Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLonrho Regulatory News (LONR)

  • There is currently no data for LONR

Lonrho Mining Update

20 Feb 2009 10:38

RNS Number : 6508N
Lonrho PLC
20 February 2009
 



20 February 2009

LONRHO PLC

(the 'Company')

Lonrho Mining Update

Lonrho Plc (AIM: LONR), the conglomerate with a structured portfolio of African investments, is pleased to note that Lonrho Mining Ltd (formerly known as Nare Diamonds), which is owned 24.16% by Lonrho, has reinforced the Lulo kimberlite potential following positive microprobe results.

Set out below is the text of the announcement released by Lonrho Mining to the Australian Securities Exchange earlier today:

HIGHLIGHTS

Microprobe analysis of key indicator minerals from six aeromagnetic targets returns encouraging results.

93% of all pyrope garnets and 85% of picro-ilmenites classified as kimberlitic.

Results indicate high potential for diamond preservation, especially in kimberlite K72.

Heavy mineral geochemistry clearly identifies K71 and K72 kimberlites as priority targets for drilling and bulk sampling.

Strong basis to progress exploration and evaluation of the Lulo Diamond Project.

Further to its announcement of 23 January 2009, Lonrho Mining Limited (ASX: LOMis pleased to report further highly encouraging results from follow-up microprobe analysis of sampling results of the first six targets the Lulo Diamond Concession in north-eastern Angola.

The results indicate that 93% of the pyrope garnets and 85% of the picro-ilmenites recovered from the six target areas can be classified as kimberlitic, with the heavy mineral geochemistry clearly identifying the K71 and K72 kimberlites as the priority targets for drilling and bulk sampling. 

The microprobe analysis was undertaken as a follow up to the results announced last month from field-based inspection and surface sampling which confirmed the presence of high quantities of kimberlitic indicator minerals at all six targets. These represent a small proportion of the 217 magnetic targets so far identified within the Lulo Concession, which lies within the diamond-bearing Cacuilo / Lulo River catchment areas of north-east Angola.

Microprobe Analysis 

As previously outlined, Lonrho's exploration team completed detailed field inspection of the six priority aeromagnetic/satellite targets in December 2008. The target selection was based on the size of the magnetic footprint, the size of the satellite image feature and/or the surface disturbance pattern from garimpeiro workings. Based on empirical evidence, the larger targets were considered to be more prospective.

One 20kg to 40kg soil sample was collected from the centre point of each anomaly with this material screened to -2mm and concentrated in the field, using a gold pan. These concentrates were then dispatched to the MSA Group laboratory in Johannesburg for analysis.

Kimberlitic pyrope garnets and picro-ilmenites were recovered from all of the samples submitted. A selection of 150 pyrope garnets and 150 picro-ilmenites were then submitted for electron microprobe analyses. The results are summarized in Table 1 below:

TABLE 1

MICROPROBE ANALYSES

Anomaly

Pyrope Garnets (G9)

Picro Ilmenite

K71

18

20

K72

122

20

K50

0

10

L6

0

45

K14

0

8

K6

0

24

Note: Nine kimberlitic eclogitic garnets and one non-kimberlitic garnet were reported. The rest are classified kimberlite lherzolitic G9 pyrope garnets. Eight ilmenites are classified as para-kimberlitic and 15 are non-kimberlitic.

Of the 150 garnets probed, 140 grains (93%) show that they are kimberlitic and peridotitic in origin with mostly lherzolitic (G9) compositions. A small percentage has eclogitic compositions. Most of the grain colours are mauve and cerise with traces of orange. 

All of the six targets sampled produced kimberlitic picro-ilmenites, with 127 of the 150 grains (85%) classified as kimberlitic. The variability of the geochemical signatures presents an important clue as to the diamond content of the pipes based on the diamond preservation index which indicates how many diamonds survived the journey from the upper mantle (about 150 km deep) to the surface.  

A high percentage of the ilmenite grains fall within fields 3 and 4 of this index, suggesting that the potential for diamond preservation (especially within kimberlite 72) is high.

The Canguige Riverwhich drains both the K71 and K72 (and other) magnetic anomalies, has historically recorded alluvial diamonds with grades of 9cpht to 20cpht. This provides an important backdrop to the results received to date.

Forward Program

The six targets sampled represent just 2.8% of the total 217 magnetic anomalies which, based on the mineral geochemistry seen to date, are believed to be mainly due to underlying kimberlite bodies within the Lulo Diamond Concession. 

This limited soil sampling exercise has enabled the Company to successfully prioritise the six initial selected targets.

The marked geochemical signature variability is encouraging, as it will be possible, using cheap and rapid soil sampling techniques, for early selection of the most diamond prospective pipes within this province.

As outlined previously, the Company is planning to fast-track its 2009 exploration program, with drilling and bulk sampling initially targeting the kimberlite K72 and the adjacent probable kimberlite K71, with the remaining targets to be prioritized in the following order: L6, K50, K6 and K14.

The results received to date - viewed against the background of a known alluvial diamond province (the diamond-bearing Cacuilo River system) - provide the Company with further significant encouragement regarding the prospectivity of the Lulo Diamond Project.

The 2009 exploration program will be finalized following completion of the recently announced Entitlements Issue, which aims to raise up to $1.7 million to underpin diamond exploration activities in Angola in the year ahead. The closing date for acceptances under the Entitlements Issue is 12 March 2009.

Update - Lonrho Mining SA (Pty) Ltd (In Provisional Liquidation)

The proceedings for the liquidation of Lonrho Mining SA (Pty) Ltd (In Provisional Liquidation)referred to in the Company's announcement of 9 February 2009, have been adjourned to 13 March 2009.

It is anticipated that a final winding up order will be made on 13 March 2009, unless the proceedings are further adjourned or withdrawn, or an interested party can show cause why the final winding up order should not be granted. The assets of Lonrho Mining SA (Pty) Ltd (In Provisional Liquidationcurrently remain under the control of the Provisional Liquidator, and will be under the control of its Liquidator if a final winding up order is granted.

- ENDS -

Competent Persons Disclosure

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves has been prepared by Consulting Geologists Manfred Marx and Consulting Geophysicist, E.O. Kostlin. Messrs Marx and Kostlin are consultants to the Company and have sufficient experience with the relevant style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to be qualified as a Competent Person as defined in the 2004 Edition of the 'Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Each of Messrs Marx and Kostlin consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

LONRHO ENQUIRIES

Lonrho Plc

+44 (0)20 7016 5105

David Lenigas, Executive Chairman

+44 (0)7881 825 378

Geoffrey White, Chief Executive Officer

+44 (0)7717 307 308

Emma de Borchgrave, Executive Director

+44 (0)7867 785 177

 

 

Pelham PR

 

Charles Vivian

+44 (0) 20 7743 6672

 

+44 (0) 7977 297903

James MacFarlane

+44 (0) 20 7743 6375

 

+44 (0) 7841 672831

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCTMMMTMMJTBFL
Date   Source Headline
3rd Apr 20097:00 amRNSChange of Adviser
31st Mar 20094:40 pmRNSSecond Price Monitoring Extn
31st Mar 20094:35 pmRNSPrice Monitoring Extension
30th Mar 20096:17 pmRNSPreliminary Results
30th Mar 20095:36 pmRNSNotification of interest
24th Mar 20097:00 amRNSTrading Update
18th Mar 20095:20 pmRNSNotifications of Major Interests in Shares
6th Mar 20093:00 pmRNSReport and Accounts and Restoration of Trading
4th Mar 200912:15 pmRNSAdvisor resignation
2nd Mar 20094:40 pmRNSSecond Price Monitoring Extn
2nd Mar 20094:35 pmRNSPrice Monitoring Extension
26th Feb 20097:31 amRNSHolding(s) in Company
26th Feb 20097:31 amRNSNotifiable Interest
26th Feb 20097:30 amRNSSuspension of dealings in shares
20th Feb 200910:38 amRNSLonrho Mining Update
23rd Jan 20093:39 pmRNSHolding(s) in Company
23rd Jan 20099:14 amRNSLonrho Mining Update
21st Jan 20094:40 pmRNSSecond Price Monitoring Extn
21st Jan 20094:35 pmRNSPrice Monitoring Extension
15th Jan 20094:36 pmRNSPrice Monitoring Extension
14th Jan 20095:27 pmRNSEmployee Share Options
14th Jan 20092:05 pmRNSLonrho appointed John Deere
13th Jan 200912:54 pmRNSAcquisition
13th Jan 20097:00 amRNSLonrho Agriculture Update
8th Jan 20094:41 pmRNSSecond Price Monitoring Extn
8th Jan 20094:35 pmRNSPrice Monitoring Extension
7th Jan 20097:00 amRNSChange of Accounting Reference Date
5th Jan 200912:55 pmRNSNotification of Interest
31st Dec 20081:10 pmRNSTotal Voting Rights
19th Dec 200812:01 pmRNSLonrho Mining Quarterly Report
16th Dec 20085:15 pmRNSNotification of Interest
12th Dec 20089:01 amRNSe-Kwikbuild wins contract
11th Dec 200810:33 amRNSDirector's Dealing
10th Dec 200812:14 pmRNSNotification of Interest
9th Dec 20084:15 pmRNSResult of EGM
9th Dec 200812:22 pmRNSNotification of Interest
5th Dec 20084:37 pmRNSNotification of Interests
5th Dec 20083:13 pmRNSNotification of Interests
4th Dec 200812:34 pmRNSNotification of Interest
2nd Dec 20081:21 pmRNSNotification of Interest
2nd Dec 20087:00 amRNSExercises FMN Option
1st Dec 20083:23 pmRNSAppointment of New Finance Director
28th Nov 200812:13 pmRNSNotification of Interests
18th Nov 20087:00 amRNSe-Kwikbuild Opens New Factory To Meet Demand
13th Nov 20085:45 pmRNSNotice of EGM
11th Nov 200811:36 amRNSPrivate Placement
10th Nov 200812:02 pmRNSNotification of Interests
10th Nov 200812:01 pmRNSNotification of Interests
3rd Nov 20086:11 pmRNSNotification of Interests
29th Oct 20084:43 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.