Corporate and Operational Update

14 Feb 2020 13:20

RNS Number : 0980D
Kropz PLC
14 February 2020
 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

14 February 2020

Kropz Plc

("Kropz" or the "Company")

 

Corporate and Operational Update

 

 

Kropz Plc (AIM: KRPZ), an emerging African phosphate explorer and developer, announces a corporate and operations update for its Elandsfontein, Hinda and Aflao projects.

 

Elandsfontein update

 

Following the announcements of 5 June 2019 and 12 September 2019, the Company has confirmed that the latest metallurgical test work on the Elandsfontein phosphate mine (the "Project") completed by Eriez, Pennsylvania and JESA, Florida (the "Test Work"), has identified and confirmed a robust processing alternative to the previous flotation circuit.

 

The Test Work has consistently demonstrated that the Elandsfontein phosphate mine processing plant (the "Plant") will produce a final saleable concentrate to expected specification of 68% BPL (approximately 31% P2O5) using a flotation configuration of direct followed by reverse, flotation circuit. This type of circuit has been successfully employed throughout the industry for decades.

 

Supplementary design work has been completed to advance the front-end engineering, and has identified that additional equipment, infrastructure and modifications to the original plant are needed to cater for the requisite process modifications. The capital costs have been estimated to AACE Class 3 level, by external consultants, and negotiations on an engineering, procurement and construction contract are well advanced.

 

The further time required for the Test Work together with newly identified long-lead items and associated structural works will impact timing and capital costs to first production. Accordingly, the target date for commercial production at Elandsfontein is now Q4 2021, with a total estimated funding requirement of US$40 million, excluding the US$14 million already held by Kropz Elandsfontein (Pty) Ltd ("Kropz Elandsfontein") and including working capital, debt repayments and capital expenditure.

 

Further detail on the definitive technical solution for Elandsfontein is included in the appendix to this announcement.

 

Corporate update

 

The Company's subsidiary Kropz Elandsfontein has a project finance facility with BNP Paribas S.A. ("BNPP") for US$30 million which is currently fully drawn. Kropz Elandsfontein had agreed with BNPP that, in light of the delays in the commissioning of the Project, Kropz Elandsfontein would provide BNPP with positive Test Work results, a schedule and budget to completion for the Project, together with a comprehensive funding proposal to Project completion. Kropz Elandsfontein was able to satisfy all of BNPP's information requests by the agreed date, other than the funding proposal to Project completion. Consequently, the Company advises that Kropz Elandsfontein is in technical default of the BNPP facility, though the Company and Kropz Elandsfontein remain in ongoing constructive dialogue with BNPP to remedy the breach.

 

Kropz Elandsfontein's capital repayment obligations under the BNPP facility are due to commence on 31 March 2020 and this, together with the BNPP security over US$14 million currently held on account in South Africa, will require re-negotiation as part of these discussions due to the delay in the Project timetable. BNPP has reserved its right to accelerate the loan, but to date has not done so, and continues to work constructively with the Company to find a solution that is satisfactory to all parties.

 

Kropz Elandsfontein is currently in advanced discussions on a comprehensive funding solution to bring Kropz Elandsfontein into full production. The Company's major shareholder, ARC Fund, has received preliminary Investment Committee approval to support the Group's further funding requirements, subject to reaching agreement with BNPP. The Company will provide a further update to the market in due course.

 

Hinda and Aflao projects

 

Kropz has recently completed a competitive tender for an updated feasibility study for its currently 100% owned Hinda project in the Republic of Congo (which is expected to be diluted to 90 % through the participation of the Republic of Congo), aligned with the capacity of the existing road and port facilities. The tender award and associated work programme for Hinda are subject to securing additional funding. The Company will provide a further update to the market in due course.

 

Having completed the MMI and radiometric surveys at its Aflao project in Ghana, and with a view to focusing all of its efforts on the key Elandsfontein and Hinda assets, the Board has decided to divest its interests in Aflao and is currently in consultation with the project's other shareholders.

 

For further information visit www.kropz.com or contact:

Kropz Plc

 

Ian Harebottle (CEO)

+44 (0) 1892 516 232

 

 

Grant Thornton UK LLP

Nominated Adviser

Richard Tonthat

Samantha Harrison

Niall McDonald

+44 (0) 20 7383 5100

 

 

Hannam & Partners

Joint Broker

Andrew Chubb

Ernest Bell

 +44 (0)20 7907 8500

 

Mirabaud Securities Ltd

Joint Broker

Rory Scott

Edward Haig-Thomas

+44 (0)20 3167 7220

+44 (0)20 3167 7222

 

 

Tavistock

Financial PR & IR (UK)

Emily Moss

Jos Simson

Oliver Lamb

+44 (0) 207 920 3150

kropz@tavistock.co.uk

 

Russell & Associates

PR (South Africa)

James Duncan

+27 (0)11 880 3924

james@rasc.co.za 

 

About Kropz Plc

Kropz is an emerging African phosphate explorer and developer, with an advanced stage phosphate mining project in South Africa, a phosphate project in the Republic of Congo and an exploration asset in Ghana. The vision of the Group is to become a leading independent phosphate rock producer and to develop into an integrated, mine-to-market plant nutrient company focusing on sub-Saharan Africa.

Kropz's Elandsfontein Phosphate Project is a near-term producing asset in South Africa's Western Cape Province, close to export infrastructure and primed to take advantage of a recovery in phosphate prices.

The Company's medium-term development asset is the Hinda Phosphate Project in the RoC.

The Company has also secured a prospecting right in Ghana, to undertake further exploration work on the Aflao Project, the potential extension of the well-known, high grade and historically exploited phosphate deposit in Togo.

 

Appendix - Summary of Definitive Technical Solution for the Elandsfontein Project

Metallurgical test work results

 

A direct reverse ("DR") test campaign on approximately 1.35 tonnes of material, prepared at Mintek, South Africa, was sent to Eriez in Q4 2019. The bulk composite samples were recovered from within the current mining excavation and consisted of a ratio of 40:60 F1:F2 ore, representative of the early mining schedule. Test work has been conducted on bench scale and pilot scale, on both the coarse and fine flotation fractions.

Another bulk sample, prepared in a ratio of 50:50 F1:F2 ore (and therefore lower in grade), is being tested at the JESA laboratory in Florida, USA, on the DR configuration. The JESA laboratory is supported by individuals with extensive Florida phosphate experience, where the DR circuit is used for the recovery of phosphate. JESA has prepared an additional 2.5 tonne sample, which is being tested at Eriez, USA, on a continuous pilot scale.

JESA has also run a series of 'locked cycle tests' to confirm the impact of water recycle and ensure optimisation of the water circuit. Variability samples, representing later years of mining, have also been tested in South Africa.

In summary, results show that:

a. The slimes losses remain unchanged, at up to 10% by mass;

b. The flotation circuit is robust at a range of feed grades;

c. Target concentrate grade can be achieved even at low feed grades (c.5% P2O5); and

d. The average stage-wise recovery expected is shown below:

 

Fine Flotation

Stage Recovery %P2O5

Concentrate Grade %P2O5

Direct

90.6

20.1

Reverse

80.3

31.2

Coarse Flotation

Stage Recovery % P2O5

Concentrate Grade %P2O5

Direct

93.9

20.9

Reverse

87.6

31.8

 

Design

 

The milling and classification circuit has remained unchanged since the design of the reverse-reverse circuit. The milling efficiency will be improved by replacing existing cyclones with fine aperture screens; slimes will be removed from the circuit using existing desliming cyclones; and the flotation feed to the coarse and fine circuits will be achieved using existing cross flow separators, following the new attritioning stage.

Fine flotation will target the 212x20um fraction. All fine flotation will be done in existing column flotation cells, with two stages of direct flotation, followed by two stages of reverse flotation.

Course flotation will target the 425x212um fraction. Direct coarse flotation will be achieved using the Hydrofloat technology, and reverse coarse flotation will be realised using conventional mechanical flotation cells. The coarse flotation section is new. The use of Hydrofloat, followed by mechanical cells is commonly used in Florida.

Both coarse and fine flotation feed will be conditioned in a new set of conditioners. Direct flotation concentrate will be de-oiled and conditioned ahead of the reverse amine flotation.

The water circuits have received particular attention, and the new circuit will effectively contain four dedicated water circuits to service each section of the plant. A number of internal water treatment facilities have also been included to ensure the integrity of the water circuit throughout the life of mine.

The design of the circuit modifications, including equipment selection, conditioning residence times and water circuits have all been interrogated by a number of phosphate consultants with extensive Florida and DR flotation experience engaged by Kropz Elandsfontein.

 

Capital costing and schedule

 

The capital cost has been estimated to an AACE Class 3 level of accuracy, with a total contingency of 16%. The process design has been used to model the required modifications for the process optimisation and to generate general arrangement drawings for material quantity take offs. The civil and structural scope of works have been issued to the market and are based on market rates. The electrical and instrumentation scope has been escalated from previous project rates, using relevant indices. All major mechanical equipment is based on prices tendered in 2019. The base date for the current capital cost estimate is January 2020.

The capital cost has been interrogated by external quantity surveyors.

The schedule is aligned to the delivery times of long lead items. The overall period between commencing workstreams and first production is largely unchanged from the schedule as previously defined.

Key milestone dates for the project, subject to funding arrangements, are:

§ Scope freeze: End February 2020*

§ Site establishment: July 2020

§ Commissioning commencement: August 2021

§ First ore through plant: September 2021

§ Production ramp up: over a period of six months from first ore date

* Drives the subsequent timetable.

The cost to completion caters for Plant capital cost, working capital and senior lender interest payments.

 

END

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDUSAORRWUUAAR
Date   Source Headline
29th May 20267:00 amRNSTotal Voting Rights
11th May 202610:27 amRNSDrawdown on Bridge Loan Facilities
30th Apr 202612:42 pmRNSECA Approval and Admission Date of Shares
20th Apr 20268:44 amRNSOperational Update
9th Mar 202611:49 amRNSDrawdown on Bridge Loan Facilities
25th Feb 20267:00 amRNSResults of WRAP Offer and Update on Subscription
20th Feb 20264:31 pmRNSWRAP Retail Offer for up to £91,077
20th Feb 20264:30 pmRNSFundraising, Amendment to Loan Terms & Update
26th Jan 202612:56 pmRNSDrawdown on Bridge Loan Facilities
18th Dec 20257:00 amRNSUnaudited Results for Six Months end 30 Sept 2025
17th Dec 20257:00 amRNSLegal Claim Update
9th Dec 20251:08 pmRNSDrawdown on Bridge Loan Facilities
8th Dec 20257:00 amRNSLoan Facility and Related Party Transaction
24th Nov 20257:00 amRNSTrading Update
6th Nov 20251:31 pmRNSResults of General Meeting
31st Oct 20252:41 pmRNSDrawdown on Bridge Loan Facilities
30th Sep 20255:08 pmRNSNotice of GM
29th Sep 20251:49 pmRNSResult of AGM
26th Sep 20254:16 pmRNSFinal Audited Results
4th Sep 20251:08 pmRNSNotice of AGM
27th Aug 202510:10 amRNSDrawdown on Bridge Loan Facilities
13th Aug 202511:21 amRNSDrawdown on Bridge Loan Facilities
30th Jul 20254:31 pmRNSDirector Disclosure Update
22nd Jul 20253:02 pmRNSLegal Claim Update
16th Jul 20251:08 pmRNSDrawdown on Bridge Loan Facilities
14th Jul 20255:04 pmRNSTrading Update and Loan Facility
30th May 20251:24 pmRNSDrawdown on Bridge Loan Facilities
28th May 20253:59 pmRNSFormal Execution of Loan Facility
21st May 20254:55 pmRNSTrading Update and Loan Facility
19th Mar 20257:23 amRNSNotice of Motion application by WWF SA
26th Feb 20257:00 amRNSTrading Update and Notification of Legal Claim
19th Dec 20247:00 amRNSUnaudited Results for Six Months end 30 Sept 2024
6th Nov 20242:00 pmRNSPassing of Lord Renwick of Clifton
4th Nov 20242:08 pmRNSResults of General Meeting
31st Oct 20247:00 amRNSTotal Voting Rights
17th Oct 20247:00 amRNSAdmission of Shares and Total Voting Rights
10th Oct 20244:30 pmRNSReceipt of Exchange Control Approval
30th Sep 20246:03 pmRNSFinal Audited Results
27th Sep 20241:05 pmRNSResult of AGM
20th Sep 202412:57 pmRNSResults of General Meeting
10th Sep 20247:00 amRNSResult of REX Retail Offer, Update on Subscription
3rd Sep 20247:01 amRNSRetail offer to raise up to £1.8 million
3rd Sep 20247:00 amRNSRestructuring, Fundraising, Notice of GM
27th Aug 20247:00 amRNSDrawdown on Bridge Loan Facilities
11th Jul 20247:00 amRNSTrading Update and further loan facility
20th Jun 20247:52 amRNSUpdate Mineral Resource Estimate - Elandsfontein
10th Jun 202411:05 amRNSStatement regarding share price movement
3rd Apr 20244:22 pmRNSDrawdown on Bridge Loan and BNP Loan Update
28th Mar 202412:11 pmRNSDrawdown on Bridge Loan Facilities
28th Mar 20248:22 amRNSUnaudited Results for 12 Months ended 31 Dec 2023

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.