Semenovsky Tailings Project & receipt of assays

4 Jul 2016 07:00

RNS Number : 0659D
Eurasia Mining PLC
04 July 2016
 

 

Eurasia Mining plc (AIM: EUA) 

("Eurasia" or the "Company") 

Semenovsky Tailings Project update and receipt of assays

Eurasia Mining plc,("Eurasia") the Russia focused PGM and gold production and development company, here working in partnership with Metal Tiger plc ("MTR"), is pleased to update progress from the Semenovsky Tailings Project (STP), most importantly the receipt of assay results from the 2016 metallurgical drilling programme.

As reported in RNS dated 26 April 2016, a drilling programme was carried out on site and the samples sent to SGS Chita for assay and subsequent metallurgical analysis. The testing program is considered in three phases. Phase 1a, fire assay of samples, phase 1b, bottle-roll cyanide-leach testing, and phase 2, optimisation of leach variables. The assay results returned for the 54 samples collected in phase 1a are in line with previous estimates, and the grades used previously in Eurasia's resource calculations. This work is a necessary step in planning the design of the processing plant, as well as confirming the grade of the tails and the reliability of previous workers sampling.

Highlights:

· 54 fire assay results returned from SGS laboratories Chita, return an average grade of 1.16 g/t gold and 17.3 g/t silver.

· Results are in line with expected values obtained from previous sampling programmes, lending additional support to reserve calculations

· These grades are high for tailings, providing a robust project for re-treatment and recovery of gold.

The depth of the tailings dam varies from six to eleven metres on average and this recent sampling program was designed to test the complete column of sands through to underlying clays below the tailings foundation. 5 drill holes were evenly spaced over the 1.5km2 tailings dam. Results are tabulated in full below. The sands were logged and individually bagged on site in Semenovsky by Eurasia geologists. Gold values are obtained by fire assay with an atomic absorption analysis finish and the silver values by atomic absorption method.

Separately, a reserves report was submitted to local authorities on the 30th May 2016 and this is continuing through the normal approvals process at the Bashkirian Ministry for Subsoil use.

Christian Schaffalitzky, Managing Director at Eurasia Mining comments "We are pleased to have independent verification of grade at the Semenovsky Tailings Project. Having worked in Russia for many years we are familiar with the excellent standard of Russian geological assessments and have complete faith in the Russian system of mineral resource definition but working in partnership with MTR, are duty bound to provide normal due diligence confirmation. We now look forward to results of gold recovery tests which will allow us to refine the design of the process plant and optimize the mining operation."

Consent for release

EurGeol Christian Schaffalitzky, FIMMM, PGeo, MIEI, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the purposes of the reporting of these results.

 

 

Hole ID

Width (m)

Au, g/t

Ag, g/t

16 МЕТ-01-1

1

0.8

8.8

16 МЕТ-01-2

1

0.88

9.7

16 МЕТ-01-3

1

0.94

19.8

16 МЕТ-01-4

1

1.5

26.2

16 МЕТ-01-5

1

1.29

19.6

16 МЕТ-01-6

1

1.4

19.7

16 МЕТ-01-7

1

1.03

10.7

16 МЕТ-01-8

1

0.96

10.6

16 МЕТ-01-9/1

0.5

1.14

14.4

16 МЕТ-01-9/2

0.5

0.82

9.8

16 МЕТ-01-10/1

0.5

0.89

10.3

 

 

 

 

16 МЕТ-02-1

1

0.59

7.5

16 МЕТ-02-2

1

0.76

12.8

16 МЕТ-02-3

1

0.81

12.5

16 МЕТ-02-4

1

1.23

27.9

16 МЕТ-02-5

1

1.12

22.8

16 МЕТ-02-6

1

1.45

21.4

16 МЕТ-02-7

1

1.61

15.8

16 МЕТ-02-8/1

0.5

1.7

12.6

16 МЕТ-02-8/2

0.5

1.99

15.2

16 МЕТ-02-9

1

1.57

11.7

16 МЕТ-02-10/1

0.5

1.6

9.5

 

 

 

 

16 МЕТ-03-1

1

1.37

19.1

16 МЕТ-03-2

1

0.92

10.6

16 МЕТ-0З-З

1

1.33

13

16 МЕТ-03-4

1

1.04

25

16 МЕТ-0З-5

1

0.85

23.7

16 МЕТ-0З-6

1

1.15

19.3

16 МЕТ-03-7/1

0.5

0.94

17.7

16 МЕТ-03-7/2

0.5

0.98

9.4

 

 

 

 

16 МЕТ-04-1

1

1.04

15.2

16 МЕТ-04-2

1

1.84

21.8

16 МЕТ-04-3

1

1.98

30.2

16 МЕТ-04-4

1

1.66

30.3

16 МЕТ-04-5

1

0.94

20.4

16 МЕТ-04-6

1

0.98

14.9

16 МЕТ-04-7

1

0.96

9.6

 

 

 

 

16 МЕТ-05-1

1

1.04

26.9

16 МЕТ-05-2

1

1.14

8.4

16 МЕТ-05-3

1

0.84

20

16 МЕТ-05-4

1

0.73

24.6

 

 

 

 

Total metres

37

 

 

Width averaged gold grade g/t

1.16

 

Width averaged silver grade g/t

 

17.3

 

 

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDXLFBQDFBBBZ
Date   Source Headline
11th Oct 20192:40 pmRNSMOD Resources - Share Issuance to Metal Tiger
9th Oct 20199:15 amBUSMOD Resources Update - Scheme of Arrangement Becomes Effective
8th Oct 20197:16 amRNSMOD Resources-Court Approves Scheme of Arrangement
7th Oct 20198:30 amRNSKalahari Metals Limited - Drilling Progress Update
1st Oct 20197:19 amRNSMOD Resources Update - Results of Meetings
25th Sep 20197:00 amBUSUnaudited interim results for the six months ended 30 June 2019
23rd Sep 20197:00 amBUSKalahari Metals Limited Approval of EMP and Identification of Future Drilling Targets
16th Sep 201910:41 amBUSExercise of MOD Options
6th Sep 201910:52 amRNSCEO Interview
2nd Sep 20199:43 amBUSCompletion of Cobre Agreement and Perrinvale Operational Update
27th Aug 20199:34 amBUSMOD Resources T3 mine ESIA progresses to public review
27th Aug 20199:32 amBUSUpdate on Term Sheet with Cobre Pty Ltd
22nd Aug 20197:00 amRNSMOD Resources Update on Proposed Transaction
21st Aug 20197:01 amBUSMOD Resources Progress Update on the Proposed Sandfire Transaction
1st Aug 201912:24 pmBUSKalahari Metals Limited Exploration Update
29th Jul 201912:12 pmBUSPan Asia Metals – Reung Kiet Lithium Project Drilling and Trenching Results
26th Jul 20199:05 amRNSTerm Sheet signed with Cobre and Issue of Equity
25th Jun 20197:00 amRNSMOD Resources - Offer from Sandfire Resources
5th Jun 20194:16 pmBUSPosting of Annual Report and Notice of AGM
31st May 201911:00 amBUSFurther investment of US$1.1m in Kalahari Metals Limited
31st May 20197:00 amBUSAudited results for the year ended 31 December 2018 and Notice of Annual General Meeting
24th May 20197:00 amBUSHolding(s) in Company
23rd May 20197:00 amBUSKalahari Metals Limited Exploration Update
9th May 20199:26 amRNSAppointment of joint broker
7th May 20199:23 amBUSBotswana Copper Silver Project T3 Project & Regional Exploration Programme Plan
29th Apr 20197:00 amBUSBotswana Copper Silver Project T3 Infill Drilling Results
25th Apr 201911:15 amBUSSpain Winter 2018/19 Work Programme Update & Drilling Results
15th Apr 20197:00 amBUSKalahari Metals Limited Environmental Permitting Update
10th Apr 20197:08 amBUSKalahari Metals Limited Acquisition of Kitlanya Ltd
5th Apr 201911:48 amBUSIssue of Equity
4th Apr 20197:00 amBUSPan Asia Metals Commencement of Drilling Programme at Reung Kiet Lithium Project
3rd Apr 201911:13 amRNSKalahari Metals Limited - Environmental Permitting
29th Mar 20192:46 pmRNSStandard form for notification of major holdings
29th Mar 20192:46 pmRNSStandard form for notification of major holdings
28th Mar 20197:40 amBUST3 Feasibility Study Confirms High-Margin, Low-Capital Open Pit Copper Mine
25th Mar 20194:12 pmRNST3 Open Pit Reserve Increased to 34.4Mt
12th Mar 20199:07 amBUSHolding(s) in Company
12th Mar 20197:00 amBUSBotswana Copper Silver Project T3 Infill Drilling Results
11th Mar 20192:12 pmBUSKalahari Metals Limited Investment Update
11th Mar 20197:00 amBUS£2.0 million raised through Sprott Offering
7th Mar 20197:18 amBUSKalahari Metals Limited Exploration Update
15th Feb 20197:00 amBUSDirector Dealing
11th Feb 201911:37 amBUS£1.0 million Placing and Non-binding term sheet signed with Sprott to raise up to an additional £3.0 million
7th Feb 201912:36 pmBUSKalahari Metals Limited – High-Resolution Geophysics Identifies Drill-Ready Targets
31st Jan 20197:07 amBUSOn Market Sale MOD Resources Limited
29th Jan 20197:56 amBUSBotswana Copper Silver Project MOD JV Copper Project Quarterly Update
21st Jan 20199:15 amBUSMOD Resources A$15m Capital Raise and Non-Binding Offer Received by MOD
20th Dec 20187:00 amBUSBotswana Copper Silver Project A4 Dome Drilling Update
14th Dec 201811:31 amBUSBotswana Copper Silver Project – Prospecting Licences Extended & Transferred
10th Dec 20187:00 amBUSBotswana Copper/Silver Project T23 Dome Exploration Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.