Los Calatos Project Update

26 Jul 2012 07:05

RNS Number : 5553I
Metminco Limited
26 July 2012
 



ASX ANNOUNCEMENT

26 July 2012

LOS CALATOS PROJECT UPDATE

HIGHLIGHTS

·; Higher Grade Zones: Drilling confirms the existence of higher-grade zones within a broad mineralised envelope that could provide high grade ore feed in the initial mining years, thereby materially improving the NPV of the project

·; Pit Optimisation Studies: The Company's focus has now shifted to the assessment of pit optimisation scenarios prior to commencing a pre-feasibility study at the end of 2012

·; Savings on Drilling Costs: Due to consistent drill results enabling a better understanding of the geology, the Phase 4 drilling program has been trimmed from 100,000m to 61,000m, thereby saving approximately US$12million in the current year

·; Drilling Update: A further 17 drill holes have been completed at Los Calatos with all holes delivering intercepts within, or exceeding, expectations. Significant intercepts include 324m at 0.53% Cu and 51 ppm Mo, 956m at 0.48% Cu and 408 ppm Mo and 179m at 0.61% Cu and 79 ppm Mo

 

KEY RESULTS

Metminco Limited ("Metminco" or the "Company") is pleased to announce further results from the in-fill drilling at Los Calatos, its 100% owned copper-molybdenum project in southern Peru. Excellent progress has been made with the understanding of the high grade domains within the large mineralised porphyry system at Los Calatos. While the previously announced Mineral Resource Estimate of 2.3 billion tonnes at 0.40% Cu and 210 ppm Mo (26.1 billion lbs CuEq) demonstrates a world-class copper deposit in terms of size, the Company has undertaken additional work to help provide the detail needed to enable mine planning and scheduling.

As more drill data is collected and modelled, the Company's knowledge of grade distribution and the location of higher grade geological domains has increased. The early mining of the higher grade domains could have a positive, material, impact on the economics of the project in terms of timing, capital expenditure and revenue.

Importantly, the ongoing studies have demonstrated that the Company has considerable optionality in terms of a phased development of Los Calatos, enabling better management of capital expenditure and cash flows. This is viewed by the Company as being particularly relevant in these challenging economic times.

Due to an improved understanding of the grade distribution, the Company will now focus the remaining Phase 4 drilling on converting that high grade portion of the mineral resource, which will potentially be exploited in the early years of the project, to an Indicated Mineral Resource. Accordingly, the number of Phase 4 drilling metres has been reduced from 100,000m to 61,000m, without compromising the quality of the information, thereby saving approximately $12million in drilling costs this financial year.

 

William Howe, Managing Director said "The reduction in the Phase 4 drilling metres follows a decision to concentrate the remaining drilling on high grade zones identified at Los Calatos, which will be the focus of an initial, Stage 1, open pit. This will not only result in a cost saving, but will expedite the conclusion of the Phase 4 drilling program ahead of the planned pre-feasibility study."

 

DISCUSSION OF RESULTS

Recent drilling results

The drilling results returned to-date for Phase 4 (CD-50 to CD-77) are summarised in Appendix 1.

Since the release of the Interim Mineral Resource Estimate for Los Calatos in April 2012, 17 drill holes (CD-61 to CD-77) have been completed, as described in Tables 1 and 2 below, and as depicted in Appendix 2.

 

Table 1: Objectives of drill holes CD-61 to CD-77

 

BHID

Mineralised Zone

Objective

CD-61 & CD-64

Breccia

Definition drilling; northern margin

CD-66B, CD-67; CD-69, CD-71, CD-72, CD-75B & CD-77

Porphyry & Diatreme Complex

Infill drilling of potential Stage 1 Open Pit

CD-63, CD-65, CD-68, CD-70 & CD-73

Porphyry and Diatreme Complex

Confirm depth extension of mineralisation

CD-62 & CD-76

Diatreme Complex

Confirm eastern continuity of high grade zones

CD-74

Porphyry

Confirm western extension

 

Note: BHID = Borehole identification number

 

Table 2: Significant drill hole results (CD-61 to CD-77)

 

BHID

Mineralised Intercept

Depth Interval (m)

CD-61

933m at 0.51% Cu and 407ppm Mo

767m to 1,700m

including

309m at 0.97% Cu and 1,052ppm Mo

878 to 1,187m

CD-62

324m at 0.53% Cu and 51ppm Mo

652m to 976m

CD-64

956m at 0.48% Cu and 408ppm Mo

464m to 1,420m

including

63m at 1.07% Cu and 565ppm Mo

494m to 557m

including

42m at 1.23% Cu and 2,224ppm Mo

914m to 956m

CD-73

647m at 0.36% Cu and 92ppm Mo

1,256m to 1,903m

including

79m at 0.53% Cu and 59ppm Mo

1,385m to 1,464m

CD-75B

179m at 0.61% Cu and 79ppm Mo

1,351m to 1,530m

including

67m at 1.07% Cu and 139ppm Mo

1,411m to 1,478m

CD-76

58m at 0.45% Cu and 12ppm Mo

539m to 597m

and

128m at 0.59% Cu and 43ppm Mo

685m to 813m

 

The drilling results for the porphyry are generally consistent with the geological and evaluation models used for the April 2012 Mineral Resource Estimate.

However, drill holes CD-61 and CD-64 returned higher grade intersections than were predicted in the evaluation model for the high grade breccia zone located on the northern margin of the deposit, with CD-61 returning a grade of 0.97% Cu over 309 metres, and CD-64 returning grades of 1.07% and 1.23% Cu over 63 metres and 42 metres respectively.

Two drill holes (CD-62 and CD-76) were completed on the eastern edge of the mineralised envelope (diatreme complex), which returned grades of 0.53% Cu over 324 metres (CD-62), and 0.59% Cu over 128 metres (CD-76).

 

Categorisation of drilling results

The drilling results for Los Calatos can be grouped into three broad categories:

a) High grade breccia (Appendix 2; Figure 2): Mineralisation tends to be well-constrained, occurs close to surface, and is open at depths in excess of 1,700 metres. The breccia would constitute the primary focus of an initial, Stage 1, open pit.

b) High grade diatreme complex (Appendix 2; Figure 3): Mineralisation tends to be well-constrained, occurring within, and peripheral to the diatreme complex. As the associated mineralisation occurs at depths in excess of 500 metres, the identified mineralisation would be exploited as part of a larger open pit, and/or an underground bulk mining (viz. block caving) operation.

c) Low to medium grade porphyry (Appendix 2; Figure 4): Mineralisation tends to be more diffuse, occurs close to the surface and is open at depths in excess of 1,700m metres. The mineralised porphyry would be incorporated into a Stage 1 and subsequent, larger, open pit.

 

Revised drilling program

Following completion of the interim Mineral Resource Estimate for Los Calatos in April 2012, which identified a mineral resource of 2.3 billion tonnes at a grade of 0.40% Cu and 210ppm Mo (using a 0.2% Cu cut-off grade), the Phase 4 drilling program was revised to focus on high grade zones within the Los Calatos mineralised envelope.

In general, the high grade zones identified within the Los Calatos porphyry system are associated with a well-developed breccia system, and a younger diatreme complex.

Based on a preliminary Company assessment of the drilling, and the fact that the high grade breccia zone occurs near surface, and persists at depth, the breccia zone will broadly be the focus of an initial, Stage 1, open pit.

The Phase 4 drilling program has therefore been reduced from 100,000 metres to 61,000 metres to focus on the high grade breccia zone, in addition to the high grade zones associated with the diatreme complex. The objective of the remaining drilling is threefold:

·; Definition of geological domains: Delineate the areal extent of the high grade zones that have been identified within the Los Calatos mineralised envelope, and confirm their geological attributes;

·; High grade breccia: Upgrade that part of the current Inferred Mineral Resource which will potentially be included in a Stage 1 open pit, to an Indicated Mineral Resource, ahead of the planned pre-feasibility study; and

·; Diatreme Complex: Develop a better understanding of the high grade zones that occur within, and peripheral to, the diatreme complex, and their lateral and vertical continuity.

 

 

 

Proposed work program

The revised Phase 4 drilling program is scheduled for completion in early Q3 2012, following which the Company will announce an updated JORC Mineral Resource Estimate. This resource update will be followed by the commissioning of a pre-feasibility study in early 2013.

The Company is undertaking an internal mining study to identify the main requirements of the pre-feasibility study. This will address aspects such as pit optimisation studies (and key input parameters), planned seawater pipeline from the coast, the design of a port/loading facility for concentrate, the quantification of the metallurgical testwork required to evaluate the use of sea water for flotation purposes (and refine recoveries) and access to the regional power grid.

As part of the mining study, several mining scenarios will be evaluated involving the phased development of Los Calatos, commencing with an initial, Stage 1, open pit. These studies will be finalised by the end of 2012, following the completion of an updated Mineral Resource Estimate.

 

 

 

 

 

William Howe

Managing Director

 

 

 

 

 

For further information contact:

 

Metminco Limited

Office: +61 (0) 2 9460 1856

William Howe - Managing Director

Mobile: +56 9 9308 7900

Stephen Tainton - GM Investor Relations

Mobile: +61 (0) 477 299 411

Canaccord (Australia)

Office: +61 (0) 2 9263 2700

Warwick Grigor

Canaccord Genuity (UK)

Office: +44 (0) 20 7523 8000

Andrew Chubb

Liberum (UK)

Tim Graham

 

Office: +44 (0) 20 3100 2225

Buchanan Communications

Office: +44 (0) 20 7466 5000

Tim Thompson

Gordon Poole

 

 

 

Company Background

Metminco is a dual ASX and AIM listed company with a portfolio of copper, molybdenum and gold projects in Peru and Chile.

The Los Calatos Project, located in southern Peru, has a Mineral Resource of 2,316 million tonnes, comprising an Indicated Resource of 885 million tonnes at 0.42% Cu and 270 ppm Mo, and an Inferred Resource of 1,431 million tonnes at 0.40% Cu and 180 ppm Mo (at a 0.2% copper cut-off).

The Chilean assets include the Mollacas copper project with a Mineral Resource of 34.3 million tonnes consisting of a Measured Resource of 19.4 million tonnes at 0.45% Cu and 0.16g/t Au, an Indicated Resource of 9.4 million tonnes at 0.34% Cu and 0.16g/t Au, and an Inferred Resource of 5.5 million tonnes at 0.26% Cu and 0.15g/t Au (at a 0.2% copper cut-off); and the Vallecillo gold/zinc project with a Mineral Resource of 10.1 million tonnes consisting of an Indicated Resource of 7.9 million tonnes at 1.14g/t Au; 11.4g/t Ag; 1.32% Zn; 0.29% Pb and an Inferred Resource of 2.2 million tonnes at 0.78g/t Au; 8.2g/t Ag; 0.58% Zn; 0.26% Pb (at a cut-off grade of 0.3g/t Au).

The Company also has a number of early stage exploration projects where initial exploration activities have identified anomalous copper, molybdenum and gold values.

 

Competent Persons Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Colin Sinclair, BSc, MSc, who is a Member of the Australasian Institute of Mining and Metallurgy and is a full-time employee of the Company as Executive General Manager.

Colin Sinclair has sufficient experience (over 30 years) which is relevant to the style of mineralisation, type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results'. Mr Sinclair, as Competent Person for this announcement, has consented to the inclusion of the information in the form and context in which it appears herein.

 

Forward Looking Statement

All statements other than statements of historical fact included in this announcement including, without limitation, statements regarding future plans and objectives of Metminco are forward-looking statements. When used in this announcement, forward-looking statements can be identified by words such as 'anticipate", "believe", "could", "estimate", "expect", "future", "intend", "may", "opportunity", "plan", "potential", "project", "seek", "will" and other similar words that involve risks and uncertainties.

These statements are based on an assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that, as at the date of this announcement, are expected to take place. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, its directors and management of Metminco that could cause Metminco's actual results to differ materially from the results expressed or anticipated in these statements.

The Company cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and investors are cautioned not to place undue reliance on these forward-looking statements. Metminco does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this announcement, except where required by applicable law and stock exchange listing requirements.

 

APPENDIX 1

 

Los Calatos Project: Summary of Phase 4 drill hole results.

 

Hole ID

Easting

Northing

RL

Azimuth true

Dip

Hole depth

Depth (m)

Interval

Cu

Mo

(m)

(m)

(m)

(degrees)

(degrees)

(m)

From

To

(m)

(%)

(ppm)

CD-50

286415

8130424

2978

39

-63

993.3

183

855

672

0.28

217

CD-51

286941

8130464

2916

205

-60

918

383

587

204

0.32

295

CD-52

287111

8130240

2936

238

-69

674.5

318

415

97

0.42

9

CD-53

286312

8130086

3047

31

-64.5

1976.4

670

1089

419

0.42

223

includes

905

1039

134

0.69

293

1163

1323

160

0.15

21

1371

1634

263

0.39

161

1682

1780

98

0.16

80

CD-54

286502

8130076

3020

23

-70

1577.35

482

836

354

0.25

165

853

921

68

0.23

292

933

957

24

0.30

142

974

1013

39

0.36

129

1213

1279

66

0.26

7

1351

1390

39

0.12

11

1506

1572

66

0.21

78

CD-55

287415

8130772

2924

207

-59

1588.25

762

816

54

0.47

51

830

998

168

0.36

18

1125

1154

29

0.13

101

1240

1435

195

0.26

55

CD-56

287331

8130859

2951

216

-64.5

2003.9

980

1270

290

0.80

184

includes

990

1102

112

1.14

244

1289

1385

96

0.47

151

1401

1734

333

0.43

494

includes

1672

1732

60

0.75

627

1772

2004

232

0.55

146

includes

1809

1843

34

1.02

151

CD-57

286733

8131226

3041

201

-72

1894.8

711

826

115

0.44

634

850

870

20

0.37

440

879

1894

1015

0.51

233

includes

1197

1282

85

1.05

221

CD-58

286423

8131111

2983

206.5

-64

1263.2

870

1263

393

0.26

155

 

 

 

Hole ID

Easting

Northing

RL

Azimuth true

Dip

Hole depth

Depth (m)

Interval

Cu

Mo

(m)

(m)

(m)

(degrees)

(degrees)

(m)

From

To

(m)

(%)

(ppm)

CD-59

286429

8130214

2997

31.5

-61

1277.9

413

601

188

0.20

116

700

1002

302

0.17

145

1014

1194

180

0.22

99

CD-60

287001

8130475

2921

221.5

-65.5

997.35

70

103

33

0.17

4

542

819

277

0.24

146

912

955

43

0.13

12

CD-61

286842

8131190

3062

204.5

-63

1753.35

767

1700

933

0.51

407

includes

878

1187

309

0.97

1,052

CD-62

287298

8130550

2913

212.5

-60.5

1195.05

652

976

324

0.53

51

CD-63

287047

8130677

2941

200

-60

1137.7

140

231

91

0.16

9

424

451

27

0.24

14

666

685

19

1.32

23

698

987

289

0.35

93

1006

1051

45

0.24

20

CD-64

286703

8131161

3030

206

-60

1419.9

345

391

46

0.51

37

464

1420

956

0.48

408

includes

494

557

63

1.07

565

includes

914

956

42

1.23

2224

CD-65

287412

8130778

2940

200

-65

1804.2

1087

1262

175

0.17

39

1414

1438

24

0.18

75

CD-66B

286277

8130089

3064

20

-65

1812.6

688

1139

451

0.24

142

1254

1812

558

0.29

63

CD-67

286500

8130080

3035

24

-65

1538.25

490

844

354

0.22

80

899

1003

104

0.22

98

1054

1205

151

0.21

101

CD-68

286723

8131475

3047

208.5

-72

1807.5

CD-69

286582

8130422

2955

35

-63

856.2

70

233

163

0.20

84

323

417

94

0.19

264

428

659

231

0.27

260

CD-70

287054

8130737

2934

215

-67

1528.85

608

1382

774

0.30

131

1399

1423

24

0.11

6

includes

1254

1311

57

0.92

343

 

 

 

Hole ID

Easting

Northing

RL

Azimuth true

Dip

Hole depth

Depth (m)

Interval

Cu

Mo

(m)

(m)

(m)

(degrees)

(degrees)

(m)

From

To

(m)

(%)

(ppm)

CD-71

287214

8130937

3024

212

-62

1487.45

608

631

23

0.24

1

1028

1253

225

0.23

134

1285

1356

71

0.23

34

CD-72

286715

8130449

2941

41

-61

570

34

170

136

0.16

25

200

325

125

0.25

49

405

468

63

0.28

137

CD-73

286924

8131264

3018

207

-62

1912.5

1256

1903

647

0.36

92

includes

1385

1464

79

0.53

59

CD-74

286293

8131005

2956

217

-66

1045.5

481

569

88

0.13

29

651

690

39

0.11

21

716

1037

321

0.15

13

CD-75B

286507

8130078

3028

18.7

-74

1559.2

635

1265

630

0.22

213

1351

1530

179

0.61

79

includes

1411

1478

67

1.07

139

CD-76

287338

8130382

2920

220.7

-60.5

926.15

539

597

58

0.45

12

685

813

128

0.59

43

CD-77

286296

8130092

3036

14

-74.5

1595.35

826

1157

331

0.20

133

1222

1482

260

0.26

87

 

 

 

APPENDIX 2

 

Figure 1: Cu (%) x Thickness (m) contour plan showing Los Calatos drilling program.

Please follow link to view diagram.

http://www.rns-pdf.londonstockexchange.com/rns/5553I_-2012-7-26.pdf

 

Figure 2: Section 10300E showing the high grade Cu zones associated with the mineralised breccia system.

Please follow link to view diagram.

http://www.rns-pdf.londonstockexchange.com/rns/5553I_-2012-7-26.pdf

 

Figure 3: Section 11200E showing the high grade Cu zones associated with the diatreme complex.

Please follow link to view diagram.

http://www.rns-pdf.londonstockexchange.com/rns/5553I_-2012-7-26.pdf

 

Figure 4: Section 10500E showing the low to medium Cu grades associated with the mineralised porphyry.

Please follow link to view diagram.

http://www.rns-pdf.londonstockexchange.com/rns/5553I_-2012-7-26.pdf

 

 

 

 

 

Abbreviated Glossary

Assay

An analysis to determine the presence, absence or quantity of one or more chemical components.

 

Base Metal

A metal, such as copper, lead, nickel, zinc or cobalt.

 

Block caving

A method of underground mining in which large blocks of ore are undercut, causing the ore to break or cave under its own weight enabling extraction of the ore at a relatively low cost.

 

Breccia

Rock fragmented into angular components.

 

Circuit

A processing facility for removing valuable minerals from the ore so that it can be processed and sold.

 

Copper (Cu)

A ductile, malleable base metal with a myriad of uses in construction (piping, wire) and electronics due to its high electrical and thermal conductivity and good resistance to corrosion.

 

Copper equivalent (CuEq)

Copper equivalent is generally based on the value of the non-copper by-products (such as gold and molybdenum) relative to the copper price. For example, at a long term copper price of US$2.75 per pound of copper and a molybdenum price of US$12.50 per pound, 1 pound of molybdenum is equivalent to 4.5 pounds of copper.

 

Diamond drilling / drill hole

A method of obtaining a cylindrical core of rock by drilling with a diamond impregnated bit.

 

Diatreme

A diatreme is a breccia-filled volcanic pipethat was formed by a gaseous explosion. Diatremes often breach the surface and produce a tuff cone, a filled relatively shallow crater known as a maar, or other volcanic pipes.

 

Drill core

The long cylindrical piece of rock brought to surface by diamond drilling.

 

Feasibility Study

A feasibility study is an evaluation of a mineral resource to determine whether it can be mined effectively and profitably. It includes the detailed study of reserve estimation, mining methods evaluation, processing technique analysis, capital and operating cost determination and the process effect on the environment and community. This detailed study forms the basis for capital estimation, and provides budget figures for the development of the project. It requires a significant amount of formal engineering work and an accuracy within 10 to 15%.

 

Geo-domain

Homogeneous geological domains within a deposit identified on the basis of spatial continuity of grades and geological features such as lithology, mineralogy and alteration.

 

Gold (Au)

A heavy, soft, ductile, malleable precious metal used in jewellery, dentistry, electronics and as an investment.

 

Grade

The amount of valuable metal in each tonne or ore, expressed as grams per tonne for precious metals and percent in the case of copper and parts per million (ppm) in the case of molybdenum. Cut-off grade - is the minimum metal grade at which a tonne of rock can be processed on an economic basis. Recovered grade - is the actual metal grade realised by the metallurgical process and treatment of ore, based on actual experience or laboratory testing.

 

Indicated Mineral Resource

An 'Indicated Mineral Resource' is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

 

Inferred Mineral Resource

An 'Inferred Mineral Resource' is that part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

 

JORC Code

The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.

 

Measured Mineral Resource

A 'Measured Mineral Resource' is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are spaced closely enough to confirm geological and grade continuity.

 

Metallurgy

The science and technology of extraction of metals from their ores and the refining of metals.

 

Mineralisation

The concentration of metals and their chemical compounds within a body of rock.

 

Mineralised envelope

The boundary constraining the extent of the identified mineralisation, as delineated by a nominated grade or cut-off.

 

Mineral Resource

A concentration or occurrence of material of intrinsic economic interest in or on the Earth's crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories.

 

Molydenum (Mo)

Molybdenum is commonly a by-product of copper mining. It has the ability to withstand extreme temperatures and has a high resistance to corrosion. Molybdenum is widely used as an alloy agent in stainless steel. It is also used to manufacture aircraft parts and industrial motors.

 

NPV

Net present value is the difference between the present value of a future cash flow from an investment and the amount of investment, where the present value of the expected cash flow is computed by discounting the cash flow at the required rate of return.

 

Open Pit

A mine that is entirely on surface. Also referred to as open-cut or open-cast mine.

 

Ore

Rock containing mineral(s) or metals that can be economically extracted to produce a profit.

 

Pit optimisation study

Pit optimisation studies are used for open pit mine planning to determine those pit limits and mining sequences that yield maximum financial returns based on defined technical parameters, operating costs and commodity prices.

 

Porphyry

A rock consisting of larger crystals embedded in a more compact finer grained groundmass.

 

Porphyry copper deposit

A copperdeposit which is associated with porphyritic intrusive rocks and the fluids that accompany them during the transition and cooling from magma to rock. Porphyry copper deposits are typically mined by open-pit methods.

 

Pre-feasibility study

A preliminary assessment of the technical and economic viability of a proposed project. Alternative approaches to various elements of the project are compared, and the most suitable alternative for each element is recommended for further analysis. Costs of development and operations are estimated. Anticipated benefits are assessed such that some preliminary economic criteria for evaluation can be calculated. Preliminary feasibility studies are completed by a small group of multi-disciplined technical individuals and have an accuracy within 20 to 30%.

 

Recovery

A term used in process metallurgy to indicate the proportion of valuable material obtained in the processing of an ore. It is generally stated as a percentage of valuable metal in the ore that is recovered compared to the total valuable metal present in the ore.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBKADPPBKKOOB
Date   Source Headline
12th Oct 20185:20 pmRNSMetminco
9th Oct 20187:00 amRNSChange in Substantial Shareholding
4th Oct 20187:00 amRNSAIM delisting and Share Registry update
3rd Oct 20187:00 amRNSCapital Raising
19th Sep 20187:00 amRNSAcquisition:DSO Nickel Laterite Project-Financing
18th Sep 20188:06 amRNSASX Voluntary Suspension Update
17th Sep 20187:33 amRNSVoluntary Suspension ASX
14th Sep 20187:00 amRNSResults of EGM
13th Sep 20188:58 amRNSHalf-year Report
13th Sep 20187:30 amRNSSuspension - Metminco Limited
13th Sep 20187:13 amRNSTemporary Suspension
30th Aug 20187:00 amRNSTesorito Drilling Results
13th Aug 20187:00 amRNSGM Statement- EGM Notice of Meeting
2nd Aug 20188:25 amRNSAppointment of Exploration Director Colombia
31st Jul 20187:00 amRNSJune 30th 2018 Activity Statement & Appendix 5B
31st Jul 20187:00 amRNSTesorito Drilling Update
18th Jun 20181:55 pmRNSAppointment of Broker
5th Jun 20187:00 amRNSChange of Registered Office
5th Jun 20187:00 amRNSStrategy/Company/Ops Update
29th May 20187:00 amRNSCompany Secretary Change
29th May 20187:00 amRNSLatest Presentation
29th May 20187:00 amRNSResult of AGM
22nd May 20187:00 amRNSIssue of Equity
17th May 20188:19 amRNSLatest Presentation 121 Conference London
17th May 20187:00 amRNSHolding(s) in Company
17th May 20187:00 amRNSLatest Presentation 121 Conference London
9th May 20187:00 amRNSCeasing to be a Significant Shareholder
4th May 20188:45 amRNSChange in Holding(s) in Company
1st May 20188:25 amRNSCorporate Governance Statement
1st May 20188:03 amRNSIssue of Equity
1st May 20187:35 amRNSMarch 2018 Qtr Activities Report & App 5B
1st May 20187:00 amRNSAnnual Financial Report
26th Apr 20189:16 amRNSAGM Statement
26th Apr 20187:00 amRNSAnnouncement re: Rights Issue
20th Apr 20187:00 amRNSAnnouncement re: Rights Issue
4th Apr 201811:37 amRNSHolding(s) in Company
3rd Apr 20187:00 amRNSAnnual Financial Report
28th Mar 20187:00 amRNSIssue of Equity
27th Mar 20188:43 amRNSLatest Presentation
26th Mar 20189:00 amRNSAnnouncement re: Rights Issue
23rd Mar 20187:10 amRNSDirectorate Change
23rd Mar 20187:03 amRNSAnnouncement re: Rights Issue
23rd Mar 20187:00 amRNSAnnouncement re: Rights Issue
21st Mar 20187:00 amRNSAnnouncement re: Rights Issue
19th Mar 20187:00 amRNSDirectorate Change
14th Mar 20189:17 amRNSHolding(s) in Company
12th Mar 20187:00 amRNSAnnouncement re: Rights Issue
5th Mar 20187:00 amRNSAnnouncement re: Rights Issue
27th Feb 201810:41 amRNSStatement re Meeting 2 March 2018
8th Feb 20187:57 amRNSSubstantial Shareholder Dealing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.