focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.95
Bid: 2.80
Ask: 3.10
Change: 0.175 (6.31%)
Spread: 0.30 (10.714%)
Open: 2.775
High: 3.05
Low: 2.75
Prev. Close: 2.775
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

29 Mar 2021 07:00

RNS Number : 7231T
Landore Resources Limited
29 March 2021
 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014

 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

 DRILLING UPDATE

BAM GOLD PROJECT

JUNIOR LAKE PROPERTY

 

London, United Kingdom - 29th March 2021 - Landore Resources Limited (AIM: LND) ("Landore Resources" or "the Company") is pleased to provide an update on the progress of the drilling programme for 2020-21 (the "Drilling Programme") on the BAM Gold Deposit, Junior Lake Property, Ontario, Canada ("BAM Gold Deposit").

 

· The planned 23,000 metres Drilling Programme continues with 14,970 metres completed to date. Results received have confirmed the depth and length extensions of the BAM west pit reporting widths and grades consistent with the defined resource. Results are pending for the depth drilling below the east pit.

 

· Step out drilling to the east and west of the BAM Gold Deposit has targeted the highly anomalous gold trends established by the recently completed soil-till sampling program (reported 14th January 2021). Results received to date on the Western step out drilling are highly encouraging. Results are pending for most of the extension drilling.

 

2020-2021 Drilling Programme

The Drilling Programme is progressing as planned with a total of 14,970 metres of HQ diamond core drilling, comprising 65 drill holes (0420-725 to 0421-789), completed to date.

Drilling below the west pit has confirmed the continuation of the widths and grade of the mineralisation at depth and also for a further 250 metres to the west along strike.

Assay results for 27 drill holes are pending and will be reported when received and collated.

 

Results not previously reported include:

 

Easting

Northing

Drill-hole

From

Interval*

Au

 

 

No

Metres

Metres

g/t

800E

400N

0421-757

164.50

1.04

3.71

 

 

and

188.50

1.00

8.14

950E

350N

0420-755

118.15

5.30

1.13

 

 

and

256.80

4.20

1.69

1000E

295N

0420-752

235.15

3.07

4.02

 

 

and

247.08

10.61

1.19

1550E

360N

0420-743

34.35

8.25

0.89

 

 

and

55.22

0.98

6.04

1700E

350N

0420-744

36.73

5.15

0.74

1800E

260N

0420-747

131.41

3.71

1.88

1900E

100N

0420-740

239.00

12.83

0.85

 

* The above drill holes were drilled north at 45-52 degrees into a lithological package dipping approximately 85-75 degrees to the south. The actual true thickness of mineralisation is estimated to represent between 70-80% of the intervals shown in the above table.

 

The Drilling Programme consisting of a total of 23,000 metres of HQ diamond core drilling, commenced on October 15th, 2020, was designed to further infill and extend the defined BAM Gold Deposit resource of 1,015,000 ounces.

 

a) Resource drilling - West: 3,745 metres have been completed through 16 drill holes located beneath the west defined pit from 1000E to 2000 E, to test for depth extension. All holes intersected typical BAM Gold lithology and mineralisation, including some with visible gold. Results received show widths and grades as previously seen for the west pit.

 

b) Resource drilling - East: 3,465 metres have been completed to date through 13 drill holes located beneath the east defined pit, 2,000E to 3,000E to test for depth extension. All holes intersected typical BAM Gold Deposit lithology and mineralisation. Assay Results are pending.

 

c) Exploration drilling - East: 3,687 metres have been completed to date through 18 drill holes to test the potential strike extension of the existing BAM Gold Deposit for 1.2 kilometres further to the east from 3,000E to 4,100E. Drill holes have intersected typical BAM Gold Deposit lithology. Assay results are pending.

 

d) Exploration drilling - West: 4,342 metres have been completed to date through 18 exploration drill holes to test the potential strike extension of the existing BAM Gold Deposit for 1.2 kilometres to the west from 1000E to 200W. All holes have intersected typical BAM Gold Deposit lithology with results received to date showing mineralisation gently plunging to the west from the current west pit design. Assay results for the remaining holes are pending.

 

BAM Gold Deposit Geology and Mineralisation:

Interpretive work and conceptual modelling conducted by Landore's senior geological consultant and independent engineers has indicated the gold mineralization resides within a series of tabular shaped zones oriented in a roughly en-echelon configuration, generally parallel to the overall strike of the host rock units (east-southeast direction).

 

Shoots (Mullions) of significant gold mineralization within the BAM Gold Deposit's east pit and west pit zones are interpreted to dip approximately 30º to the west. Preliminary interpretation of drilling results has indicated the potential for repeating shoots of significant gold mineralization along strike east and west of the defined BAM Gold Deposit resource.

 

Results from the 2019/2020 soil-till sampling programs conducted west along strike for approximately 7 kilometres and east for approximately 2 kilometres from the BAM Gold Deposit further support the potential for significant gold mineralization in these areas. Soil-till sampling has established the presence of widespread anomalous gold and multiple gold trends, confirming the potential of this area to contain extensions of the BAM Gold Deposit.

 

Exploration drilling currently in progress will follow up on these encouraging results to confirm the presence of repeating gold-bearing shoots along strike east and west of the defined BAM Gold Deposit.

 

Planning:

At the conclusion of the 2020-2021 drilling programme the Company is planning to commission an updated Mineral Resource Estimate ("MRE") and Preliminary Economic Assessment ("PEA") on the BAM Gold Deposit.

 

BAM GOLD DEPOSIT:

The BAM Gold Deposit is located approximately mid-way along a highly prospective Archean greenstone belt which traverses the Junior Lake Property from east to west for approximately 31 kilometres. The favorable greenstone belt ranges from 0.5 to 1.5 kilometres wide and hosts multiple known gold occurrences including the Lamaune Gold Prospect.

 

Mineral Resource Estimate:

The Mineral Resource Estimate for the BAM Gold Deposit notified on 7th January 2020 reported 31,083,000 tonnes (t) at 1.02 grams/tonne (g/t) for 1,015,000 ounces of gold including 21,930,000t at 1.06g/t for 747,000 ounces gold in the Indicated category.

BAM Gold Resource and PEA:  

A Technical Report and Preliminary Economic Assessment of the BAM Gold Project was released on 20th February 2019 in compliance with the requirements of the Canadian National Instruments 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").

 

The Junior Lake Property:

The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2% owned) (jointly the "Junior Lake Property"), consisting of 30,507 hectares, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to: The BAM Gold Deposit; the B4-7 Nickel-copper-cobalt-Platinum-Palladium-gold Deposit; the VW Nickel-Copper-cobalt Deposit; Lamaune Gold Prospect and numerous other precious and base metal occurrences.

 

Covid-19

The Company is following Government Covid-19 guidelines in its operations in Canada.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an

Exploration office located in Thunder Bay, Ontario, Canada.

 

For more information, please contact:

Landore Resources Limited

 

Bill Humphries, Chief Executive Officer

Tel: 07734 681262

Glenn Featherby, Finance Director

Tel: 07730 420318

 

 

Cenkos Securities (Nominated Advisor and Broker)

 

Derrick Lee / Peter Lynch

Tel: 0131 220 9100

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBCGDXSBDDGBI
Date   Source Headline
15th Sep 20147:00 amRNSDrilling Results
19th Aug 20147:00 amRNSDrilling Update
22nd Jul 20147:00 amRNSGrant of Options
17th Jul 201412:00 pmRNSHolding(s) in Company
7th Jul 20147:00 amRNSOversubscribed Placing and Subscription
2nd Jul 20143:33 pmRNSResult of AGM
28th May 20143:53 pmRNSChange of Broker
20th May 201412:18 pmRNSPosting of Annual Report
15th May 20147:00 amRNSFinal Results
15th May 20147:00 amRNSAmendment to Loan Agreement with Lamaune Iron Inc.
23rd Apr 20147:00 amRNSJunior Lake Nickel-Copper Project Update
24th Mar 20147:00 amRNSProgress Update
18th Feb 20147:00 amRNS3D Geophysics Survey Complete
4th Feb 20147:00 amRNSCommencement of 3D Survey
13th Jan 20147:00 amRNSJunior Lake Geophysics Survey
25th Nov 20134:30 pmRNSGrant of Options
25th Oct 201311:19 amRNSHolding(s) in Company
15th Oct 20137:00 amRNSSubscription
30th Sep 20137:00 amRNSUpdate - Junior Lake Nickel-Copper Property
19th Sep 20137:00 amRNSHalf Yearly Report
1st Jul 201311:22 amRNSGrant of Options
20th Jun 201311:30 amRNSResult of AGM
14th May 20137:00 amRNSFinal Results
8th May 20137:00 amRNSChange of Adviser
8th Apr 20137:00 amRNSDrilling Update - Junior Lake Nickel Project
11th Mar 20137:00 amRNSSubscription
17th Jan 20137:00 amRNSResource Update - Junior Lake
12th Dec 20127:00 amRNSDrilling and Geophysical Survey Update
16th Oct 20127:00 amRNSDrilling, Geophysics Survey - Junior Lake
26th Sep 20122:45 pmRNSGrant of Options
20th Sep 201211:04 amRNSTotal Voting Rights
19th Sep 201210:14 amRNSAppointment of Broker
12th Sep 20127:00 amRNSSubscription
3rd Sep 20127:00 amRNSDrilling Update - Junior Lake Project
21st Aug 20127:00 amRNSHalf Yearly Report
25th Jul 20127:00 amRNSDrilling Report
12th Jul 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
20th Jun 20123:11 pmRNSResult of AGM
20th Jun 20127:00 amRNSHolding(s) in Company
29th May 201211:26 amRNSFinal Results
22nd May 20127:00 amRNSDrilling Report
18th Apr 20127:00 amRNSDrilling Update - Junior Lake Nickel Project
21st Mar 20124:37 pmRNSGrant of options
13th Mar 201211:15 amRNSHolding(s) in Company
28th Feb 20127:00 amRNSAdditional Listing
21st Feb 201210:42 amRNSSubscription
23rd Jan 20127:01 amRNSDrilling Update - Junior Lake
3rd Nov 201111:36 amRNSDirector Declaration
2nd Sep 20117:00 amRNSInterim Statement
10th Aug 20117:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.