·; XTIERRA STARTS OXIDE ORE PILOT PLANT TESTS AT BILBAO

 

Dublin, May 13, 2010 - Minco plc (AIM - "MIO"), the Irish exploration and development company reports that its Toronto Venture Exchange listed subsidiary, Xtierra Inc. (TSXV-XAG), has reported that the pilot plant test work program proposed for the near surface oxide ore at Bilbao has commenced. The protocol for the test work was recently established with the assistance of Xtierra's independent metallurgical consulting team.

 

Laboratory test work results on the Oxide Ores, as reported in January, 2010, were positive and indicate a practical and economic solution to the processing and metal recovery for the near-surface oxide resources at Bilbao. Replicating these results in a pilot plant will indicate that similar results can be expected in a full-scale industrial application.

 

The pilot plant test work program and schedule comprises five component parts: (1) collection of a representative bulk sample of approximately 20 tonnes is currently underway from two existing underground levels which are within the oxide ore wireframe. Once crushed and sampled, 4 representative composites of 5 tonnes each will be established; (2) a 0.5 tonne/hour pilot plant comprised of a crusher, ball mill, classifier, flotation cells and related equipment has been sourced and will be available to the Company over the next two weeks; (3) a Wet High Intensity Magnetic Separator (WHIMS) has been sourced and will be available in approximately 4-6 weeks time; (4) the crusher, ball mill and WHIMS will be set up in close proximity to the Bilbao project site. The four, 5 tonne sample composites will be batch processed producing approximately four, 3 tonne non-magnetic concentrates containing the payable metals. The magnetic material, containing a high percentage of iron oxide, will be kept on site and marketing of this reject material to the cement industry will follow; (5) the non-magnetic material will be transported to the Institute of Metallurgy at the University of San Luis Potosi where the acid leach, flotation and cyanidation processes will take place at a rate of 20 kg/hr, 24 hr/day over a 15 day period. The tanks, agitators, pumps and electric controls for the leach process are currently being fabricated and are scheduled to be installed at the Institute of Metallurgy by the beginning of June.

 

The oxide ore pilot plant test work and related reports are scheduled to be completed in the third quarter 2010. Metallurgical test work on the transition (mixed oxide and sulphide) ore as well as on the sulphide ore is currently in progress. Results and related reports on this work are expected in June 2010.

 

Comment

Terence McKillen, CEO of Xtierra said, "Completion of the pilot plant test work on the near surface oxide ores at Bilbao will be an important milestone for the project. Confirmation of metal recoveries in a larger-scale process plant replicating continuity of the flow sheet process will establish the recoveries of the various metals that can be achieved in a commercial process." Mr. McKillen added, "The metallurgical test work is an important final step in the completion of the Bilbao feasibility study and will enable final economic studies on the project to be completed."

 

Qualified Person

The above information has been reviewed and verified by Mr. Terence N McKillen, B.A. (MOD), M.A., M.Sc., P.Geo, Chief Executive Officer. Mr. McKillen is the Qualified Person for the purposes of the AIM Guidance Note on Mining, Oil and Gas Companies dated March 2006. Mr. McKillen is a graduate in Natural Sciences (Geology) from Trinity College Dublin and holds a Master of Science degree in Mineral Exploration and Mining Geology from the University of Leicester. He has 40 years of exploration experience in Ireland and internationally.

 

About Minco

Minco Plc is an AIM quoted base metals exploration and development company engaged in zinc exploration on the Pallas Green property in Ireland in a joint venture with Xstrata Zinc and investments in zinc-silver projects in Mexico through its 39.7% shareholding in Xtierra Inc. listed on the TSX Venture Exchange (Toronto) under the symbol "XAG".

 

For further information, www.minco.ie or contact:

John Kearney: Executive Chairman

 

+1 416 362 6686

Terence McKillen: Chief Executive

 

+1 416 362 8243

Danesh Varma: CFO & Company Secretary

 

+44 (0) 8452 606 034

Minco - Ireland Contact: Peter McParland

+353 (0)46 907-3709

John Frain/Fergal Meegan: (NOMAD) Davy

 

+353 (0)1 6796363

Kealan Doyle/Nicholas Nicolaides: (Broker) Beaufort Associates (Broker)

+44 (0)20 7930 8222

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSFSFLDFSSELI
Date   Source Headline
28th Sep 20077:03 amRNSInterim Results
19th Sep 20074:20 pmRNSMexican Projects Financing
17th Sep 20075:07 pmRNSAGM Statement
10th Sep 20079:48 amRNSDrilling Report
17th Aug 20075:04 pmRNSAIM Rule 26
30th Jul 20077:00 amRNSIssue of Equity
17th Jul 20077:30 amRNSDrilling Report
6th Jul 20077:00 amRNSMinco Pallas Green Update
28th Jun 20077:01 amRNSAGM & ANNUAL REPORT & A/CS
14th Jun 20079:19 amRNSSale of Minera Sisa
22nd May 20073:11 pmRNSIssue of Equity
10th May 20077:01 amRNSFinal Results
4th Apr 200710:05 amRNSPallas Green Drilling Update
22nd Mar 20077:00 amRNSExploration Update
15th Mar 20078:49 amRNSBilbao Update
26th Feb 20077:00 amRNSBilbao High Grade
24th Jan 20079:28 amRNSPallas Green Drilling Update
15th Jan 20077:00 amRNSPreliminary Results
13th Dec 20067:01 amRNSDrilling Results and Update
20th Nov 20069:40 amRNSDrilling Update
9th Nov 20067:00 amRNSAppointment of Director
24th Oct 20067:01 amRNSBilbao Project Update
5th Oct 20067:01 amRNSPallas Green Drilling Update
3rd Oct 20067:30 amRNSDrilling Update
28th Sep 200611:19 amRNSInterim Results
27th Sep 20064:04 pmRNSChange of Registered Office
15th Sep 20069:14 amRNSAnnual General Meeting
30th Jun 20065:45 pmRNSAnnual Report and Accounts
23rd Jun 20067:30 amRNSDrilling Report
19th Jun 200611:18 amRNSFinal Results
12th Jun 20067:30 amRNSDrilling Report
11th Apr 20063:47 pmRNSIssue of Shares
7th Mar 20067:02 amRNSNew Option & Progress Update
16th Feb 20067:01 amRNSDrilling Report
14th Feb 20069:55 amRNSHolding(s) in Company
1st Feb 20064:29 pmRNSLaguna Silver Project -Amend
1st Feb 20067:00 amRNSLaguna Silver Project Update
4th Jan 20067:00 amRNSDirectorate Change
16th Dec 20051:12 pmRNSDrilling Report
14th Dec 20051:00 pmRNSDirectorate Change
12th Dec 20052:30 pmRNSAdditional Listing
25th Nov 20057:00 amRNSAdditional Listing
23rd Nov 20057:01 amRNSDrilling Report
14th Nov 200511:46 amRNSIssue of Equity
10th Nov 20057:00 amRNSDrilling Results
31st Oct 20057:00 amRNSBankable Feasability Study
25th Oct 20057:00 amRNSIssue of Equity
18th Oct 20057:00 amRNSChange of Adviser
26th Sep 20057:00 amRNSDrilling Report
22nd Sep 20059:53 amRNSAdditional Listing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.