The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTR.L Regulatory News (MTR)

  • There is currently no data for MTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Botswana Copper/Silver Project Update

6 Jul 2016 08:47

Metal Tiger Plc

("Metal Tiger" or the "Company")

Botswana Copper/Silver Project Update

Metal Tiger plc (LON:MTR) the London Stock Exchange AIM listed investor in strategic natural resource opportunities is pleased to provide an update with regard to the diamond drilling programme at the Company’s Joint Venture (“JV”) project with partners MOD Resources (ASX:MOD) in the Kalahari Copper Belt in Botswana (70% MOD Resources / 30% Metal Tiger).

Technical highlights in respect of progress on the Target 3 (T3) Prospect, Phase 1 Resource Diamond Drilling Programme (the “Resource Programme”) are provided below. In addition we would refer to the announcement released today by MOD Resources which contains images and diagrams that may assist readers in an understanding of the project and the drilling being undertaken. This announcement can be viewed through the following link:

http://search.asx.com.au/s/search.html?query=mod&collection=asx-meta&profile=web

Paul Johnson Chief Executive Officer of Metal Tiger commented

“We continue to be encouraged by the flow of strong assay results from our Botswana joint venture. The thick intersections of relatively high grade copper with significant silver are proving remarkably consistent, adding confidence to the possibility of an open-pit mine at T3.

To this end we support the commencement of metallurgical testwork and the appointment of a technical study manager to oversee a scoping study on the viability of the planned T3 Resource for open-pit mining.

We are highly encouraged with the continuing progress and professionalism of our Joint Venture partners in Botswana. The regular flow of news to market of late is demonstrable evidence of the progress being achieved.

Testing of other targets on the T3 Dome is an important step forward and it is of significance that the wider T3 area remains largely unexplored and is, in part, as geologically prospective as the ground which is currently the focus of drilling at T3.”

Highlights:

Resource Programme Progress

Assay results have been received for a further four diamond drill (DD) holes (MO-G-10D, MO-G-11D, MO-G-12D & MO-G-14D) within the Resource Programme area. The assays show wide intersections of 1-2% copper mineralisation and significant silver. The assay results for MO-G-13D are currently awaited. Significant downhole intersections include: MO-G-10D: 29m @ 1.8% Cu and 34g/t Ag from 112.0m MO-G-11D: 29m @ 1.8% Cu and 32g/t Ag from 112.0m MO-G-12D: 17.2m @ 1.4% Cu & 14g/t Ag from 103.9m 23 DD holes have now been completed and 2 DD holes are in progress within the Resource Programme. With 3 diamond drill rigs in operation on the Resource drilling, the work is on track to complete a maiden Resource in Q3 2016. The planned metallurgical drilling and test work programme will commence this month under the direction of the metallurgical consulting group, Independent Metallurgical Operations Pty Ltd (IMO). IMO will conduct the test work on a range of different sulphide ores from T3, from their base in Perth, Australia. MOD have appointed Mr Royce McAuslane as Study Manager for an open pit mine Scoping Study on the planned T3 Resource. It is envisaged that the scoping study would complete at the end of 2016, with a follow-up pre-feasibility study commencing in early 2017, should the results of the Scoping Study prove positive. Key results for latest down-hole intersections include: Hole MO-G-10D 16.5m @ 1.3% Cu & 23g/t Ag from 92.0m 29.0m @ 1.8% Cu and 34g/t Ag from 112.0m Hole MO-G-11D 29.0m @ 1.8% Cu & 32g/t Ag from 112.0m, including: 5.8m @ 2.6% Cu & 39g/t Ag from 119.0m; and 4.1m @ 3.8% Cu & 88g/t Ag from 136.9m 14.0m @ 0.73% Cu & 13g/t Ag from 159.0m Hole MO-G-12D 17.2m @ 1.4% Cu & 14g/t Ag from 103.9m, including: 7.5m @ 2.2% Cu & 26g/t Ag from 105.5m Hole MO-G-14D • 14.5m @ 1.0% Cu & 4g/t Ag from 87.5m

The four holes were designed to intersect the northerly dipping mineralisation at depth, and are orientated with a azimuth of 160deg and dip of 60deg. MO-G-010D reached a down hole depth of 170m, MO-G-11D reached 179m, MO-G-12D reached 158m and MO-G-14D reached 170m. A table of the drill collar locations is provided in the MOD release referenced above. Results from the continuing drilling programme will be released as they become available following geological interpretation.

T3 Prospect Expansion

The fourth diamond drill rig has commenced testing targets outside of the current resource drilling area, these targets include; an induced polarisation (IP) geophysics chargeability anomaly 300m down dip from the deepest hole to date (MO-G-07D); an IP chargeability anomaly 1km south of current drilling; and a possible fault displacement of the target sequence 300m west of the resource area. The reverse circulation (RC) drilling rig continues to test the eastern 3km long copper/zinc anomaly, at a location approximately 3km east of the Resource drilling area. As part of the continuing T3 prospect expansion, further IP geophysics traverses are also planned this month to identify possible sulphide targets elsewhere on the T3 Dome.

Current Exploration Programme Plan

The Resource drilling programme at T3 is concentrating on the current 800m strike length of the T3 deposit, delineating the upper (UZ) and lower (LZ) copper/silver mineralisation, from circa 60m vertical depth to 200m depth. The planned programme currently consists a further 17 diamond core drill holes at 100m collar spacing (subject to assay results additional holes may be added to enlarge the Resource area envelope). Additional samples are to be taken to enable metallurgical testwork on the copper/silver mineralisation. The completion of the maiden Mineral Resource estimate for T3 is planned for Q3 2016.

Location

The T3 Prospect is located on the Kalahari Copper Belt in northern Botswana and is part of the MOD/MTR joint venture Botswana Copper/Silver Project. T3 is located approximately 70km NE of the project’s Tshimologo (T4) Prospect and is located parallel to the same structural trend known as the Mahumo Structural Corridor, that hosts MOD’s Mahumo Project (circa 20km NE of T3) and Cupric Capitals’ Banana Zone Deposit (60km NE) and Zone 5 Project (120km NE).

MOD outline details of the current exploration procedures being employed on the project (JORC 2012 Table 1), a drill plan and section and tabulated assay data in their news release dated 6 July 2016. The work is being managed on the ground by MOD’s Competent Person, Mr Jacques Janse van Rensburg, BSc (Hons), General Manager Exploration (Africa).

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MAusIMM, FGS), who is a qualified geologist who meets the criteria of a qualified person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly has visited the T3 site and reviewed MOD’s drilling and sampling protocols and procedures. Mr O'Reilly is a consultant working for Mining Analyst Consulting Ltd which has been retained by Metal Tiger PLC to provide technical support.

For further information on the Company, visit: www.metaltigerplc.com:

Paul Johnson (Chief Executive Officer) Tel: +44 (0)7766 465 617
Terry Grammer (Non- Executive Chairman) Tel: +44 (0)207 099 0738
Sean Wyndham-Quin

Neil Baldwin

Nick Emerson

Andy Thacker

Spark Advisory Partners Limited

(Nominated Adviser)

SI Capital

(Sole Broker)

Tel: +44 (0) 2033 683 555

www.sparkadvisorypartners.com

Tel: +44 (0) 1483 413 500

Notes to Editors:

Metal Tiger plc is listed on the London Stock Exchange AIM Market (“AIM”) with the trading code MTR and invests in high potential mineral projects with a precious and strategic metals focus.

The Company’s target is to deliver a very high return for shareholders by investing in significantly undervalued and/or high potential opportunities in the mineral exploration and development sector timed to coincide, where possible, with a cyclical recovery in the exploration and mining markets. The Company’s key strategic objective is to ensure the distribution to shareholders of major returns achieved from disposals.

Metal Tiger’s Metal Projects Division is focused on the development of its key project interests in Botswana, Spain and Thailand. In Botswana Metal Tiger has a growing interest in the large and highly prospective Kalahari copper/silver belt. In Spain Metal Tiger the Company has tungsten and gold interests in the highly mineralised Extremadura region. In Thailand Metal Tiger has expanding interests over licences, applications and critical historical data covering antimony, copper, gold, silver, lead and zinc opportunities.

The Company has access to a diverse pipeline of new opportunities focused on the natural resource sector including physical resource projects, new natural resource centred technologies and resource sector related fintech opportunities. Pipeline projects deemed commercially viable may be undertaken by Metal Tiger or by an ISDX or AIM partner with whom the Company is engaged.

Metal Tiger also has an Asset Trading Division that holds various financial instruments for trading purposes including equities, warrants and royalty income. The aim of the division is to generate profits to reinvest into the Company’s project based activities.

View source version on businesswire.com: http://www.businesswire.com/news/home/20160706005520/en/

Copyright Business Wire 2016

Date   Source Headline
27th Mar 20207:00 amBUSDirector Dealing
26th Mar 202011:05 amRNSSecond Price Monitoring Extn
26th Mar 202011:00 amRNSPrice Monitoring Extension
26th Mar 20207:00 amBUSDirector Dealing
24th Mar 20204:43 pmRNSSecond Price Monitoring Extn
24th Mar 20204:37 pmRNSPrice Monitoring Extension
23rd Mar 20207:00 amBUSSouthern Gold A$4 Million Revised Fundraise
19th Mar 20209:27 amBUSCobre Limited – Exploration Update
12th Mar 20209:44 amBUSAcquisition of Sandfire Shares
12th Mar 20207:00 amBUSTermination of Acquisition and Joint Venture Agreement, Thailand
9th Mar 202011:29 amBUSKalahari Metals Limited: Drilling Programme Commences at Kitlanya East and Licence Renewals
14th Feb 20207:00 amBUSFurther Investment of US$1.5m in Kalahari Metals Limited and grant of 2% NSR
12th Feb 20209:48 amBUSAnnouncement of Visual Drill Results by Cobre Limited
11th Feb 202011:33 amBUSAnnouncement of Placement by Southern Gold
10th Feb 202011:05 amRNSSecond Price Monitoring Extn
10th Feb 202011:00 amRNSPrice Monitoring Extension
10th Feb 20209:53 amBUSInvestment in ASX listed South Korean Gold Explorer and Spain Write Off
7th Feb 202011:05 amRNSSecond Price Monitoring Extn
7th Feb 202011:00 amRNSPrice Monitoring Extension
5th Feb 20209:20 amBUSCobre Limited Commencement of Drilling at Perrinvale Project
4th Feb 20207:00 amBUSDirector’s Dealing
31st Jan 202012:50 pmBUSCancellation of Treasury Shares
31st Jan 20209:41 amBUSCobre Limited Commencement of Trading and Perrinvale Drill Programme Approvals
24th Jan 202010:05 amBUSUpdate on Cobre Investment
24th Jan 20207:00 amBUSTransaction in Own Shares
23rd Jan 20207:00 amBUSTransaction in own shares
22nd Jan 20207:00 amBUSTransaction in own shares
20th Jan 20201:43 pmBUSKalahari Metals Limited Change of Control Approvals
20th Jan 20207:00 amBUSTransaction in own shares and cancellation of treasury shares
17th Jan 20207:00 amBUSTransaction in Own Shares
16th Jan 20207:00 amBUSTransaction in Own Shares
10th Jan 20207:11 amBUSTransaction in own shares
9th Jan 20207:00 amBUSTransaction in own shares
8th Jan 20207:00 amBUSTransaction in own shares
3rd Jan 20207:00 amBUSTransaction in own shares
2nd Jan 20207:00 amBUSTransaction in own Shares
31st Dec 201912:02 pmRNSHolding(s) in Company
31st Dec 20197:00 amBUSTransaction in Own Shares
24th Dec 20197:00 amBUSTransaction in own shares
20th Dec 20197:00 amBUSTransaction in Own Shares
19th Dec 20197:00 amBUSShare Buyback Programme
17th Dec 20197:00 amBUSCompletion of financing arrangement secured against investment in Sandfire Resources NL
16th Dec 20192:29 pmBUSPan Asia Metals – Corporate and Exploration Update
6th Dec 20197:00 amBUSKalahari Metals Limited – Botswana Drilling Update
20th Nov 20198:23 amRNSUpdate on Cobre Pty Ltd Investment
6th Nov 201911:48 amBUSResult of Meeting
30th Oct 201910:11 amRNSChange of Adviser
23rd Oct 201911:16 amRNSSandfire Resources shares received
22nd Oct 20198:33 amRNSParticipation in Thor Mining Placing
15th Oct 20194:24 pmRNSNotice of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.