GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration and Field Developments Update

7 May 2009 07:00

RNS Number : 8194R
Melrose Resources PLC
07 May 2009
 



FOR IMMEDIATE RELEASE

7 May 2009

Melrose Resources plc

("Melrose" or "the Company")

Exploration and Field Developments Update

Melrose Resources plc (LSE: MRS), the oil and gas exploration, development and production company, is pleased to announce a successful exploration discovery and first production from two new field developments in EgyptThe Company also provides an update on its exploration drilling program in East Texas.

Egypt

The South Khilala No.1 exploration well has been successfully drilled with the EDC-rig to test a prospect located approximately 10 kilometres to the south of the West Khilala field in the El Mansoura concession. The well encountered 62 feet of net pay in the Qawasim formation and has been flow tested at 17.6 MMcfpd of gas with small amounts of condensate. The mid-case estimate of the discovery reserves is 36 Bcf (on a working interest basis) and the well has already been completed as a producer for fast-track development via the West Khilala field facilities. 

The EDC-9 rig is currently being moved to the West Dikirnis field where it will be used to drill a third horizontal development well following the recent success of the West Dikirnis No.7 and No.10 horizontal wells. On a combined basis, these two wells were drilled through over 3,100 horizontal feet of reservoir interval and are currently producing 5,200 bpd of oil.

The South Zarqa and North East Abu Zahra field developments in the El Mansoura concession have been completed within budget and ahead of schedule.  The fields have been tied back to the South Batra production facilities using a common 35 kilometre flow line and came on production on 20 April 2009The fields contain total proved plus probable reserves of 58 Bcf of gas and 1.6 MMbbls of condensate and are currently producing at 22 MMcfpd of gas and 710 bpd of condensate. The production rate from the fields will increase to approximately 40 MMcfpd over the next four months when additional facilities capacity will become available at the South Batra plant. The North Dikirnis No.1 appraisal well was also brought on stream on 13 April 2009 through the West Dikirnis facilities and is producing approximately 5 MMcfpd of gas and 150 bpd of condensate. 

Production from the new developments, coupled with a strong contribution from the existing fields, has increased Melrose's Egyptian production at the end of May to 224 MMcfpd of gas equivalent (on a working interest basis). This comprised some 160 MMcfpd of gas and 10,700 bpd of oil and condensate.

United States 

The East Texas Nunan No.1 exploration well spudded on 15 January 2009 and reached a total depth of 12,005 feet. The well encountered gas shows in the Reklaw formation, which was penetrated at a depth of 11,602 feet, and open logs indicated a net pay interval of approximately 64 feetFlow test data acquired from the well demonstrate that the formation has relatively low permeability and Melrose is currently preparing to conduct a fracture stimulation treatment and further testing to ascertain whether commercial production rates can be established from the reservoir

 

Commenting on the update, David Thomas, Chief Executive said:

"We are delighted to have brought our new developments in Egypt on stream ahead of schedule and to have achieved a new production record for Melrose in the country. It is also very pleasing to have recorded our second exploration success of the year and we will be fast-tracking South Khilala for development."

For further information please contact

Melrose Resources plc
 
 
 
Robert Adair, Executive Chairman
David Thomas, Chief Executive
Diane Fraser, Finance Director
0131 221 3360
 
 
Buchanan Communications Limited
 
Ben Willey
Ben Romney
0207 466 5000

 

or visit www.melroseresources.com

Glossary:

Bcf - billion cubic feet of gas

bpd - barrels of oil or condensate per day

MMbbls - million barrels of oil or condensate 

MMcfpd - million cubic feet of gas per day

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUUURAAUPBGQQ
Date   Source Headline
20th May 20083:36 pmRNSArticles of Association
15th May 200812:14 pmRNSAnnual Report and Accounts
13th May 20088:30 amRNSInterim Management Statement
24th Apr 200811:04 amRNSOperations Update
11th Apr 20083:20 pmRNSDirector/PDMR Shareholding
31st Mar 20089:56 amRNSDirector/PDMR Shareholding
31st Mar 20089:35 amRNSTotal Voting Rights
27th Mar 20083:21 pmRNSBlock Listing Return
27th Mar 20083:13 pmRNSMajor Interests in Shares
27th Mar 200810:33 amRNSDirector/PDMR Shareholding
25th Mar 200811:30 amRNSTR-1-Notification of Interest
18th Mar 20087:01 amRNSPreliminary Results
25th Feb 200810:15 amRNSAnalyst Site Visit
19th Feb 200811:30 amRNSNotice of Results
19th Feb 20089:30 amRNS2007 Production Report
31st Jan 20084:40 pmRNSSecond Price Monitoring Extn
31st Jan 20084:35 pmRNSPrice Monitoring Extension
21st Jan 20087:01 amRNSDrilling Update
18th Jan 20084:40 pmRNSSecond Price Monitoring Extn
18th Jan 20084:35 pmRNSPrice Monitoring Extension
17th Jan 200811:19 amRNSEgypt Update
14th Jan 20084:25 pmRNSAnnual Information Update
4th Jan 200811:15 amRNSUnited States Update
7th Dec 200711:19 amRNSDirector's Shareholding
7th Dec 200711:16 amRNSBulgaria Update
4th Dec 20074:35 pmRNSPrice Monitoring Extension
30th Nov 200710:59 amRNSOperations Update
28th Nov 200710:20 amRNSIndependent Non Exec Director
13th Nov 20073:01 pmRNSDirectorate Change
8th Nov 20074:40 pmRNSSecond Price Monitoring Extn
8th Nov 20074:35 pmRNSPrice Monitoring Extension
7th Nov 20079:55 amRNSBulgarian Operations Update
2nd Nov 200711:00 amRNSBond Offering Update
18th Oct 200710:22 amRNSE250m Bond Offering
10th Oct 20077:01 amRNSOperations Update
21st Sep 20077:01 amRNSInterim Report
4th Sep 200711:03 amRNSHolding(s) in Company
3rd Sep 20074:35 pmRNSDirector/PDMR Shareholding
30th Aug 20071:51 pmRNSHolding(s) in Company
29th Aug 20077:00 amRNSInterim results
24th Aug 20072:58 pmRNSChange of Company Secretary
24th Aug 20072:21 pmRNSChange of Company Sectretary
9th Aug 20079:30 amRNSNotice of Results
8th Aug 200711:57 amRNSDirectors' Share Plan
12th Jul 20073:42 pmRNSDirector's Shareholding
12th Jul 20073:42 pmRNSBlock Listing Return
11th Jul 200711:00 amRNSEgypt Drilling Update
28th Jun 20075:04 pmRNSDirectors' Shareholdings
28th Jun 20071:28 pmRNSPerformance Share Plan
21st Jun 200710:31 amRNSDirectors' Shareholdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.