Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMOIL.L Regulatory News (MOIL)

  • There is currently no data for MOIL

Company Presentation and Operational Update

16 Dec 2013 12:55

RNS Number : 6346V
Madagascar Oil Limited
16 December 2013
 



NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN OR INTO THE UNITED STATES, AUSTRALIA, CANADA OR JAPAN

 

16 December 2013

MADAGASCAR OIL LIMITED

("Madagascar Oil", "MOIL" or the "Company")

Company Presentation and Operational Update

 

Madagascar Oil announces that an updated Company Presentation is now available, on the Company's website, which includes new information on the Company's operations, development and exploration. A full update is set out below.

 

Operations

· Cumulative oil production has now exceeded 32,000 Barrels total from the cyclic phase of the Steam Flood Pilot ("SFP") with 13,776 Barrels in Tsimiroro Field Storage Tanks as at 30 November 2013, with the remainder having been used for fuel for steam generation. Average oil production for November 2013 was 253 barrels of oil per day. Improvements in oil production rates are still being noted in wells subjected to their third huff and puff cycle. Increases in steam injection rates in the designated injection wells have been achieved through increased injection pressures. Two injection wells in the PSF-11 pattern have achieved peak steam injection rates of over 300 barrels of water equivalent per day. Four injection wells have been subjected to continuous steam injection as the SFP moves into the steam-flooding phase.

· Steam generation was shut down at the end of November for 10 days to allow the safe drilling of two new temperature observation wells, designed to provide an accelerated steam flood insight in the PSF-11 pattern. Full reservoir section cores were successfully obtained in both wells. The third steam generator passed a pressure test in November to achieve Ministry pressure certification. Work continues to replace the steam generator control software to increase operability and reliability on commissioning of the two offline steam generators. The two commissioned steam generators have achieved an average uptime of 85% during September, October and November 2013.

· Core analysis is to be conducted on the recently obtained samples in order to confirm oil saturations pre-steam flooding. A follow up cored well will be considered for drilling when steam has been shown to have passed through the temperature observation wells to arrive at a post flood oil saturation. This is designed to assist in substantiating ultimate oil recovery potential in the Tsimiroro Field under steam flood conditions.

 

 

 

Tsimiroro Field Development Planning

· Work proceeds on preparation of the Full Field Development Plan by the Tsimiroro Development Planning Team with the pre-requisite Declaration of Commerciality on track for a February 2014 submission. Definition of an initial Phase 1 Area centred around the existing SFP wells and facilities is progressing with initial local export markets and routings being defined. Work also continues on marketing studies to allow a firm understanding of the international markets available to Tsimiroro crude.

· The Saybolt Crude Assay results, received in October 2013, confirmed Tsimiroro as a sweet, heavy low wax content crude with an API gravity of 15° API. Tsimiroro Crude Oil Markets, both local and international, have been identified for refinery, power generation and marine fuel oil use. Blending trial results to meet fuel standards for potential Madagascar power generation have been conducted by in-country downstream suppliers with additional sampling and trials being planned.

 

Exploration

· Data consolidation and re-interpretation is now complete across Licence Blocks 3105, 3106 and 3107. Two field trips in the third quarter of 2013 returned with quality outcrop samples for reservoir and source rock validation and basin modelling study work. A seismic infill programme is in the process of being defined to provide better definition on the Block Leads and Prospects.

· A Farm-out campaign of the licenses was launched at Africa Oil Week in Cape Town at the end of November 2013 with initial data room entrants being scheduled for later this month and early next year.

 

Contact Information:

Madagascar Oil Limited

Stewart Ahmed, Chief Operating Officer

Gordon Stein, Chief Financial Officer

 

+44 (0)20 3356 2731

 

Mirabaud Securities LLP

Rory Scott

 

+44 (0)20 7878 3360

Strand Hanson Limited

Stuart Faulkner

Angela Hallett

James Dance

+44 (0)20 7409 3494

Bell Pottinger Pelham

Mark Antelme

Henry Lerwill

+44 (0)20 7861 3232

 

 

www.madagascaroil.com

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUNVURORAUAAA
Date   Source Headline
31st Mar 201611:27 amRNSResult of SGM and Delisting
14th Mar 20166:01 pmRNSCompletion of Tranche 1 Placing
11th Mar 20166:00 pmRNSPosting of circular
9th Mar 20167:00 amRNSTimetable for proposed Delisting
4th Mar 20167:00 amRNSIndependent Directors' Election, Tranche 1 Placing
2nd Mar 20167:00 amRNSConditional Framework Agreement
18th Feb 20169:30 amRNSCompany Update
2nd Feb 20163:59 pmRNSUpdate on Partner Process/discussions with Lenders
15th Jan 20164:40 pmRNSSecond Price Monitoring Extn
15th Jan 20164:35 pmRNSPrice Monitoring Extension
17th Nov 20152:53 pmRNSResult of Annual General Meeting
23rd Oct 20155:00 pmRNSNotice of AGM
30th Sep 20157:00 amRNSHalf Year Results
29th Sep 20153:28 pmRNSFinancing and Operational update
7th Sep 20157:00 amRNSStrategic Process and Financing Update
1st Jul 20157:00 amRNSDirectorate Change
30th Jun 20157:07 amRNSFull Year Results
30th Jun 20157:01 amRNSUS$5 million Working Capital Facility
23rd Jun 201510:27 amRNSSubmission of Tsimiroro Phase 1a Development EIA
22nd Jun 201510:09 amRNSAppointment of Jefferies as Strategic Advisor
16th Apr 20157:00 amRNSTsimiroro Development Plan Approval
3rd Mar 20157:00 amRNSOperational & Development Planning Update
29th Jan 20155:41 pmRNSDirector's Dealing
29th Jan 20157:00 amRNSDirector's Dealings
22nd Jan 20157:00 amRNSAppointment of CEO and other Board Changes
15th Dec 20147:00 amRNSExtension Request for Exploration Licence Blocks
9th Dec 20147:00 amRNSDirectors' Remuneration/Related Party Transaction
3rd Dec 201411:27 amRNSAGM Statement and Result of AGM
12th Nov 20147:00 amRNSResult of Open Offer
7th Nov 20147:00 amRNSNotice of AGM
6th Nov 201410:00 amRNSCompany Presentation
28th Oct 20147:00 amRNSSubmission of Tsimiroro Development Plan
22nd Oct 20141:30 pmRNSBoard Changes
20th Oct 20147:00 amRNSPosting of Open Offer Circular
24th Sep 20146:03 pmRNSPlacing and Open Offer
23rd Sep 201411:37 amRNSHalf Year Results
7th Aug 20147:00 amRNSAmendment to the PSC and Renewal of Mining Title
30th Jun 20147:00 amRNSFull Year Results and Operational Update
18th Jun 20149:49 amRNSPresident of the Republic of Madagascar Visit
12th Jun 201410:07 amRNSTR-1 Notification of Major interest in Shares
23rd May 20147:00 amRNSTsimiroro Licence approval of test sales
22nd May 201412:31 pmRNSDirectorate Change
8th May 20142:10 pmRNSTsimiroro Licence Declaration of Commerciality
10th Apr 20145:17 pmRNSTR-1 Notification of Major Interest in Shares
31st Mar 20144:29 pmRNSDirectorate Change
31st Mar 20143:36 pmRNSDirectorate Change
18th Mar 20147:00 amRNSOperational Update & Development Planning Progress
16th Dec 201312:55 pmRNSCompany Presentation and Operational Update
14th Nov 20133:00 pmRNSResignation of Director
7th Nov 20134:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.