25 February 2011
 



PALLAS GREEN ZINC-LEAD PROJECT ECONOMIC AT ITS CURRENT STAGE

UPDATED JORC COMPLIANT RESOURCE ESTIMATE OF 25.9 MILLION TONNES

€13 MILLION BUDGET PROPOSED FOR 2011

2010 DRILLING UPDATE

 

Dublin, 25 February, 2011 - Minco Plc (London AIM | MIO), reports that Xstrata Zinc has informed Minco that Xstrata's preliminary assessment indicates that the Pallas Green Zinc-Lead Project in Co. Limerick, Ireland, in which Minco holds a 23.6% participating interest, is economic at its current stage.

 

Xstrata Zinc has proposed a €13 million (US$18 million) exploration and development programme for 2011. The proposed budget comprises continued definition and exploration drilling coupled with an initial Pre-feasibility Study.

 

The Pre-Feasibility Study and related costs are budgeted at about €3 million, while the proposed €10 million drilling program is split about two thirds infill definition drilling and one third exploration drilling. Planned drilling is about 100,000 metres in about 230 holes.

 

Updated Resource Estimate

Xstrata has provided Minco with a revised JORC compliant resource estimate as of December 31, 2010 and dated February 18, 2011. The revised resource is calculated at both a 4% and a 6% cut off. The 4% zinc equivalent cut off resource amounts to 25.9 million tonnes of inferred resources at an average grade of 7.51% Zn and 1.38% Pb (8.89% Zn eq) while the 6% zinc equivalent cut off resource amounts to 17.6 million tonnes of inferred resources at an average grade of 8.96% Zn and 1.72% Pb (10.68% Zn eq).

 

The new resource (at the 6% Zn eq cut off) is 56% greater in tonnage than the previously published JORC compliant resource (also calculated at 6% cut off) published in August 2009 while the new resource (at the 4% Zn eq cut off) is approximately 7.5% greater than the revised resource published in August 2010.

 

2011 Exploration Programme

Minco has not yet agreed to the proposed 2011 work programme or the allocations between exploration drilling in the Caherconlish area and infill definition drilling of the Tobermalug Zone. Minco has proposed that drilling in 2011 should focus on ongoing exploration in the prospective Caherconlish area and also within the wider Pallas Green property, where only about 25% of the prospective trend has been explored in any detail.

 

Minco believes that the lead/zinc deposits at Pallas Green have not yet been fully delineated and that the expected larger tonnage, and higher grade, parts of the deposit have not yet been found. Minco is also confident that further exploration will lead to an increase in the size of the Pallas Green resource and to the discovery of new mineralized zones within the Caherconlish area, as has been demonstrated over the past three years, and to new discoveries elsewhere on the property.

 

 

Pre-Feasibility Study in 2011

Xstrata's proposed 2011 programme envisages the preparation of a Pre-Feasibility Study for a 4,500 tonnes per day mine, with an annual production of about 150,000 tonnes of zinc and an indicated mine start-up date of 2017.

 

Exploration Update - 2010 Drilling Programme

Approximately 168 drill holes were completed or in progress at the end of 2010 for a total of 60,176 metres drilled during the year. Nineteen drill rigs continue to explore and define the greater Tobermalug area, as well as Knockroe and Caherconlish South. It is expected that additional drill rigs will be added to the programme in 2011 to handle the enlarged drilling programme.

 

For much of the fourth quarter 2010, drilling was focused on lateral extension targets around the perimeter of the lenses of zinc-lead mineralisation which constitute the Tobermalug and Northwest Extension (NWX) deposits; in directional drilling of selected infill holes at Tobermalug and NWX; and in continued drilling at Knockroe. A more regional drilling programme continued to test targets north of Stonepark, in the area between Knockroe and Tobermalug and south, and to the east and west of Knockroe. A number of technical issues including cavities, mud or sand infills and thick overburden cover and, occasionally, dyke intersections prevented some holes reaching target depths.

 

The programme of perimeter drilling to test the extensions of the Tobermalug and NWX deposits has continued to provide encouraging results, some with economically significant intersections and rarely with barren holes, confirming the extensive nature of the mineralisation and the necessity to continue with a programme of step-out drilling around the periphery of all of the known lenses of mineralization.

 

The attached table contains the most significant recent result from the 2010 drilling, not previously released. Not all drill holes are reported.

 

Minco is of the opinion that the Tobermalug, NWX, Knockroe and Caherconlish South mineralised zones form part of the same Caherconlish Cluster. Widely spaced drill holes within the confines of the Caherconlish Cluster between Knockroe and the property boundary to the west have intersected good widths of low grade, breccia hosted zinc-lead mineralisation, demonstrating potential for the discovery of significant additions to the resource base.

 

New Geophysical Survey

TESLA - IMC International Limited has been contracted to complete about 22 line kilometres of 2D hammer seismic geophysical survey over the Caherconlish area commencing in early March. It is hoped that the survey data will assist with the identification of the southern boundary structure, the Ballyneaty Fault, with which higher grade and greater thicknesses of mineralisation might be associated. Drilling to explore the boundary fault has been postponed until completion of the geophysical survey.

 

Commenting on the exploration drilling at Pallas Green, Terence McKillen, Minco's Chief Executive, stated "The Joint Venture achieved a record 60,000 metres of drilling in 2010 which led to a doubling of the JORC compliant resource estimate for the Caherconlish area zinc deposits (reported August 5, 2010).

Lateral drilling around the periphery of the Tobermalug deposit continues to indicate both high-grade and low grade mineralization suggesting that the limits of the deposit have not yet been fully defined."

 

Nineteen drill rigs continue to operate on the Pallas Green property, including a drill which is evaluating the Devico and Navi-drilling systems for directional drilling of deeper holes.

"We look forward to the results of the new geophysical survey and to resumption of drilling to the south of Knockroe and Tobermalug, where we believe the important southern boundary fault is located which is expected to host higher grades and greater thicknesses of mineralisation, and to the west of Knockroe, between Knockroe and Stonepark, where we believe there is significant potential for the discovery of additional lenses of mineralisation." Mr. McKillen added.

 

Hole #

From (m)

To (m)

Interval (m)

Zinc (%)

Lead (%)

Target

MN-636-203

410.25

414.80

4.55

5.02

0.58

Tobermalug

MN-636-197

419.00

422.60

3.60

3.34

0.23

Tobermalug

MN-2529-127

including

444.45

447.00

448.35

448.35

3.90

1.35

4.75

10.44

0.59

0.41

Tobermalug

MN-636-208

and

339.10

350.00

341.65

352.60

2.55

2.60

2.44

10.54

0.19

2.99

West of Tobermalug

MN-2529-119

Including

and

375.80

386.30

10.50

3.15

2.80

2.64

4.11

4.53

0.62

0.42

1.81

East of Tobermalug

MN-636-217

and

309.40

326.00

311.55

331.80

2.15

5.80

4.11

7.27

0.68

2.76

NWX

MN-636-196

308.10

318.20

10.10

7.67

0.35

NWX

MN-636-209

363.25

365.70

2.45

10.18

1.87

NWX

MN-636-201

and

and

335.30

349.25

355.95

338.10

350.45

358.10

2.80

1.20

2.15

10.25

6.87

7.27

2.67

1.18

0.03

NWX

MN-2529-103A

460.25

462.25

2.00

4.68

1.74

Knockroe

 

NOTE: The above table contains the most significant recent results. Not all drill holes are reported. 

 

Qualified Person

Xstrata Zinc is the project operator for the Pallas Green Joint Venture Project and is responsible for both fieldwork and resource evaluation including, but not limited to, sampling, submittal of samples for assay, assay verification, metallurgical evaluation and QA/QC. Calculation of resources reported in this news release was conducted by Mr. Alan Huard, P.Geo. and Ms. Aline Côté, P.Geo., Qualified Persons, as defined in Canadian National Instrument 43‐101 "Standards for Disclosure for Mineral Projects "of the Canadian Securities Administrators and also Competent Persons as defined by the 2004 JORC Code.

 

Mr. Terence N McKillen, B.A. (MOD), M.A., M.Sc., P.Geo, Chief Executive Officer. Mr. McKillen is the Qualified Person for the purposes of the AIM Guidance Note on Mining, Oil and Gas Companies dated March 2006. Mr. McKillen is a graduate in Natural Sciences (Geology) from Trinity College Dublin and holds a Master of Science degree in Mineral Exploration and Mining Geology from the University of Leicester. He has 40 years of exploration experience in Ireland and internationally.

 

About Minco

Minco PLC is an AIM quoted precious and base metals exploration and development company

engaged in zinc-lead exploration on the Pallas Green property in Ireland in a joint venture with Xstrata Zinc and investments in zinc‐silver projects in Mexico through an equity holding in Xtierra Inc. listed on the TSX Venture Exchange (Toronto) under the symbol "XAG".

 

 

For further information, www.minco.ie or contact:

 

John Kearney: Executive Chairman

 

+1 416 362 6686

Terence McKillen: Chief Executive

 

+1 416 362 8243

Danesh Varma: CFO & Company Secretary

 

+44 (0) 8452 606 034

Minco - Ireland Contact: Peter McParland | Maria Flood

+353 (0)46 907-3709

John Frain/Fergal Meegan: (NOMAD) Davy

 

+353 (0)1 6796363

Barry Gibb/ Saif Janjua: (Corporate Advisor | Broker) Beaufort International

+44 (0)20 7930 8222

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCKMGZZZDDGMZZ
Date   Source Headline
8th Jun 20129:00 amRNSXtierra Feasibility Update Bilbao
1st Jun 20124:29 pmRNSXtierra Drilling Update
16th May 201212:00 pmRNSFurther re Buchans
8th May 20122:29 pmRNSFurther information - Woodstock Manganese Property
1st May 201210:21 amRNSHolding(s) in Company
30th Apr 201212:00 pmRNSInvestment in Buchans Minerals Corporation
3rd Feb 20124:57 pmRNSXtierra Drilling Update
16th Jan 20123:08 pmRNSBoard Appointments
13th Jan 20124:55 pmRNSHolding(s) in Company
24th Nov 201112:15 pmRNSXtierra Drilling
7th Nov 20117:00 amRNSDirector Dealings
2nd Nov 20115:00 pmRNSAcquisition of Pallas Green project completed
28th Oct 20114:04 pmRNSCompletion of Disposal
24th Oct 20115:32 pmRNSResults of General Meetings
30th Sep 20117:01 amRNSPallas Green Document Availability
30th Sep 20117:00 amRNSInterim Results
9th Sep 20112:53 pmRNSXtierra Drilling
3rd Aug 20117:00 amRNSPallas Green Project Update
22nd Jul 20117:00 amRNSXtierra Drilling
20th Jul 20119:48 amRNSHolding(s) in Company
13th Jul 20117:00 amRNSAcquisition of remaining interest in Pallas Green
13th Jul 20117:00 amRNSProposed Sale of Pallas Green Project
4th Jul 20113:57 pmRNSDirector Resignation
30th Jun 20114:22 pmRNSAnnual Financial Report
28th Jun 20112:51 pmRNSXtierra Drilling Update
27th May 20117:00 amRNSXtierra Bilbao Update
4th Apr 20117:00 amRNSPlacing
28th Mar 20117:00 amRNSPallas Green Drill Results and Update
3rd Mar 20117:00 amRNSXtierra Financing
25th Feb 20117:00 amRNSOperational Update
24th Feb 201110:38 amRNSExercise of Warrants
31st Dec 201010:36 amRNSIssue of Equity
24th Dec 20109:42 amRNSXtierra Financing
22nd Nov 201010:01 amRNSHolding(s) in Company
11th Oct 20109:09 amRNSPallas Green Drilling Update
7th Oct 201010:38 amRNSHolding(s) in Company
6th Oct 20108:56 amRNSXtierra Update
30th Sep 20107:00 amRNSInterim Results
1st Sep 20107:00 amRNSPlacing
5th Aug 20108:14 amRNSPallas Green Resource Update
28th Jul 20107:00 amRNSDrilling Update
9th Jul 201010:52 amRNSXtierra Drilling
30th Jun 20109:13 amRNSNotice of AGM and Annual Report
9th Jun 20109:09 amRNSPallas Green Drilling Update
8th Jun 201010:43 amRNSHolding(s) in Company
13th May 20103:42 pmRNSXtierra Update
12th May 20108:25 amRNSPallas Green Drilling Update
6th May 20107:00 amRNSXtierra Bilbao Update
28th Apr 20108:27 amRNSPallas Green Drilling
16th Apr 20103:12 pmRNSXtierra Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.