Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.45    0.25 (11.11%)
Bid:
2.40
Ask:
2.50
Spread: 0.10 (4.167%)
Market Cap: £80.77m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Hernic Project Reaches Full Production

15 Jun 2017 13:30

RNS Number : 2209I
Jubilee Platinum PLC
15 June 2017
 

("Registration number: 4459850")

AIM share code: JLP

AltX share code: JBL

ISIN: GB0031852162 

Jubilee Platinum Plc

("Jubilee" or "the Company")

Hernic Project Reaches Full Production

 

Hernic project operating at full production rate.

 

Jubilee is pleased to announce that its Hernic platinum and chrome processing operations ("Hernic") has achieved 100% of the design throughput of 1 900 tonnes (t) per day of chrome and platinum containing feed material equating to 55 000 t per month.

PGM concentrate production continues to ramp up commensurate with the increased production of approximately 420 ounces of PGM delivered to the refinery.

 

Leon Coetzer, Chief Executive commented:

"I am very pleased to announce that Hernic is up to full operational status. I now look forward to Jubilee receiving the financial benefits that this project will undoubtedly deliver.

We are actively pursuing further opportunities in platinum and base metal processing and will keep the market updated on progress made in this regard."

 

Technical Sign-Off

Andrew Sarosi, Director of Jubilee, who holds a B.Sc. Metallurgy and M.Sc. Engineering, University of Witwatersrand and is a member of the Institute of Materials, Minerals and Mining, is a "qualified person" as defined under the AIM Rules for Companies and a competent person under the reporting standards. The technical parts of this announcement have been prepared under Andrew's supervision and he has approved the release of this announcement.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

15 June 2017

 

Contacts

Jubilee Platinum plc

Colin Bird/Leon CoetzerTel +44 (0) 20 7584 2155 / Tel +27 (0) 11 465 1913Andrew SarosiTel +44 (0)1752 221937

JSE Sponsor

Sasfin Capital, a division of Sasfin Bank LimitedSharon OwensTel +27 (0)11 809 7500

Nominated Adviser

SPARK Advisory Partners LimitedSean Wyndham-Quin/Mark BradyTel: +44 (0) 203 368 3555

Broker

Beaufort Securities LimitedJon BellissTel: +44 (0) 20 7382 8300

 

About the Hernic Project

Hernic Ferrochrome Proprietary Limited ("Hernic") is the world's 4th largest integrated ferrochrome producer with an estimated 3 million tonnes of platinum containing material at surface while Hernic continues to add further material to the surface stock.

The Company was selected as the exclusive party to beneficiate the chromite and PGMs contained in the Hernic Surface Material ("the Project") and address the project execution methodology as well as the operational and financial performance targets. The Project is the second of the Company's Two Projects.

The Hernic Surface Material has been independently fully drilled and assayed for chrome and PGM content. This has resulted in an independent resource statement of 1.7 million tonnes, of which approximately 90% of the resource is classified in the measured category under the internationally recognised SAMREC code. Hernic also has access to secondary surface stocks, which it has internally identified and could increase the surface stocks to in excess of 3 million tonnes through further drilling programmes. The Project is estimated to contain total PGMs in excess of 224 000 (3PGM + Au) oz.

The Project will be the largest PGM beneficiation plant of surface chrome tailings in South Africa and is capable of producing annual revenues of GBP 18.2 million (ZAR 400 million*) at an average metal basket price of USD 906 per (3PGM + Au) per oz. The financial and operational risks of the Project are significantly mitigated since the material is already at surface and requires neither the cost nor the risk associated with mining.

An extensive prefeasibility study has been concluded on the Project, which included both pilot scale and full commercial scale trials to confirm the design and operational parameters.

The Project is to be undertaken in four phases over an 11 month period; namely

· Phase one - Bankable Feasibility Study and Engineering Design. - Completed.

· Phase two - Construction of the chrome and platinum processing plant ("Processing Plant"). - Completed.

· Phase three - Commissioning and Ramp up of Processing Plant to design capacity of 55 000 tonnes per month. - Completed.

· Phase Four - Stable operation of the Processing Plant.

 

The Company has targeted a combined processing of platinum containing surface material over the two projects in excess of 900 000 tonnes per annum.

The ZAR-based debt funding for both surface projects equates to GBP 11.5 million (ZAR 255 million*) before financing costs. The working capital required to bring the two surface projects into operation and to achieve positive earnings is estimated at GBP 3.4 million (ZAR 75 million*).

*=Conversion as at the commencement of the Project

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDGGUWPQUPMGPA
Date   Source Headline
21st Aug 20237:00 amRNSSouth Africa and Zambia Project Expansion Update
14th Aug 20237:00 amRNSAppointment of CFO and Head of Energy Metals
20th Jul 20237:00 amRNSOperational Update for full year to 30 June 2023
6th Jun 20237:00 amRNSEXPANSION OF CHROME AND PGM FOOTPRINT
4th May 20233:29 pmRNSExercise of Options
24th Apr 20237:00 amRNSCompany Update
23rd Mar 20234:35 pmRNSPrice Monitoring Extension
20th Mar 20237:00 amRNSHalf-Yearly Financial Report to 31 December 2022
17th Mar 20237:00 amRNSNotice of Results
17th Feb 20231:00 pmRNSDirector/PDMR Shareholding
17th Feb 20237:00 amRNSDirector/PDMR Shareholding
16th Feb 20237:00 amRNSInvestor Presentation
15th Feb 20239:05 amRNSSecond Price Monitoring Extn
15th Feb 20239:00 amRNSPrice Monitoring Extension
15th Feb 20237:00 amRNSOperations Update 6 months to 31 December 2022
24th Jan 202312:11 pmRNSTR-1: Notification of major holdings
23rd Jan 20238:00 amRNSExercise of Warrants
18th Jan 20233:48 pmRNSExercise of Warrants - Correction
18th Jan 20238:00 amRNSIssue of Equity
13th Jan 20232:05 pmRNSSecond Price Monitoring Extn
13th Jan 20232:00 pmRNSPrice Monitoring Extension
12th Jan 20234:40 pmRNSSecond Price Monitoring Extn
12th Jan 20234:35 pmRNSPrice Monitoring Extension
19th Dec 20227:00 amRNSZambia Update, Corporate Update & Warrant Exercise
24th Nov 20227:30 amRNSExercise of Warrants
22nd Nov 20228:51 amRNSCopper and Cobalt Operations Update
18th Nov 202212:00 pmRNSExercise of Warrants
16th Nov 20223:48 pmRNSResult of AGM
4th Nov 20227:00 amRNSExercise of Warrants
25th Oct 20227:02 pmEQSJubilee Metals on course for next level after transformational year, says CEO
25th Oct 20222:50 pmEQSJubilee Metals on course for next level after transformational year, says CEO
25th Oct 20227:00 amRNSAudited Results for the year ended 30 June 2022
21st Oct 20227:00 amRNSNotice of Results
7th Oct 20224:35 pmRNSPrice Monitoring Extension
14th Sep 20224:30 pmRNSExercise of Warrants
9th Sep 20224:35 pmRNSPrice Monitoring Extension
5th Sep 20227:00 amRNSProject Roan Achieves Nameplate Capacity
25th Aug 20222:25 pmRNSExercise of Warrants
10th Aug 20227:00 amRNSOperations Update for the 6 months to 30 June 2022
26th Jul 20227:00 amRNSExercise of Warrants
14th Jul 20227:00 amRNSBoard Appointment and Update on Board Committees
13th Jul 20227:00 amRNSZambia Progress Update
13th Jun 20223:51 pmRNSDirector/PDMR Shareholding
30th May 20227:00 amRNSExercise of Options
27th May 20227:00 amRNSGranting of Options
26th May 20227:00 amRNSAppointment of New Chairman and Joint Broker
16th May 20221:00 pmRNSResults of General Meeting
16th May 20227:00 amRNSCompany Update
20th Apr 202211:30 amRNSCorrection: Notice of General Meeting
19th Apr 20227:00 amRNSNotice of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.