focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLSRG.L Regulatory News (LSRG)

  • There is currently no data for LSRG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

LSR Group starts construction of 2 phase in ZILART

2 Mar 2018 09:13

RNS Number : 5134G
PJSC LSR Group
02 March 2018
 

LSR Group starts construction of the 2nd phase in ZILART

 

LSR Group has obtained permits for construction of the buildings #16 and #17 in its ZILART project. These are the first two buildings of ZILART's second phase, located between Arhcitect Melnikov and Arhcitect Shchusev streets, near the pedestrian boulevard and the park.

 

Building #16 is designed by Sergey Skuratov Architects bureau and consists of four sections of various heights (from 7 to 16 floors, up to 55 meters). The building comprises 551 apartments with a total area of 31.3 thousand sqm, as well as dual-level underground parking for 465 lots. The building will have facades clad with clinker brick and glass-fiber reinforced concrete.

 

Building #17 is designed by the architectural bureau Meganom and consists of four sections of various heights (from 6 to 16 floors). The building comprises 556 apartments with the total area of 31.7 thousand sqm, as well as dual-level parking for 460 lots. There is a wide choice of apartments ranging from 35.1 to 94.7 sqm and featuring various layouts with kitchen-dining room combos and cloakrooms. All apartments with more than two bedrooms have two toilet facilities. Most of the apartments feature panoramic windows. Fireplaces can be installed in the apartments on the top floor.

 

The courtyards will have children's playgrounds and recreation areas and will be car-free. The new buildings are located in the very heart of ZILART and, thus, far away from the busy streets. At the same time, both building will benefit from the proximity to the boulevard with its shopping malls and entertainment infrastructure. A children's theatre will be located straight across Architect Melnikov Street. And the nearest school is located just one block from building #17.

 

ZILART is a massive redevelopment project with a unified architectural concept. The 1.2 km long pedestrian boulevard named after Vesnin brothers will become the project's center of attraction with a concert hall, Hermitage-Moscow museum, theatres, shopping malls and a hotel. A landscaped park with the total area of 10 hectares will be completed very soon comprising a basketball court, tennis courts and a children's playground. A wide embankment will be constructed along the Moskva river. ZILART's social infrastructure will include 11 kindergartens for 1,440 kids, an educational complex for 2,500 students and a school for 875 students.

 

Three metro stations are located within walking distance from ZILART - Tulskaya, Avtozavodskaya and Tekhnopark, along with the station ZIL of the Moscow Central Circle (MCC). In 2018, it is planned to start construction of a motorway bridge to link the Third Ring with Varshavskoe highway.

 

For more information please contact:

LSR Group Press Service

+7 (812) 333-11-11

E-mail: press@lsrgroup.ru

www.lsrgroup.ru

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLIFLAVLIFIIT
Date   Source Headline
4th Apr 20187:43 amRNSLSR starts construction of two buildings in ZILART
28th Mar 20181:24 pmRNSLSR Group pays 6th coupon on 001P-01 bonds
27th Mar 201812:44 pmRNSLSR starts construction of new building in ZILART
27th Mar 20187:46 amRNSLSR Group sells reinforced concrete plant
15th Mar 20181:40 pmRNSLSR Group sells its pre-fab factory in Moscow
6th Mar 201812:29 pmRNSLSR Group reports 2017 financial results
5th Mar 20183:08 pmRNSLSR's real estate portfolio valued at RUB 185bn
5th Mar 20181:10 pmRNSDate and agenda of the Board of Directors
2nd Mar 20189:13 amRNSLSR Group starts construction of 2 phase in ZILART
19th Feb 20182:49 pmRNSDate and agenda of the Board of Directors
6th Feb 20187:00 amRNSLSR Group completes Kalinovsky project
2nd Feb 201812:40 pmRNSLSR Group launches new stages of Shuvalovsky
30th Jan 20182:13 pmRNSLSR launches new building in Tsvetnoy Boulevard
29th Jan 20187:19 amRNSLSR Group launches new phase in Michurinskiy
26th Jan 201811:40 amRNSLSR Group starts pre-sales in Voskhod project
24th Jan 20181:43 pmRNSLSR Group pays 3rd coupon on Series 001P-02 bonds
17th Jan 20181:37 pmRNSLSR Group completes Sofia project
17th Jan 20188:16 amRNSLSR Group launches new project in Yekaterinburg
16th Jan 20189:00 amRNSLSR Group reports 2017 operating results
28th Dec 20172:57 pmRNSLSR Group completes first phase of Novaya Okhta
28th Dec 20171:50 pmRNSLSR Group completes Yuzhnaya Akvatoriya project
27th Dec 201712:51 pmRNSLSR Group pays 5th coupon on Series 001P-01 bonds
27th Dec 20177:00 amRNSLSR Group completes 175 th sqm in Shuvalovsky
21st Dec 20179:53 amRNSLSR Group will buy-back shares
21st Dec 20177:30 amRNSLSR Group completes NEO project in St. Petersburg
20th Dec 20171:13 pmRNSLSR Group completes Verona project
19th Dec 20177:00 amRNSDate and agenda of the Board of Directors
18th Dec 20172:28 pmRNSLSR Group completes Tri Vetra project
18th Dec 20171:01 pmRNSLSR Group completes Europa City project
1st Dec 201712:40 pmRNSLSR Group launches new project in St. Petersburg
30th Nov 20171:51 pmRNSFitch confirms LSR Group's rating at "B"
17th Nov 20178:26 amRNSLSR launches riverfront apartments in Civilization
16th Nov 20171:20 pmRNSLSR Group completes 82 th sqm in St. Petersburg
14th Nov 20171:44 pmRNSLSR Group completes Cinema project
10th Nov 20172:43 pmRNSDate and agenda of the Board of Directors
8th Nov 20178:31 amRNSLSR Group completes Donskoy Olymp project
2nd Nov 20171:28 pmRNSLSR Group completes 65 th sqm in Novaya Okhta
30th Oct 20171:15 pmRNSLSR Group starts pre-sales of new hi-end project
25th Oct 20172:36 pmRNSLSR Group pays 2nd coupon on Series 001P-02 bonds
20th Oct 201712:59 pmRNSLSR Group pays 10th coupon on Series-04 bonds
17th Oct 201710:29 amRNSLSR Group reports 3Q 2017 operating results
3rd Oct 20173:06 pmRNSLSR completes placement of exchange-traded bonds
29th Sep 20175:18 pmRNSLSR announces coupon rate of exchange-traded bonds
29th Sep 20174:42 pmRNSExpiration of offer period for 001P-03 bonds
29th Sep 20177:29 amRNSCommencing date of 001P-03 bonds placement
29th Sep 20177:26 amRNSAmortization schedule of 001P-03 series bonds
27th Sep 20175:55 pmRNSLSR Group's bonds included into MICEX Level 1 list
27th Sep 20172:37 pmRNSLSR Group pays 4th coupon on Series 001P-01 bonds
26th Sep 20174:42 pmRNSDate and agenda of the Board of Directors
19th Sep 20179:23 amRNSLSR Group starts new project in St. Petersburg

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.