and 6,000 bopd.

Β 

Regulatory Update

Β 

The Ministry of Oil and Gas of the Republic of Kazakhstan ("MOG") has progressed the final ratification of the two-year extension of the exploration period of the Company's Licence (the "Appraisal Extension"), which is now expected in May 2013. The approval of the Appraisal Extension is the single remaining requirement for the Company to convert the Asanketken Field to trial production status and resume continuous production from all four wells in the field in order to gather the required technical data to progress Asanketken to full field development status during 2014. The Company has already received a gas flaring permit for the field and expects to resume production during May 2013 with a combined productive capacity in excess of 2,000 bopd from the Asanketken wells.

Β 

Michael Young, President and CFO, commented:

"It is positive to have two drilling rigs in operation with a third coming into play in the near future. The near term drilling programme will allow us to further evaluate Baichonas West, Sagiz West and Uytas, as well as test the Uytas North Prospect. These are all important milestones in this year's post-salt drilling programme, with the results of the SAGW-4 well being the most significant. Moving Asanketken onto trial production will also add a substantial boost to our current production rate of 2,200 bopd from Zhana Makat."

Β 

Enquiries:

Β 

Max Petroleum Plc

Β 

Β 

Michael Young

President and Chief Financial Officer

Tel: +44 (0)207 355 9590

Β 

Tom Randell

Director of Investor Relations

Β 

College Hill

Β 

David Simonson / Anca Spiridon

Tel: +44 (0)207 457 2020

WH Ireland Ltd

Β 

Daniel Bate / Katy Mitchell

Tel: +44 (0)161 832 2174

Β 

Macquarie Capital

Steve Baldwin /Β Nicholas Harland

Β 

Tel: +44 (0)203Β 037 2000

Oriel Securities

Michael Shaw / Ashton Clanfield

Tel: +44 (0)207Β 710 7600

Β 

Β 

Β 

Richard Hook, Chief Operating Officer of Max Petroleum Plc, is the qualified person that has reviewed and approved the technical information contained in this announcement. Mr. Hook is a member of the Houston Geological Society and holds both Masters and Bachelors of Science degrees in geology.

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLQBLFXXZFEBBE
Date   Source Headline
7th Dec 20115:10 pmRNSNotification of Interest
5th Dec 20117:00 amRNSDrilling Update
24th Nov 20117:00 amRNSDrilling Update
21st Nov 20117:00 amRNSProduction Update
14th Nov 20117:00 amRNSInterim Results
4th Nov 20117:00 amRNSDrilling Update
2nd Nov 20117:00 amRNSDrilling Update
21st Oct 20118:08 amRNSOperational Update
11th Oct 20117:00 amRNSDrilling Update
10th Oct 20118:26 amRNSDrilling Update
6th Oct 201110:00 amRNSSupreme Court of Kazakhstan Tax Case Ruling
5th Oct 20112:30 pmRNSDrilling Update
30th Sep 201112:30 pmRNSTotal Voting Rights
30th Sep 201112:28 pmRNSHoldings in Company
29th Sep 201111:37 amRNSResults of Annual General Meeting
29th Sep 20117:00 amRNSProduction Test Results
23rd Sep 20119:12 amRNSExercise of warrants
22nd Sep 201110:32 amRNSDrilling Update
21st Sep 20117:00 amRNSHolding(s) in Company
20th Sep 20117:00 amRNSDrilling Update
19th Sep 20117:00 amRNSExercise of Options
15th Sep 20117:00 amRNSDeep Rig Mobilisation
12th Sep 20117:00 amRNSNew discovery
12th Sep 20117:00 amRNSDrilling Update
5th Sep 20117:00 amRNSDrilling Update
30th Aug 20117:00 amRNSDrilling Update
24th Aug 20117:01 amRNS2011 Annual Report & Accounts and Notice of AGM
24th Aug 20117:00 amRNSOperational Update
15th Aug 20117:00 amRNSDrilling Update
8th Aug 20117:00 amRNSSuccessful Uytas Confirmation Well
8th Aug 20117:00 amRNSNew Oil Discovery
20th Jul 20117:09 amRNSProduction Update
18th Jul 20117:00 amRNSOperational Update
18th Jul 20117:00 amRNSSenior Vice President of Engineering Appointment
12th Jul 20118:52 amRNSOperational Update
11th Jul 20117:00 amRNSProduction Test Results
4th Jul 20117:00 amRNSOperational Update
13th Jun 20117:00 amRNSDrilling Update
6th Jun 20117:00 amRNSOperational Update
23rd May 20117:00 amRNSDrilling Update
16th May 20117:00 amRNSDrilling Update
12th May 20117:00 amRNSDrilling Update
28th Apr 201111:27 amRNSTotal Voting Rights
28th Apr 20117:00 amRNSCourt of Cassation Tax Case Ruling
26th Apr 20117:48 amRNSExecution of Drilling Contract
26th Apr 20117:00 amRNSDrilling Update
12th Apr 20117:00 amRNSExercise of Options
11th Apr 20117:00 amRNSChanges to Advisory Committee
8th Apr 20117:00 amRNSExercise of Warrants
1st Apr 20117:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.