Semenovsky Tailings Project & receipt of assays

4 Jul 2016 07:00

RNS Number : 0659D
Eurasia Mining PLC
04 July 2016
 

 

Eurasia Mining plc (AIM: EUA) 

("Eurasia" or the "Company") 

Semenovsky Tailings Project update and receipt of assays

Eurasia Mining plc,("Eurasia") the Russia focused PGM and gold production and development company, here working in partnership with Metal Tiger plc ("MTR"), is pleased to update progress from the Semenovsky Tailings Project (STP), most importantly the receipt of assay results from the 2016 metallurgical drilling programme.

As reported in RNS dated 26 April 2016, a drilling programme was carried out on site and the samples sent to SGS Chita for assay and subsequent metallurgical analysis. The testing program is considered in three phases. Phase 1a, fire assay of samples, phase 1b, bottle-roll cyanide-leach testing, and phase 2, optimisation of leach variables. The assay results returned for the 54 samples collected in phase 1a are in line with previous estimates, and the grades used previously in Eurasia's resource calculations. This work is a necessary step in planning the design of the processing plant, as well as confirming the grade of the tails and the reliability of previous workers sampling.

Highlights:

· 54 fire assay results returned from SGS laboratories Chita, return an average grade of 1.16 g/t gold and 17.3 g/t silver.

· Results are in line with expected values obtained from previous sampling programmes, lending additional support to reserve calculations

· These grades are high for tailings, providing a robust project for re-treatment and recovery of gold.

The depth of the tailings dam varies from six to eleven metres on average and this recent sampling program was designed to test the complete column of sands through to underlying clays below the tailings foundation. 5 drill holes were evenly spaced over the 1.5km2 tailings dam. Results are tabulated in full below. The sands were logged and individually bagged on site in Semenovsky by Eurasia geologists. Gold values are obtained by fire assay with an atomic absorption analysis finish and the silver values by atomic absorption method.

Separately, a reserves report was submitted to local authorities on the 30th May 2016 and this is continuing through the normal approvals process at the Bashkirian Ministry for Subsoil use.

Christian Schaffalitzky, Managing Director at Eurasia Mining comments "We are pleased to have independent verification of grade at the Semenovsky Tailings Project. Having worked in Russia for many years we are familiar with the excellent standard of Russian geological assessments and have complete faith in the Russian system of mineral resource definition but working in partnership with MTR, are duty bound to provide normal due diligence confirmation. We now look forward to results of gold recovery tests which will allow us to refine the design of the process plant and optimize the mining operation."

Consent for release

EurGeol Christian Schaffalitzky, FIMMM, PGeo, MIEI, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the purposes of the reporting of these results.

 

 

Hole ID

Width (m)

Au, g/t

Ag, g/t

16 МЕТ-01-1

1

0.8

8.8

16 МЕТ-01-2

1

0.88

9.7

16 МЕТ-01-3

1

0.94

19.8

16 МЕТ-01-4

1

1.5

26.2

16 МЕТ-01-5

1

1.29

19.6

16 МЕТ-01-6

1

1.4

19.7

16 МЕТ-01-7

1

1.03

10.7

16 МЕТ-01-8

1

0.96

10.6

16 МЕТ-01-9/1

0.5

1.14

14.4

16 МЕТ-01-9/2

0.5

0.82

9.8

16 МЕТ-01-10/1

0.5

0.89

10.3

 

 

 

 

16 МЕТ-02-1

1

0.59

7.5

16 МЕТ-02-2

1

0.76

12.8

16 МЕТ-02-3

1

0.81

12.5

16 МЕТ-02-4

1

1.23

27.9

16 МЕТ-02-5

1

1.12

22.8

16 МЕТ-02-6

1

1.45

21.4

16 МЕТ-02-7

1

1.61

15.8

16 МЕТ-02-8/1

0.5

1.7

12.6

16 МЕТ-02-8/2

0.5

1.99

15.2

16 МЕТ-02-9

1

1.57

11.7

16 МЕТ-02-10/1

0.5

1.6

9.5

 

 

 

 

16 МЕТ-03-1

1

1.37

19.1

16 МЕТ-03-2

1

0.92

10.6

16 МЕТ-0З-З

1

1.33

13

16 МЕТ-03-4

1

1.04

25

16 МЕТ-0З-5

1

0.85

23.7

16 МЕТ-0З-6

1

1.15

19.3

16 МЕТ-03-7/1

0.5

0.94

17.7

16 МЕТ-03-7/2

0.5

0.98

9.4

 

 

 

 

16 МЕТ-04-1

1

1.04

15.2

16 МЕТ-04-2

1

1.84

21.8

16 МЕТ-04-3

1

1.98

30.2

16 МЕТ-04-4

1

1.66

30.3

16 МЕТ-04-5

1

0.94

20.4

16 МЕТ-04-6

1

0.98

14.9

16 МЕТ-04-7

1

0.96

9.6

 

 

 

 

16 МЕТ-05-1

1

1.04

26.9

16 МЕТ-05-2

1

1.14

8.4

16 МЕТ-05-3

1

0.84

20

16 МЕТ-05-4

1

0.73

24.6

 

 

 

 

Total metres

37

 

 

Width averaged gold grade g/t

1.16

 

Width averaged silver grade g/t

 

17.3

 

 

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDXLFBQDFBBBZ
Date   Source Headline
22nd Feb 20187:00 amRNSHolding(s) in Company
21st Feb 20182:48 pmBUSOn market purchase – Thor Mining
12th Feb 20184:13 pmBUSMOD Resources Investment Update
8th Feb 201810:05 amBUSOn Market Purchase in Thor Mining
5th Feb 20189:42 amRNSPublication of Investor Presentation
5th Feb 20189:18 amBUSDirector Dealing
2nd Feb 20182:05 pmRNSSecond Price Monitoring Extn
2nd Feb 20182:00 pmRNSPrice Monitoring Extension
2nd Feb 201812:15 pmBUSKEMCO PLC IPO Update
31st Jan 20188:33 amBUSKingsgate Investment Update
31st Jan 20187:00 amBUST3 Pre-Feasibility Study Results
30th Jan 20186:22 pmRNSHolding(s) in Company
29th Jan 20187:51 amBUSOn Market Purchase Thor Mining
25th Jan 20187:00 amBUSBotswana Copper/Silver Project T3 Update & Major Regional Exploration Programme
23rd Jan 201812:02 pmBUSStrategic Investment & Agreement – Thor Mining
23rd Jan 20189:11 amBUSKingsgate Investment Update - Replacement
23rd Jan 20187:47 amBUSKingsgate Investment Update
15th Jan 20185:19 pmBUSDirector Warrant Conversion
11th Jan 20182:30 pmBUSDirector Share Purchase
9th Jan 201811:00 amBUSKingsgate Consolidated General Meeting - Replacement
9th Jan 20188:34 amBUSKingsgate Consolidated General Meeting
5th Jan 20182:04 pmBUSHolding(s) in Company
5th Jan 20188:33 amBUSBotswana Copper/Silver Project Record High Grade Intersection at T3 Deposit
3rd Jan 20182:41 pmBUSExercise of Warrants
29th Dec 201710:11 amBUSExercise of Warrants
29th Dec 20177:00 amRNSResponse to Shareholder Letter Issued by Kingsgate
22nd Dec 20179:16 amBUSExtension of Warrant Period
21st Dec 20177:59 amRNSHolding(s) in Company
20th Dec 20174:55 pmRNSHolding(s) in Company
20th Dec 20174:28 pmBUSInvestment Update
12th Dec 201710:50 amRNSInformation Memorandum in relation to Kingsgate
8th Dec 20171:50 pmBUSUpdate on Minerals Management Master Plan
7th Dec 201710:57 amRNSReceipt of final GWRI & KEMCO Hydrogeology Study
7th Dec 20177:02 amBUSStatement re Botswana Copper/Silver Project – T3 Deposit: Underground Study Update
5th Dec 20177:05 amRNSKingsgate Shareholder Meeting
28th Nov 20177:26 amBUSBotswana Copper/Silver Project T3 Deposit: Environmental Approvals & Prefeasibility Study Update
27th Nov 20171:36 pmRNSHOLDING(S) IN COMPANY
24th Nov 201712:02 pmBUSExercise of Warrants
22nd Nov 20173:05 pmRNSSubmission of Members Statement to Kingsgate
22nd Nov 201712:38 pmBUSExercise of Warrants
16th Nov 20179:33 amBUSShare Issue
15th Nov 20179:40 amRNSChange at Kingsgate Consolidated Limited
15th Nov 20177:30 amBUSInvestment Update – Request for Shareholder Meeting at Kingsgate Consolidated Limited for Potential Board Changes
14th Nov 20177:19 amBUSBotswana Copper/Silver Project – Growing Potential Outside Existing Planned Pit
13th Nov 20174:24 pmBUSHolding(s) in Company
8th Nov 20177:00 amBUSExercise of Warrants
6th Nov 20179:50 amBUSShare Issue
27th Oct 20178:29 amBUSInvestment Update
25th Oct 20178:32 amRNSTR-1: Notification of major holdings
24th Oct 20177:33 amBUSBotswana Copper/Silver Project – T3 Deposit Drilling Assay Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.