Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMinco PLC Regulatory News (MIO)

  • This share is currently suspended. It was suspended at a price of 1.10
  • There is currently no data for MIO

Drilling Update

6 Feb 2008 07:01

Minco PLC06 February 2008 Minco plc • HIGHER GRADE MINERALISATION ENCOUNTERED AT BILBAO PROJECT, ZACATECAS • 107.9 METRES OF ZINC, LEAD, COPPER AND SILVER MINERALISATION INTERSECTED London, 6th February 2008 - Minco plc (MIO), the London AIM quoted precious andbase metals exploration and development company, is pleased to report OrcaMinerals Limited ("Orca"), its wholly-owned Canadian subsidiary, has encounteredhigher grade and wider intersections from initial holes of an infill drillingprogramme on the lead-silver-zinc-copper resource at the Bilbao Project, locatedin the Central Mexican Silver Belt in the State of Zacatecas. Thick intersections of high grade zinc-lead-silver-copper mineralisation havebeen made in both oxides and primary sulphides in boreholes X-32 and X-33 whichare the first two of 14 planned holes of a 3,600m infill diamond drillprogramme. This programme is designed to upgrade the categorisation of theexisting resource outlined in 2006-07 in compliance with NI 43-101. Highlights X-33 • 31.90m (oxide) 7.61%Pb+Zn, 0.36%Cu & 124g/t Ag. • 48.90m (mixed oxide/sulphide) 4.98%Pb+Zn, 0.21%Cu & 59g/t Ag • 27.10m (massive sulphide) 6.46%Pb+Zn, 0.27%Cu, 0.21g/tAu & 56g/t Ag Highlights X-32 • 51.00m (massive sulphide) 5.54% Pb+Zn, 0.27% Cu, 0.149g/t Au, 85g/tAg, 0.30%Sn including 29.00m (massive sulphide) 9.08%Pb+Zn, 0.25%Cu, 96g/tAg & 0.4%Sn At Bilbao, mineralisation occurs in several stacked zones with separatelenticular replacement bodies being developed in sedimentary sequences adjacentto the contact with a granite intrusive. The main sulphide body encountered inthe present drilling is not exposed at surface and is distinct from the oxidesoutcropping in the surface open-cut. Hole X-33 is located between holes X-13 and X-14 and confirms the continuity ofmineralization and has intersected 168 metres of significant mineralizationincluding three zones of oxide or mixed oxide-sulphide mineralization, two zonesof primary massive sulphides and a mineralised contact skarn. Hole X-32, located100 metres to the west of X-33 has also intersected similar mineralization withmassive sulphide mineralization being intersected over a 51 metre width. Themineralised intersections are listed in Table 1. Supergene Enrichment Two zones of supergene enrichment were encountered within these mineralisedsections at 65.0-70.0 metres and 127.0-131.0 metres respectively in hole X-33having higher silver and copper grades, e.g., 5.0 metres averaging 211g/tsilver, 0.5% copper and 6.07% lead+zinc in the upper section and 4.0 metresaveraging 127g/t silver, 0.59% copper and 2.86% lead+zinc in the lower section. Skarn Feeder Zone The newly discovered lower sulphidic skarnoid gold-copper-tin zone is believedto be proximal to a mineralizing conduit or fault zone through which epithermalsolutions migrated to higher levels. High grade silver veins encountered in holeX-26 drilled at the end of the Phase 1 drilling which returned 2,440g/t silver(2.44 kilograms per tonne) in a one metre section, with an average grade of1,339g/t silver over 3.0 metres may also be related to such a feeder structure. Hole No. Mineralized Type From To Width m Au g/t Ag g/t Pb % Zn % Cu % Sn % Pb+Zn % BodiesX-33 1 Oxide 38.10 70.00 31.90 0.015 124 4.89 2.72 0.36 7.61X-33 2 Oxide 76.00 85.00 9.00 0.014 80 1.75 5.10 0.24 6.85X-33 3 Mixed 127.00 175.90 48.90 0.067 59 3.01 1.97 0.21 4.98X-33 4 Sulphide 175.90 203.00 27.10 0.211 56 0.28 6.18 0.27 6.46X-33 5 Sulphide 203.00 226.00 23.00 0.278 10 0.05 0.12 0.28 0.17X-33 6 Skarn 234.00 262.85 27.85 0.161 12 0.08 0.45 0.14 0.11 0.59 X-32 1 Mixed 124.45 130.00 5.55 0.021 7 2.12 7.56 0.19 0.01 9.68X-32 2 Sulphide 157.35 160.00 2.65 0.011 26 2.59 3.21 0.06 0.21 5.80X-32 3 Sulphide 179.00 230.00 51.00 0.149 85 2.61 2.93 0.27 0.30 5.54X-32 Subzone 3.1a Sulphide 179.00 191.00 12.00 0.029 82 6.42 6.39 0.23 0.22 12.82X-32 or Subzone Sulphide 179.00 208.00 29.00 0.113 96 4.32 4.76 0.25 0.40 9.08 3.1bX-32 3.2 Au-Cu-Sn Sulphide 191.00 194.00 3.00 0.818 79 0.29 0.54 0.30 0.53 0.83X-32 3.3 Au-Ag Sulphide 212.00 219.00 7.00 0.566 119 0.10 0.08 0.20 0.02 0.18 Table 1 Mineralised sections in DDH X-32 and X-33 at Bilbao Exploration Director's Comment Commenting on the announcement, Terence McKillen, Director of Exploration andBusiness Development said: "The results of the initial infill drilling at Bilbaoare very encouraging. The increased thickness of mineralization intersected inthese holes compared to the initial drilling could significantly add to theoverall tonnage potential of both the oxide and sulphide resource at Bilbao. Thepresence of a lower sulphide skarn zone suggests that we may be proximal to oneof the epithermal feeder zones. Orca plans a programme of step-out and deeperdrilling at Bilbao to evaluate the full potential of the identified resource." Qualified Person The above information has been reviewed and verified by Mr. Roger Turner,Executive Chairman of Minco, for the purposes of the Guidance Note for Mining,Oil and Gas Companies issued by the London Stock Exchange in March 2006. Mr.Turner, with 40 years of mining engineering, management and consultingexperience, graduated as a mining engineer from the Camborne School of Mines,has a M.Sc. degree in Economic Geology from Leicester University and is a memberin good standing with the Institute of Materials, Minerals and Mining and a UKChartered Engineer. For further information, www.minco.ie or contact: Roger Turner: Executive Chairman & CEO +44 (0)20 7397 8155Terence McKillen: Director of Exploration & Business Development +1 (416) 362 6686Danesh Varma, CFO & Company Secretary +44 (0)20 7397 8154John Frain / Fergal Meegan: (NOMAD) Davy +353 (0)1 6796363Tom McCormack (Ireland PR) ConneXions +353 (0)1 230 3015 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
8th Jun 20129:00 amRNSXtierra Feasibility Update Bilbao
1st Jun 20124:29 pmRNSXtierra Drilling Update
16th May 201212:00 pmRNSFurther re Buchans
8th May 20122:29 pmRNSFurther information - Woodstock Manganese Property
1st May 201210:21 amRNSHolding(s) in Company
30th Apr 201212:00 pmRNSInvestment in Buchans Minerals Corporation
3rd Feb 20124:57 pmRNSXtierra Drilling Update
16th Jan 20123:08 pmRNSBoard Appointments
13th Jan 20124:55 pmRNSHolding(s) in Company
24th Nov 201112:15 pmRNSXtierra Drilling
7th Nov 20117:00 amRNSDirector Dealings
2nd Nov 20115:00 pmRNSAcquisition of Pallas Green project completed
28th Oct 20114:04 pmRNSCompletion of Disposal
24th Oct 20115:32 pmRNSResults of General Meetings
30th Sep 20117:01 amRNSPallas Green Document Availability
30th Sep 20117:00 amRNSInterim Results
9th Sep 20112:53 pmRNSXtierra Drilling
3rd Aug 20117:00 amRNSPallas Green Project Update
22nd Jul 20117:00 amRNSXtierra Drilling
20th Jul 20119:48 amRNSHolding(s) in Company
13th Jul 20117:00 amRNSAcquisition of remaining interest in Pallas Green
13th Jul 20117:00 amRNSProposed Sale of Pallas Green Project
4th Jul 20113:57 pmRNSDirector Resignation
30th Jun 20114:22 pmRNSAnnual Financial Report
28th Jun 20112:51 pmRNSXtierra Drilling Update
27th May 20117:00 amRNSXtierra Bilbao Update
4th Apr 20117:00 amRNSPlacing
28th Mar 20117:00 amRNSPallas Green Drill Results and Update
3rd Mar 20117:00 amRNSXtierra Financing
25th Feb 20117:00 amRNSOperational Update
24th Feb 201110:38 amRNSExercise of Warrants
31st Dec 201010:36 amRNSIssue of Equity
24th Dec 20109:42 amRNSXtierra Financing
22nd Nov 201010:01 amRNSHolding(s) in Company
11th Oct 20109:09 amRNSPallas Green Drilling Update
7th Oct 201010:38 amRNSHolding(s) in Company
6th Oct 20108:56 amRNSXtierra Update
30th Sep 20107:00 amRNSInterim Results
1st Sep 20107:00 amRNSPlacing
5th Aug 20108:14 amRNSPallas Green Resource Update
28th Jul 20107:00 amRNSDrilling Update
9th Jul 201010:52 amRNSXtierra Drilling
30th Jun 20109:13 amRNSNotice of AGM and Annual Report
9th Jun 20109:09 amRNSPallas Green Drilling Update
8th Jun 201010:43 amRNSHolding(s) in Company
13th May 20103:42 pmRNSXtierra Update
12th May 20108:25 amRNSPallas Green Drilling Update
6th May 20107:00 amRNSXtierra Bilbao Update
28th Apr 20108:27 amRNSPallas Green Drilling
16th Apr 20103:12 pmRNSXtierra Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.