The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLAM.L Regulatory News (LAM)

  • There is currently no data for LAM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Contract signed for Moray West Offshore Wind Farm

8 Sep 2022 07:00

RNS Number : 7393Y
Lamprell plc
08 September 2022
 

 

8 September 2022

 

 

LAMPRELL PLC("Lamprell" and with its subsidiaries the "Group")

 

CONTRACT SIGNED FOR MORAY WEST OFFSHORE WIND FARM

 

Further to the announcement for the reservation agreement issued on 22 March 2022, Lamprell is pleased to confirm that it has signed the very large contract* and received a full notice to proceed from Moray Offshore Windfarm (West) Limited. The base scope of work includes the construction of 60 wind turbine generator transition pieces and two transition pieces for Moray West's two offshore substations, as well as for the shipping of the transition pieces to a marshalling harbour in the UK. To complete these works, the Group will make use of a state-of-the-art renewables production line, which is currently under construction and through which we will be able to construct jacket components, transition pieces and monopiles** for this and future renewables projects.

 

*Lamprell has reviewed its definition of contract values as a result of recent changes in its bid pipeline. The new ranges are listed below:

Small contract: value below USD 50 million

Medium-sized contract: between USD 50 million and up to USD 100 million

Large contract: over USD 100 million and up to USD 200 million

Very large contract: over USD 200 million

 

** Transition pieces

The transition piece of a fixed offshore wind turbine is a reinforced part of the support structure that is connected to the wind turbine tower. These structural elements present unique features and are critical components of offshore wind turbines, contributing to the structural soundness and reliability of offshore wind turbines.

 

Monopile/transition pieces

Monopiles are a simple steel pile made by steel tubes and cones which sit beneath the turbine tower, typically through a transition piece. The monopile is inserted between 10 and 20 metres into the seabed depending on the stability of the seabed, extending the turbine tower under water and into the seabed.

Transition pieces form, together with the monopiles, the foundation of the turbines. The transition piece includes various functionalities such as access for maintenance, cable connections for the energy produced by the turbine and the corrosion protection for the foundation. The transition piece is fixed on the foundation structure, whether monopile or jacket, and consists of thick walled tubes constructed from rolled plates of an offshore steel quality.

 

- Ends -

 

 

Enquiries:

 

Lamprell plc

 

Maria Babkina, Investor Relations

+44 (0) 7852 618 046

 

 

 

Tulchan Communications, London

+44 (0) 207 353 4200

Martin Robinson

Martin Pengelley

 

Notes to editors

Lamprell is a leading provider of services to the international energy sector. Driving strategy and growth through its Renewables, Oil & Gas and Digital business units, underpinned by almost half a century of expertise, the Group has worked hard to establish its reputation for delivering projects safely, on time and to budget.

The Group has firmly established its international credentials in the renewables sector as well as continuing to build on its traditional oil and gas credentials. We are recognised for building complex offshore and onshore process modules and platforms, fabricating and refurbishing jack-up rigs and liftboats.

Lamprell employs more than 5,000 people across multiple facilities, with its primary facilities located in Hamriyah, in the UAE. Combined, the Group's facilities cover approximately 800,000m2 with over 1.5 km of quayside. In addition, the Group has facilities in Saudi Arabia (through a joint venture agreement). Lamprell is listed on the London Stock Exchange (symbol "LAM")."

 

Moray West offshore wind farm

Moray West is a new offshore windfarm, which will be comprised of 60 turbines in the outer Moray Firth. Once constructed, the project will provide a secure, reliable source of energy for the equivalent of up to 640,000 homes. The project is aiming to be fully operational in 2024/25. Moray West is being developed by Ocean Winds, a 50-50 joint venture between EDP Renewables (EDPR) and ENGIE.

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
CNTUWASRUKUKRRR
Date   Source Headline
19th Nov 20127:00 amRNSInterim Management Statement
12th Nov 20123:27 pmRNSInterim CFO appointment
6th Nov 20128:53 amRNSHolding(s) in Company
4th Oct 20122:40 pmRNSBoard Changes
3rd Oct 20127:00 amRNSTrading Update
6th Sep 20127:00 amRNSSaudi Arabia Joint Venture
28th Aug 20127:00 amRNSHalf Yearly Report
24th Aug 20127:00 amRNSCOMPLETION OF JACKUP RIG
9th Aug 20122:32 pmRNSHolding(s) in Company
31st Jul 20124:15 pmRNSHolding(s) in Company
30th Jul 20127:00 amRNSNotice of Results
26th Jul 20127:00 amRNSTrading Update
17th Jul 20127:15 amRNSContract Award
20th Jun 201210:50 amRNSHolding(s) in Company
15th Jun 201212:12 pmRNSHolding(s) in Company
15th Jun 20127:00 amRNSDirectorate Changes
15th Jun 20127:00 amRNSDelivery of Hull 108
11th Jun 20124:52 pmRNSTR-1:NOTIFICATIONS OF MAJOR INTERESTS IN SHARES
7th Jun 20124:35 pmRNSTrading Update
7th Jun 20124:35 pmRNSBoard Change
7th Jun 201212:02 pmRNSResult of AGM
28th May 20127:00 amRNSHolding(s) in Company
23rd May 201210:15 amRNSAnnual Information Update
23rd May 20127:00 amRNSDirector/PDMR Shareholding
18th May 20127:00 amRNSHolding(s) in Company
16th May 20127:00 amRNSTrading Update
3rd May 20123:30 pmRNSDirector/PDMR Shareholding
2nd May 20129:30 amRNSDirector/PDMR Shareholding
1st May 20127:00 amRNSContract Award
26th Apr 20127:00 amRNSNotice of AGM
25th Apr 201210:30 amRNSDirector/PDMR Shareholding
25th Apr 20127:00 amRNSEXERCISE OF CONTRACT OPTIONS
19th Apr 201210:00 amRNSDirector/PDMR Shareholding
17th Apr 20127:00 amRNSDirector/PDMR Shareholding
26th Mar 20127:00 amRNSFinal Results
13th Mar 20128:58 amRNSHolding(s) in Company
12th Mar 20127:00 amRNSAppointment of NED
13th Feb 20128:00 amRNSContract Award and Update
6th Feb 20127:00 amRNSNotice of Results
28th Dec 201112:45 pmRNSContract Award
8th Dec 20119:05 amRNSDirector/PDMR Shareholding
17th Nov 20117:00 amRNSInterim Management Statement
8th Nov 20118:15 amRNSContract Award
1st Nov 20117:00 amRNSContract Award
1st Nov 20117:00 amRNSSite Visit
31st Oct 20117:00 amRNSDirectorate Change
18th Oct 20117:00 amRNSExercise of Options
5th Sep 201112:51 pmRNSDirector/PDMR Shareholding
1st Sep 20117:00 amRNSTotal Voting Rights
30th Aug 20117:00 amRNSHalf Yearly Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.