Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTR.L Regulatory News (MTR)

  • There is currently no data for MTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Semenovsky Tailings Project & receipt of assays

4 Jul 2016 07:00

RNS Number : 0659D
Eurasia Mining PLC
04 July 2016
 

 

Eurasia Mining plc (AIM: EUA) 

("Eurasia" or the "Company") 

Semenovsky Tailings Project update and receipt of assays

Eurasia Mining plc,("Eurasia") the Russia focused PGM and gold production and development company, here working in partnership with Metal Tiger plc ("MTR"), is pleased to update progress from the Semenovsky Tailings Project (STP), most importantly the receipt of assay results from the 2016 metallurgical drilling programme.

As reported in RNS dated 26 April 2016, a drilling programme was carried out on site and the samples sent to SGS Chita for assay and subsequent metallurgical analysis. The testing program is considered in three phases. Phase 1a, fire assay of samples, phase 1b, bottle-roll cyanide-leach testing, and phase 2, optimisation of leach variables. The assay results returned for the 54 samples collected in phase 1a are in line with previous estimates, and the grades used previously in Eurasia's resource calculations. This work is a necessary step in planning the design of the processing plant, as well as confirming the grade of the tails and the reliability of previous workers sampling.

Highlights:

· 54 fire assay results returned from SGS laboratories Chita, return an average grade of 1.16 g/t gold and 17.3 g/t silver.

· Results are in line with expected values obtained from previous sampling programmes, lending additional support to reserve calculations

· These grades are high for tailings, providing a robust project for re-treatment and recovery of gold.

The depth of the tailings dam varies from six to eleven metres on average and this recent sampling program was designed to test the complete column of sands through to underlying clays below the tailings foundation. 5 drill holes were evenly spaced over the 1.5km2 tailings dam. Results are tabulated in full below. The sands were logged and individually bagged on site in Semenovsky by Eurasia geologists. Gold values are obtained by fire assay with an atomic absorption analysis finish and the silver values by atomic absorption method.

Separately, a reserves report was submitted to local authorities on the 30th May 2016 and this is continuing through the normal approvals process at the Bashkirian Ministry for Subsoil use.

Christian Schaffalitzky, Managing Director at Eurasia Mining comments "We are pleased to have independent verification of grade at the Semenovsky Tailings Project. Having worked in Russia for many years we are familiar with the excellent standard of Russian geological assessments and have complete faith in the Russian system of mineral resource definition but working in partnership with MTR, are duty bound to provide normal due diligence confirmation. We now look forward to results of gold recovery tests which will allow us to refine the design of the process plant and optimize the mining operation."

Consent for release

EurGeol Christian Schaffalitzky, FIMMM, PGeo, MIEI, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the purposes of the reporting of these results.

 

 

Hole ID

Width (m)

Au, g/t

Ag, g/t

16 МЕТ-01-1

1

0.8

8.8

16 МЕТ-01-2

1

0.88

9.7

16 МЕТ-01-3

1

0.94

19.8

16 МЕТ-01-4

1

1.5

26.2

16 МЕТ-01-5

1

1.29

19.6

16 МЕТ-01-6

1

1.4

19.7

16 МЕТ-01-7

1

1.03

10.7

16 МЕТ-01-8

1

0.96

10.6

16 МЕТ-01-9/1

0.5

1.14

14.4

16 МЕТ-01-9/2

0.5

0.82

9.8

16 МЕТ-01-10/1

0.5

0.89

10.3

 

 

 

 

16 МЕТ-02-1

1

0.59

7.5

16 МЕТ-02-2

1

0.76

12.8

16 МЕТ-02-3

1

0.81

12.5

16 МЕТ-02-4

1

1.23

27.9

16 МЕТ-02-5

1

1.12

22.8

16 МЕТ-02-6

1

1.45

21.4

16 МЕТ-02-7

1

1.61

15.8

16 МЕТ-02-8/1

0.5

1.7

12.6

16 МЕТ-02-8/2

0.5

1.99

15.2

16 МЕТ-02-9

1

1.57

11.7

16 МЕТ-02-10/1

0.5

1.6

9.5

 

 

 

 

16 МЕТ-03-1

1

1.37

19.1

16 МЕТ-03-2

1

0.92

10.6

16 МЕТ-0З-З

1

1.33

13

16 МЕТ-03-4

1

1.04

25

16 МЕТ-0З-5

1

0.85

23.7

16 МЕТ-0З-6

1

1.15

19.3

16 МЕТ-03-7/1

0.5

0.94

17.7

16 МЕТ-03-7/2

0.5

0.98

9.4

 

 

 

 

16 МЕТ-04-1

1

1.04

15.2

16 МЕТ-04-2

1

1.84

21.8

16 МЕТ-04-3

1

1.98

30.2

16 МЕТ-04-4

1

1.66

30.3

16 МЕТ-04-5

1

0.94

20.4

16 МЕТ-04-6

1

0.98

14.9

16 МЕТ-04-7

1

0.96

9.6

 

 

 

 

16 МЕТ-05-1

1

1.04

26.9

16 МЕТ-05-2

1

1.14

8.4

16 МЕТ-05-3

1

0.84

20

16 МЕТ-05-4

1

0.73

24.6

 

 

 

 

Total metres

37

 

 

Width averaged gold grade g/t

1.16

 

Width averaged silver grade g/t

 

17.3

 

 

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDXLFBQDFBBBZ
Date   Source Headline
8th Nov 202210:06 amBUSTR-1: Standard form for notification of major holdings
25th Oct 20221:33 pmBUSCobre Limited - New Copper Zone Intersected at The Ngami Copper Project
20th Oct 202211:42 amBUSSandfire Update
20th Oct 202211:41 amBUSSouthern Gold widens South Korean exploration to include Copper, Lithium and Rare Earths
17th Oct 20228:32 amBUSSouthern Gold Update
7th Oct 20222:39 pmBUSDirector Dealing
30th Sep 20225:33 pmBUSSandfire Update
29th Sep 20221:30 pmBUSCobre Limited – Quarterly Activities Report
29th Sep 20221:10 pmBUSMargin Lending Facility Update
29th Sep 202210:18 amBUSCobre Limited – Partial Disposal of Shares
21st Sep 202211:36 amBUSCobre Limited – Ngami Copper Project assay results confirm significant copper mineralisation
13th Sep 202210:24 amBUSArmada Metals Limited - Interim Report for the Half Year Ended 30 June 2022
9th Sep 202211:59 amBUSCobre Limited – Drilling intersects further significant copper mineralisation, ngami copper project
2nd Sep 20221:25 pmBUSSouthern Gold Update
31st Aug 20227:00 amBUSUnaudited Interim Results for the six months ended 30 June 2022
30th Aug 20222:39 pmBUSSandfire Update
30th Aug 20222:31 pmBUSCobre Limited – Vertical Continuity of Copper Mineralisation confirmed at the Ngami Copper Project
18th Aug 20229:54 amBUSCobre Limited – Botswana Renewal Approved
16th Aug 202211:42 amBUSCobre Limited – Additional Significant Copper Intersection Extends Mineralisation a Further 1KM to The Northeast, Ngami Copper Project
9th Aug 202211:48 amBUSCobre Limited – Stage 1 Infill Diamond Drilling Commences
4th Aug 202210:39 amBUSPro-rata participation in Cobre Limited’s A$7 million fundraising
3rd Aug 20229:54 amBUSCobre Limited – Additional Copper Intersection at The Ngami Copper Project
1st Aug 202210:26 amBUSCobre Limited – Significant New Copper Intersection at The Ngami Copper Project
1st Aug 202210:25 amBUSArmada Metals Limited - Ground-Based Nsamt Survey Underway at The Nyanga Project
29th Jul 202211:10 amBUSSouthern Gold Limited – Quarterly Activities Report
29th Jul 202211:09 amBUSArmada Metals Limited – Quarterly Report
29th Jul 202211:08 amBUSMetal Tiger plc
28th Jul 202212:53 pmBUSMetal Tiger plc
27th Jul 20229:17 amBUSCobre Limited – Significant New Copper Intersection at The Ngami Copper Project
6th Jul 202211:01 amBUSCobre Limited – Commencement of Advanced Exploration Drilling at the Kalahari Copper Belt in Botswana
5th Jul 20229:21 amBUSCobre Limited – Board and Fee Structure Changes
4th Jul 20221:07 pmBUSKalahari Metals Limited – Appointment of CEO and New Exploration Team
4th Jul 20221:06 pmBUSArmada Metals Limited - Rock Sampling Confirms Magmatic Sulphide Potential Extends for Over 60km at the Nyanga Project
30th Jun 20229:18 amBUSSandfire - 147Mt Mineral Resource sets strong foundation for optimisation and long-term growth at MATSA
24th Jun 202211:06 amBUSSandfire Shareholding Update and Margin Lending Facility
21st Jun 202212:43 pmBUSSandfire Shareholding Update and Margin Lending Facility
21st Jun 20228:44 amBUSArmada Metals Limited – Diamond Drilling Intersects Magmatic Sulphides at The Nyanga Project
16th Jun 202210:11 amBUSDisposal of Interest in Kalahari Metals Limited - Replacement
16th Jun 20228:06 amBUSDisposal of Interest in Kalahari Metals Limited
16th May 202212:57 pmRNSResults of Annual General Meeting
10th May 20228:38 amBUSSouthern Gold – Appointment of CEO
3rd May 202211:03 amBUSSouthern Gold Update
29th Apr 202210:14 amBUSCobre – Publishing of Quarterly Activities Report
29th Apr 202210:12 amBUSArmada Metals Limited – Publishing of Quarterly Report
28th Apr 20229:54 amBUSSandfire Update
19th Apr 202210:13 amBUSPosting of Annual Report and Notice of AGM
19th Apr 20229:07 amBUSSouthern Gold Update
12th Apr 20227:11 amBUSKalahari Metals Ltd: Endurance Prospect Targets
6th Apr 20229:41 amBUSSandfire Update
31st Mar 20224:20 pmBUSAudited results for the year ended 31 December 2021

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.