Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKavango Resources Regulatory News (KAV)

Ben Turney, CEO, Kavango Resources will be presenting and taking live Q&A at focusIR Investor Webinar on 14th May. Please register here.

Share Price Information for Kavango Resources (KAV)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.225
Bid: 1.15
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.15 (13.043%)
Open: 1.225
High: 1.225
Low: 1.225
Prev. Close: 1.225
KAV Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Ditau Project update - drill targets identified

2 Jul 2021 07:00

RNS Number : 9353D
Kavango Resources PLC
02 July 2021
 

PRESS RELEASE

 

2 July 2021

KAVANGO RESOURCES PLC

("Kavango" or "the Company")

 

Ditau Project update - drill targets identified

 

Kavango Resources plc (LSE:KAV), the exploration company targeting the discovery of world-class mineral deposits in Botswana, is pleased to announce an update on the Company's Ditau Project ("Ditau"), searching for Rare Earth Elements ("REEs").

Ditau is held in a 50/50 Joint Venture with Power Metal Resources plc (LSE:POW) ("Power Metal"). Kavango is the operator.

Highlights

Ø Geophysical and geochemical surveys completed on 12 targets areas

Ø 7 specific drill targets identified

- Each target includes a possible carbonatite intrusive body lying within range of reverse circulation ("RC") drilling

- All targets within 300m depth

- 3 of the 7 targets classified as "high priority"

Ø Target I1 is a large, intense magnetic dipole

- Spans 17km by 8km

- Shallow depth to source of less than 100m

- Kavango believes I1 sits just under the Kalahari sands

- Lies at an intersection of two major regional fault zones

- Anomalous niobium values identified. Niobium is used in various superconducting materials and industrial alloys

Ø Target I4

- Spans 7.5km by 5km

- Shallow depth to source of less than 100m

Ø Target I10

- Spans 2.5km by 2.8km

- High AMT resistivity, coincidental with a gravity high

Ø Data processing and interpretation in progress for final drill readiness

Ø Environmental Management Plan in place

 

Ben Turney, Chief Executive Officer of Kavango Resources, commented:

"While our primary focus has been on developing our interests in the KSZ and KCB, we have been much encouraged by the number of drillable intrusive targets identified at Ditau. Most of these appear to be post Karoo in age and lying at a shallow depth beneath Kalahari sand cover.

It is particularly encouraging to have identified seven drill-ready targets, with three of those being classified as high priority. Carbonatite hosted deposits of Rare Earth Elements (REEs) hold significant strategic and commercial value. Kavango's targets are relatively shallow, which should make it straightforward to determine this project's potential

We look forward to revisiting Ditau later this year, once we've completed our other high-impact drill campaigns."

Exploration at Ditau

Kavango has identified 12 ring structures within the two prospecting licences making up the Ditau Project.

Falconbridge Explorations Ltd identified a similar large ring structure (KW2), located 23km to the north of Ditau, in the 1970s. On drilling KW2, anomalous values of niobium were detected in carbonatite rock (REEs were not assayed for at the time). Niobium is used in various superconducting materials and industrial alloys.

KW2 is thought to be part of a "cluster" of post-Karoo, carbonatites in the Kang area, of which Ditau is a part.

There is increasing evidence that at least some of the ring structures at Ditau contain carbonatite. An integrated exploration programme of surveys is being undertaken over the 12 ring structures (targets).

Each target is undergoing the following assessments/surveys:

SOIL GEOCHEMISTRY: 3 lines of soil geochemical sampling with specific attention to values of Niobium and REEs

CSAMT & AMT SURVEYING: To "map" the lithological contacts to determine conductivity and resistivity. The CSAMT survey was carried out using Geometrics' Stratagem EH4 unit, which measures ground electromagnetic signals and calculates ground resistivity down to depths of 1km.

Most targets were surveyed using the low-frequency version of the Stratagem without a transmitter (AMT), which sees down to 1.6km. Readings were taken at 50m station intervals along a profile.

GROUND MAGNETIC SURVEYING: The Earth is like a giant magnet due to ferromagnesian minerals in its core. Locally, various rocks have different magnetic properties due to variable magnetic mineral content. Carbonatites usually produce magnetic "high" anomalies compared to their host rocks.

The G856AX proton precession magnetometer was used in the ground magnetic surveys. One G-856AX was used as a "base station" magnetometer taking readings at 30-second intervals and the other as a hand-carried instrument with a simple, push button operation. Readings were taken at 12.5m intervals along profiles.

GRAVITY SURVEYING: Carbonatites usually have higher density than their host rocks.

Gravimeters are generally used to measure relative gravity, of which there is a wide variety. The most modern gravimeters are Autograv, which include significant improvements compared to the old spring based systems.

An Autograv CG-3 gravimeter was used in the survey on Target I10. Readings were taken every 50m with a local base station visited 3 times a day. The Autograv obtains a reading by continuously averaging a series of one-second samples.

DATA INTERPRETATION: The Company's approach to this involves "layering" survey data sets on geological and structural maps, to produce drill targets.

Results

Ø Interpretation of the results from the first 7 ring structure drill targets has identified 3 priority targets which demonstrate good potential to host to carbonatite (I1, I4 and I10).

- I1 is a large, intense magnetic dipole that spans 17km by 8km and has a shallow depth to source of less than 100m. I1 lies at an intersection of two major regional fault zones.

- I4 spans 7.5km by 5km and has a shallow depth to source of less than 100m.

- I10 spans 2.5km by 2.8km and exhibits high AMT resistivity, coincidental with a gravity high.

Ø These targets appear to sub-outcrop just below the Kalahari sand cover (c.70m), within easy reach of RC drilling within 300m of service.

Ø Anomalous niobium values have been detected on one of these targets (Target I1).

Plans for further Work

Ø Further surveys will be completed on the remaining 3 ring structure targets.

Ø It is proposed to drill the 3 top priority targets before the end of the year. The Environmental Management Plan is in place.

Ø Samples from the drilling will be assayed for whole rock geochemistry and REEs.

The POW/KAV Joint Venture

The Ditau PLs are held in the name of Kavango and are subject to a JV Agreement in which each company holds a 50% interest via Kanye Resources plc. Exploration costs are equally shared. Kavango is the operator. Application has been made to transfer the PLs into a recently established Botswana JV company, Kanye Resources (Pty) Ltd. There are plans to IPO Kanye Resources plc on a recognised stock exchange.

 

Further information in respect of the Company and its business interests is provided on the Company's website at www.kavangoresources.com and on Twitter at #KAV.

 

For further information please contact:

Kavango Resources plc

Ben Turney

bturney@kavangoresources.com 

 

First Equity (Joint Broker)

+44 207 374 2212

Jason Robertson

SI Capital Limited (Joint Broker)

+44 1483 413500

Nick Emerson

 

Kavango Competent Person Statement

The technical information contained in this announcement has been read and approved by Mr Mike Moles (BSc (Geology) & BSocSci (African Studies), who is a Member of the Australian Institute of Mining & Metallurgy (MAusIMM) and has sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Moles is a beneficial shareholder of Kavango Resources plc.

 

NOTES TO EDITORS

THE DITAU PROJECT

The Ditau Project comprises two prospecting licences ("PLs") (PL169/2012 & PL010/2019) that cover an area of 1,386km2. Geophysical and geochemical analyses by Kavango in the two PLs have identified 12 "ring structures".

The "ring structures" have the potential to host carbonatite rocks.

Carbonatites are the principal source of rare earth elements (REEs) including the much sought-after elements Neodymium (Nd) and Praseodymium (Pr), which are used in the manufacture of the new generation of electric vehicles (EVs), magnets and other high-tech applications. Other elements/minerals associated with carbonatites include Niobium, Phosphates, Monazite, Strontium, Magnetite and even Copper.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFLFSADSILIIL
Date   Source Headline
2nd May 20247:00 amRNSZIM – Hillside Option Exercise Update
1st May 20241:51 pmRNS£3.08million Accelerated Bookbuild Closes
29th Apr 20247:00 amRNS£3.08million Accelerated Bookbuild
25th Apr 20244:18 pmRNSBlock listing Review
23rd Apr 20245:12 pmRNSZIM – Hillside Option Exercise
23rd Apr 20247:00 amRNSZIM: 9.95g/t gold intercepted over 7.2m Prospect 2
22nd Apr 20247:00 amRNSZIM: Hillside Exploration & Production Update
19th Apr 20247:00 amRNSBOTS – Drill tender for KCB Phase 1 scope drilling
18th Apr 20247:00 amRNSAnnual Financial Report
16th Apr 20247:00 amRNSZIM: Tailings Resource Upgrade Nara Gold Project
15th Apr 20247:00 amRNSZIM: Hillside Prospect 4 Assay Results
12th Apr 20247:00 amRNSZIM: Nara Project Ground Magnetic Survey Completed
11th Apr 20247:00 amRNSZIM: Grant of sample export permit
2nd Apr 20247:00 amRNSBOTS – Preliminary KCB Heliborne Geophysics Interp
22nd Mar 202410:34 amRNSBOTS: KCB Update
8th Mar 20247:00 amRNSZIM: First Gold Production Commences Immediately
6th Mar 20247:21 amRNSZim: Maiden 5,860/oz Indicated Gold Resource
6th Mar 20247:00 amRNSZim: Maiden 5,860/oz Indicated Gold Resource
23rd Feb 20247:00 amRNSZIM: Hillside IP Surveys & Nara Drilling
25th Jan 20247:00 amRNSDrilling extension at Hillside
23rd Jan 20243:13 pmRNSExtension of Hillside Call Option Agreement
18th Jan 20247:00 amRNSCompletion of KCB airborne geophysical survey
13th Dec 20237:00 amRNSDirector Dealing and New Corporate Presentation
5th Dec 202311:14 amRNSPresentation at Natural Resources Webinar
29th Nov 20237:00 amRNSInvestment in Pambili Natural Resources TSX-V:PNN
29th Nov 20237:00 amRNSKCB – Airborne geophysical survey commences
20th Nov 20237:00 amRNSGrant of New Share Options
16th Nov 20237:00 amRNSKCB – Acquisition of six new PLs completes
10th Nov 20235:04 pmRNSHolding(s) in Company
8th Nov 20237:00 amRNSDirector Holding(s) in Company
6th Nov 20237:00 amRNSDirector/PDMR Shareholding
3rd Nov 20236:24 pmRNSHolding(s) in Company
1st Nov 20236:11 pmRNSHolding(s) in Company
26th Oct 202311:42 amRNSPublication of Prospectus
25th Oct 20233:03 pmRNSResult of General Meeting
23rd Oct 20235:53 pmRNSBlock Listing Six Monthly Return
29th Sep 20237:15 amRNSNotice of General Meeting
25th Sep 20237:00 amRNSKCB – Agreement to acquire six new PLs
13th Sep 20235:21 pmRNSInterim Results
25th Jul 20233:02 pmRNSOption to acquire further Zimbabwe gold projects
25th Jul 20239:20 amRNSKCB – Karakubis Exploration Update
11th Jul 20232:47 pmRNSKSZ – Completion of KSZDD003
30th Jun 20235:33 pmRNSHolding(s) in Company
30th Jun 20235:32 pmRNSHolding(s) in Company
26th Jun 202312:57 pmRNSOption to acquire Zimbabwe gold project
14th Jun 20237:00 amRNSCompletion of £1.4million Financing
8th Jun 20232:47 pmRNSResult of AGM
12th May 20237:03 amRNSCalling of AGM
10th May 20239:38 amRNSKSZ: B Conductor Drill Contract Signed
9th May 20237:00 amRNSConditional £6million two-stage equity investment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.